AKORA is developing a highgrade Direct Shipping Ore
(DSO) iron ore mine in
Madagascar.
This will be further developed
into serving the steel industry’s
accelerating focus on reducing
carbon dioxide (greenhouse
gas) emissions through
decarbonisation.
Highlights
• Indicated high-grade iron ore DSO Resource
defined for the Bekisopa Southern Zone
• Appointed an Independent Non-Executive
Director - Matt Gill
• 2023 Infill DSO Drilling Campaign
commenced at Bekisopa North and Central
zones (and was completed before quarter’s
end)
• Madagascan President signs the Revised
Mining Code
Pursuant to the requirements of the Listing Rules, the Board of Directors for AKORA Resources Limited
has approved this announcement on the Quarterly Activities Report and Quarterly Cashflow Report.
1|P a g e
Bekisopa Iron Ore Project
Ownership 100% | Madagascar, Africa
The Bekisopa Iron Ore Project in Madagascar hosts an Inferred Resource of 194.7
million tonnes (Mt)1 with the potential to produce high-grade Direct Shipping Ore
products, followed by a premium grade 67.6% iron concentrate suitable for Direct
Reduced Iron (DRI) pellets for the steel industry’s accelerating focus on reducing
greenhouse gas emissions through decarbonisation.
Infill drilling campaign completed
During the quarter, 65 Drill pads on a 50-metre by 50-metre grid were prepared in the Northern
and Central Zones of the Bekisopa iron ore project 6-kilometre strike length.
Diamond drilling commenced on 20 July and was completed in October, with 905 metres
drilled.
Subsequent to the end of the quarter, AKORA reported significant iron mineralisation
intercepts at its Bekisopa Project after completing this fourth drilling campaign.
Drilling intercepts averaged around 18.0m along a 6km strike in the north, and 9.2m in the
central tenement.
Nine additional shallow drill holes were included below outcropping iron ore rock formations in
the Southern zone in an area to the east of the 2022 drilling campaign to test for a possible
mineralisation extension in that area.
The Company’s ongoing priority over recent drill campaigns has been to better define the
Direct Shipping Ore (DSO) tonnage and grade, within the larger resource, to aid production
planning.
1
ASX Announcement 11 April 2022
2|P a g e
Figure 1. Bekisopa Iron Ore Project location with northern, central and southern zones
delineated. Satrokala Project is located around 40km to the west of Bekisopa.
Figure 2. Bekisopa infill drill locations 2023 which targeted the north and central zones of the
6km strike zone of major magnetic anomalies.
3|P a g e
All geological field logging has now been completed, and the iron ore mineralisation interval
samples have been delivered to the OMNIS Laboratory in Antananarivo for preparation into
assay pulps. The assay pulps will be delivered to the ALS Iron Ore Technical Centre in Perth
in three batches during October and November. The expectation is that all the assay results
will be reported in late January 2024 and an updated Mineral Resource Estimate completed in
Q1 2024.
Direct Shipping Ore (DSO) Resource Upgrade1
In the quarter, AKORA announced (ASX Announcement 11 July 2023) it had increased
Bekisopa’s total DSO resource (Inferred and Indicated) to 9.1Mt (which excludes the highgrade outcrop) after all 2022 infill drilling assay results, and the previous 2020 and 2021 drilling
results, were provided to Wardell Armstrong International (WAI).
5.5Mt DSO tonnes (Inferred and Indicated) at 60.3% Fe were added along Bekisopa’s 6km
strike in the project’s southern zone, representing a 34% increase. Within this resource is a
4.4Mt Indicated DSO Resource grading 60.9% Fe.
Indicated DSO Resource
4.4Mt at 60.9% Fe
Figure 3. Bekisopa has an overall Inferred Resource of 194.7Mt which has the potential to
produce a 67.6% concentrate grade at 75 micron grind size.
Bekisopa has an overall Inferred Resource of 194.7Mt which has the potential to produce a
67.6% concentrate grade at 75 micron grind size2. Within this resource, the Company has now
defined a 34Mt high-grade, “Green Steel” Inferred Resource in the project’s southern zone
which graded 45.3% Fe (58% Davis Tube Recovery) and could deliver a 21.1Mt of 68.7% Fe
concentrate at 75 microns.3 This represents just 30% of the overall prospective 6 kilometres of
mineralisation identified at Bekisopa. Further, it does not include any of the mineralisation
1
Indicated Mineral Resource Classification. The Mineral Resource classification for the Bekisopa Southern Zone was
undertaken by WAI in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves [JORC Code (2012)]. WAI considers that the Bekisopa Southern Zone has been sufficiently explored to assign an
Indicated Resource and an Inferred mineral resource as defined by the JORC Code (2012). The relatively close spaced drilling in
areas of Bekisopa South are enough for iron mineralisation continuity to be assumed. WAI believes that an absence of an overall
geological and structural model precludes the classification of Measured Mineral Resources. WAI recommends that a geological
and structural model for the deposit should be developed. Such a model should assist in defining a higher category MRE. There
are no known mining, metallurgical, infrastructure, or other Modifying Factors that materially affect this Mineral Resource Estimate,
at this time.
2 Refer ASX release dated 11 April 2022 “Bekisopa Total Maiden Inferred Resource 194.7 million tonnes”
3 “Green Steel” Resource is the term Wardell Armstrong International has given to a section of very high-grade
fresh rock iron ore mineralisation that has been shown to readily upgrade to produce a high-grade concentrate ideal
for direct reduced iron pellets for Green Steel (i.e. low carbon emissions) production.
4|P a g e
potential from the Satrokala deposit to the south, where between 10 and 30 kilometres of
potential iron mineralisation has been identified.
This “Green Steel Resource” can be readily mined from an optimised open pit shell. after
selectively mining the DSO during a start-up first phase operation. Only 1.7 mined tonnes
would be required to produce 1 tonne of 68.7% Fe concentrate, compared to 2.6 mined tonnes
previously expected. This offers significant opportunities to lower capital and operating costs,
during the “Green Steel” second phase.
Figure 4. A newly defined “Green Steel Resource” in Bekisopa’s southern zone which
graded 45.3% Fe could deliver a 68.7% iron ore concentrate for use in a Direct ReducedElectric Arc Furnace.
Scoping Study Update
The Scoping Study being prepared by WAI is now expected to be reported in November. It
uses the 2022 DSO Indicated Mineral Resource tonnes (4.4Mt) and grade (61% Fe) to develop
a low capital cost start-up operation. The DSO material will be mined and processed through
a simple crushing and screening plant to produce conventional lump and fines products (lump
is -31.5+6.3mm; fines is -6.3mm). A 40:60 split of lump:fines has been assumed. It is
anticipated that there is sufficient DSO material for approximately the first ±five years of
operation (though this could be extended to potentially 8 to 10 years with additional exploration)
before the switch to processing of the massive and coarse disseminated fresh iron
mineralisation to produce a Fines concentrate. This is important as, for a relatively low
processing capital cost requirement, cashflow can be quickly generated and used to conduct
the more detailed studies and testwork required for the main processing options to follow once
the DSO material has been exhausted.
An additional DSO scenario is now being included which is a minimal capital cost start-up case
using “Fit for Purpose” capital. For example, rather than a conventional fixed crushing and
screening process plant design, this new scenario considers using mobile crushing and
screening plants to reduce initial capital costs and deliver operational flexibility. Similarly, costs
5|P a g e
in product transport using contractor equipment and operators, rather than owner operators is
being considered. An AKORA dedicated port stockpiling area is being considered which uses
a third-party for transhipping and ship loading.
This alternate scenario provides the Company with two capital and operating cost options for
the various stages of the proposed DSO start-up. The option that offers the best capital and
operating cost trade-offs, and optimum risk management profile will be progressed as part of
the planned Pre-Feasibility Study (PFS).
Community consultation
The AKORA Board expects to commence the Bekisopa PFS later this year. In preparation for
the PFS we have commenced a Community Consultation and Environmental Impact
Assessment Review process.
Figure 4. AKORA provided medical supplies to the local Tanamarina medical facility.
Figure 5. Educational equipment for the school teacher and students provided by AKORA.
6|P a g e
AKORA Managing Director Mr Paul Bibby and new Director Mr Matt Gill visited Bekisopa
during the quarter to host community meetings at the Tanamarina and Bekisopa villages. Early
feedback was supportive and encouraging.
Following a request from the local Tanamarina medical facility, AKORA provided a selection
of medical supplies to ensure better medical outcomes for the local village communities.
As the new school year commenced in September, AKORA provided educational supplies, as
requested by the teacher, for the teacher and the students. Providing these items was very
well received by the local community and continues to build on the relationship between the
company and the various local village communities.
On returning to Antananarivo, the capital of Madagascar, meetings were held with the Mining
Ministry, engineering firms and associates.
An environmental survey will also be performed across the Bekisopa tenement area to
establish a reference point for future studies.
A weather monitoring station has been installed in the local Tanamarina village around 25km
from the Bekisopa tenements to continuously capture temperature, see Figure 6, wind and
rainfall data over the next 12 plus months for incorporation into the PFS.
Figure 6. Weather monitoring station has been installed to capture relevant weather data to
assist design during the PFS.
7|P a g e
Satrokala Project
Ownership 100% | Madagascar
Magnetic Survey
The original planned approach for the magnetic survey at both Satrokala and Tratramarina
was to use a helicopter brought into Madagascar especially for this survey work. Unfortunately,
AKORA was unable to obtain the necessary clearances for the importing of the helicopter and
associated equipment in a timely manner.
As a result, the plan now is to use ground magnetic survey equipment, the same technique as
was used in 2019 at Bekisopa. This equipment will be delivered into Antananarivo and then
the survey team will be mobilised to the southern Satrokala tenements by late October. As the
team will be walking the ground, rather than the more efficient flying, to obtain the magnetic
survey data at this time, only the area where previous rock chip sampling in 2022 at Satrokala
was done will be surveyed and not the other Satrokala or the Tratramarina tenements. This
will still involve covering some 10 kilometres of highly prospective iron mineralisation.
Figure 7. Satrokala +60%Fe rock chips along 10km strike length.
8|P a g e
Corporate
Shareholder Information
As at 30 September 2023, the Company had 657 shareholders and 94,982,814 ordinary fully
paid shares on issue with the top 20 shareholders holding 60.56% of the total issued capital.
Board and Senior Management
Mike Stirzaker
Paul Bibby
Matthew Gill
John Madden
Non-executive Chairman
Managing Director & Chief Executive Office
Non-executive Director
Chief Financial Officer
ASX Announcements during the quarter
The following announcements were lodged on the ASX Market Announcements Platform
during the quarter:
Date
Description
11 July 2023
31 July 2023
2 August 2023
8 August 2023
24 August 2023
24 August 2023
28 August 2023
8 September 2023
Bekisopa Southern Zone Mineral Resource
Quarterly Report
Appointment of MD Gill as Non-executive Director
Update Northern & Central Bekisopa Drilling
Half Year Report
Replacement Mining Code
Resignation of Director
Africa Down Under Presentation
These announcements are available for viewing on the Company’s website
www.AKORAVY.com.
Matt Gill Appointed Independent Non-Executive Director – 1 August 2023
During the quarter, Mr Matthew Gill, a mining engineer with over 40 years’ experience, was
appointed as an Independent Non-Executive Director to the AKORA Resources Board. He has
held various key management and executive roles in both national and international
jurisdictions. Mr Gill’s technical studies, exploration and operational and corporate experiences
in the minerals industry will add a broad range of skills for advancing AKORA in the next phase
of the company’s progression.
Resignation of Director
On 28 August 2023, the Company announced that Mr John Madden had elected to resign as
a director of the Company on 25 August 2023. Mr Madden will continue as Chief Financial
Officer and Company Secretary until 31 December 2023 when he will step down from all duties
with the Company.
9|P a g e
Madagascan President Signs the Revised Mining Code
After several years of discussion and consultation with the mining industry, both Houses of the
Malagasy Government passed the Revised Mining Code into law on 7 June 2023. Following a
review for Constitutional and Legal implications of the Mining Code, the President of
Madagascar declared the Mining Code approved on 27 July 2023.
This significant event occurred following the Malagasy Council of Ministers approving the
Ministry of Mines and Strategic Resource to resume processing applications for all mining
permits on 30 March 2023 (AKORA - ASX Announcement 4 April 2023.)
The Implementation Rules will now be prepared and these Rules will enable exploration and
mining companies to understand how to progress against the Revised Mining Code. When
these Implementation Rules become available the company will provide commentary on how
they influence AKORA.
Changes in the Revised Mining Code that the company currently understand are that the
mining royalty will increase from 2 to 5% - this compares to a 7.5% royalty for Direct Ship Iron
Ore in Western Australia. The revised Mining Code states that when transformation / upgrading
of the mined product occurs, within Madagascar, then the royalty reduces from 5% to 3.5%.
Our present understanding of ‘Transformation’ of a mineral substance means that all
operations that give mineral substances a different appearance than the original, or to modify
their chemical or mineralogical composition, in order to valorise them. The degree of
transformation will need to be confirmed once the particular Implementation Rule is
announced. For comparison, the royalty in Western Australia for upgrading iron ore to a higher
grade concentrate is 5%.
The corporate income tax rate in Madagascar is 20%.
Other details
Head Office
211 McIlwraith Street
North Carlton Vic 3054
Phone: +61 7 3535 1208
Website: www.akoravy.com
This announcement is authorised by the Board.
For further information contact:
Paul Bibby
Managing Director
AKORA Resources
+ 61 (0) 419 449 833
paul.bibby@AKORAvy.com
10 | P a g e
Matthew Lindh
Corporate Advisor
Harbury Advisory Pty Ltd
+ 61 (0) 432 363 933
mlindh@harbury.com.au
Gareth Quinn
Investor Relations
Republic PR
+ 61 (0) 417711108
gareth@republicpr.com.au
Company Profile
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa, Satrokala, Tratramarina and Ambodilafa Projects, all iron ore
prospects in Madagascar where the company holds 308km2 of tenements across these
prospective exploration areas.
The Bekisopa Iron Ore Project is a high-grade iron ore project with an ~6km strike length and
an Inferred Resource of 194.7 million tonnes. Bekisopa has outcropping and weathered zone
Direct Shipping Ore (DSO) iron ore and also has the potential to produce a premium grade
+68% iron concentrate suitable for Direct Reduced Iron pellets for a green steel future.
11 | P a g e
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AKORA Resources Limited
ABN
Quarter ended (“current quarter”)
90 139 847 555
30 September 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
1.2
Receipts from customers
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
Dividends received (see note 3)
Interest received
Interest and other costs of finance paid
Income taxes paid
Government grants and tax incentives
Other
(Cash Boost from Commonwealth
Government)
Net cash from / (used in) operating
activities
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f) other non-current assets
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
Cash flows from loans to other entities
Dividends received (see note 3)
2.2
2.3
2.4
12 | P a g e
Year to date
(nine-months)
$A’000
-
-
(934)
(1,229)
(129)
(274)
(270)
(872)
3
3
(1,334)
(2,368)
Consolidated statement of cash flows
2.5
2.6
Other
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
Proceeds from issue of convertible debt
securities
Proceeds from exercise of options
Transaction costs related to issues of equity
securities or convertible debt securities
Proceeds from borrowings
Repayment of borrowings
Transaction costs related to loans and
borrowings
Dividends paid
Other (provide details if material)
Net cash from / (used in) financing
activities
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
Net cash from / (used in) operating
activities (item 1.9 above)
Net cash from / (used in) investing activities
(item 2.6 above)
Net cash from / (used in) financing activities
(item 3.10 above)
Effect of movement in exchange rates on
cash held
Cash and cash equivalents at end of
period
4.2
4.3
4.4
4.5
4.6
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(nine-months)
$A’000
-
-
-
3,579
-
(157)
-
3,422
3,110
722
(1,334)
(2,368)
-
-
-
3,422
-
-
1,776
1,776
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in
the consolidated statement of cash
flows) to the related items in the
accounts
5.1
5.2
5.3
5.4
5.5
Bank balances
Call deposits
Bank overdrafts
Other US dollar accounts
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
13 | P a g e
29
1,701
55
3,055
46
1,776
3,110
6.
Payments to related parties of the entity and their
associates
6.1
6.2
Current quarter
$A'000
Aggregate amount of payments to related parties and their
associates included in item 1
Aggregate amount of payments to related parties and their
associates included in item 2
129
-
Note: Salaries for executive directors are allocated to both corporate and exploration activities. All directors deferred salary
and superannuation benefits in the first quarter and therefore the April-June Quarter resulted in payment of salaries and
benefits for the entire six-month period.
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
Add notes as necessary for an understanding of
the sources of finance available to the entity.
7.1
7.2
7.3
7.4
Loan facilities
Credit standby arrangements
Other (Convertible Notes)
Total financing facilities
7.5
7.6
Unused financing facilities available at quarter end
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
$A’000
8.
Estimated cash available for future operating activities
8.1
8.2
8.3
8.4
8.5
8.6
8.7
Net cash from / (used in) operating activities (item 1.9)
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
Total relevant outgoings (item 8.1 + item 8.2)
Cash and cash equivalents at quarter end (item 4.6)
Unused finance facilities available at quarter end (item 7.5)
Total available funding (item 8.4 + item 8.5)
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
(1,334)
(1,334)
1,776
1,776
1.3
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A.”
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
14 | P a g e
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating cash
flows for the time being and, if not, why not?
Answer: The board of directors forecast expenditure to decline over the next two quarters
as the current quarter was impacted by a drilling programme that has been completed
with analytical results to be reported.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further cash to
fund its operations and, if so, what are those steps and how likely does it believe that they
will be successful?
Answer: The board of directors has not as at the date of this Quarterly Report taken any
measures to raise new capital; however, the board of directors acknowledge that new
capital will be required during 2024.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
15 | P a g e
Compliance statement
1
2
This statement has been prepared in accordance with accounting standards and policies which comply
with Listing Rule 19.11A.
This statement gives a true and fair view of the matters disclosed.
Date:
29 October 2023
Authorised by:
JM Madden (Company Secretary)
(Name of body or officer authorising release – see note 4)
Notes
1.
2.
3.
4.
5.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s
activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes
to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and
provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this
report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX
pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board.” If it has
been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of board
committee – e.g. Audit and Risk Committee].” If it has been authorised for release to the market by a disclosure committee, you
can insert here: “By the Disclosure Committee.”
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records
of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true
and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk
management and internal control which is operating effectively.
16 | P a g e
Tenement Holding in Madagascar
Tenement
Number
Name
Blocks
Equity
10430
Bekisopa PR
64
Iron Ore Corporation
Madagascar sarl
100%
27211
Bekisopa PR
128
Iron Ore Corporation
Madagascar sarl
100%
35827
Bekisopa PR
32
Iron Ore Corporation
Madagascar sarl
100%
3757
Bekisopa PRE
16
Randriamananjara
(Acquired under Sale &
Purchase Agreement)
100%
6595
Samelahy PR
98
Mineral Resources
Madagascar sarl
100%
13011
Samelahy PR
33
Mineral Resources
Madagascar sarl
100%
21910
Samelahy PR
3
Mineral Resources
Madagascar sarl
100%
16635
Tratramarina East PR
144
Universal Exploration
Madagascar sarl
100%
16637
Tratramarina East PR
48
Universal Exploration
Madagascar sarl
100%
17245
Tratramarina East PR
160
Universal Exploration
Madagascar sarl
100%
18379
Tratramarina West PRE
16
18891
Tratramarina West PRE
48
17 | P a g e
Holder
Rakotoarisoa
(Acquired under Sale &
Purchase Agreement)
Rakotoarisoa
(Acquired under Sale &
Purchase Agreement)
100%
100%
Competent Person’s Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on information compiled
by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time employee of Vato Consulting LLC. Mr. Leeuwner is a
registered Professional Natural Scientist (Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific
Professions (SACNASP). Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and the activity being undertaken to qualify as a Competent Person as defined in the Note for
Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the 2012 Edition of the ‘Australian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of
the information in this release in the form and context in which it appears.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical information, is based on,
and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a Metallurgist and Managing Director of Akora
Resources Limited (AKO), as such he is a shareholder in Akora Resources Limited. Mr Bibby is a Fellow of the Australasian
Institute of Mining and Metallurgy (FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of
mineralisation and its processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters based on his information
in the form and context in which it appears including analytical, test data and mineral processing results
18 | P a g e
AKORA RESOURCES LIMITED
Top 20 Shareholders
27 October 2023
No
Registered shareholder
Shares
%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
SALARIS FLEET PTY LTD
CITICORP NOMINEES PTY LIMITED
MR NICHOLAS JOHN AXAM
FUTUREWORLD MANAGEMENT PTY LTD
TRAVIS ANDERSON
JOHN CHARLES TUMAZOS
HSBC GLOBAL CUSTODY NOMINEES UK LIMITED
WAYNE ANTHONY HOSE
JORDAN EQUITIES PTY LTD
EVANACHAN LIMITED
ALAFACI NOMINEES PTY LTD
BNP PARIBUS PTY LTD
PAUL GERARD BIBBY
MR DAVID YONAN
SIMON RUSSELL FRANCIS
MRS SONIA SHARMA
CLINE MINING CORPORATION
DALESAM PTY LTD
STEPHEN LESLIE FABIAN
MR MICHAEL FRANCIS & MRS MARYANNE FRANCIS
11,151,570
7,755,212
5,897,254
5,083,516
3,473,855
3,353,486
2,732,743
2,457,067
1,986,760
1,811,628
1,800,000
1,604,867
1,584,758
1,371,500
1,222,019
1,107,069
981,492
889,793
893,636
885,000
11.74%
8.16%
6.21%
5.35%
3.66%
3.53%
2.88%
2.59%
2.09%
1.91%
1.90%
1.69%
1.67%
1.44%
1.29%
1.17%
1.03%
0.94%
0.94%
0.93%
Top 20 Sharehpolders
Remainder
Total number of shares on issue
58,043,225
36,939,589
94,982,814
61.11%
38.89%
100.00%
Directors holdings (both direct and indirect):
PG Bibby
MD Gill
MH Stirzaker
19 | P a g e
2,485,918
0
600,000
3,085,918
3.25%
AKORA RESOURCES LIMITED
Top 20 Shareholders
24 July 2023
No
Registered shareholder
Shares
%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
SALARIS FLEET PTY LTD
CITICORP NOMINEES PTY LIMITED
MR NICHOLAS JOHN AXAM
FUTUREWORLD MANAGEMENT PTY LTD
TRAVIS ANDERSON
JOHN CHARLES TUMAZOS
HSBC GLOBAL CUSTODY NOMINEES UK LIMITED
JORDAN EQUITIES PTY LTD
EVANACHAN LIMITED
ALAFACI NOMINEES PTY LTD
PAUL GERARD BIBBY
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED
MR DAVID YONAN
SIMON RUSSELL FRANC
Share your feedback
Discover