Exploration Results
Released
Released
Announcement PDF
27 April 2021
The Manager
Company Announcements Office
ASX Limited
Level 4, Exchange Centre
20 Bridges Street
Sydney NSW 2000
Dear Sirs
ANALYTICAL RESULTS FROM 2020 DRILL PROGRAMME
Pursuant to the requirements of Listing Rules, please find attach an announcement
authorised by the AKORA board of directors.
Yours faithfully
JM Madden
Company Secretary
For further information please contact:
Paul G Bibby
Managing Director
Mobile: +61(0) 419 449 833
Website: www.akoravy.com
AKORA DELIVERS FURTHER OUTSTANDING DRILL RESULTS
WITH IRON ORE PRODUCT GRADES UP TO 66.9% FE
All assay and processing trial results for drill holes 9 to 12 from the 2020 drilling
programme have been received and show outstanding intersections and product
grades for the southern area of the Bekisopa Iron Ore Project.
Highlights – Assay Results
•
Assays confirm continuation of significant, near surface, high-grade iron mineralisation
in a shallow dipping mineralisation zone and confirms 4km strike
•
Iron mineralisation is outcropping and is at least 45m true thickness, across three drill
holes (BEKD9-BEKD11), and importantly increasing in thickness with depth.
•
Significant continuous iron mineralisation intercepts from surface, with 25.2m @
61.4% Fe including 13.6m @ 63.5% Fe
Highlights – Processing Results
•
Iron mineralisation in the southern area upgrades extremely well at a coarse crush size
of minus 2mm.
•
Product grades up to 66.9%Fe achieved after crushing to minus 2mm and wet low
intensity magnetic separation (LIMS), with potential for a high quality premium DSO
fines product
•
Iron recoveries up to 90.6% with average mass yields of 70% for the massive
magnetite
•
Like the northern and central areas previously reported (See ASX Announcement
dated 13 April 2021), drilling has confirmed continuity of iron mineralisation at depth in
the southern area, with thickness increasing to the west.
•
The next ~4000m drilling campaign is designed to deliver an initial resource estimate
reportable under JORC guidelines and is expected by the end of 2021;
AKORA Resources Managing Director, Paul Bibby commented on the results, “Assays
for the final 4 drill holes of the 12-drill hole programme conducted in 2020 have been received
and clearly indicate the significant potential for Bekisopa to be a high-grade iron ore project.”
“The results show extensive iron mineralisation intercepts from surface with mineralisation
increasing in thickness with depth. The laboratory results again show that the Bekisopa
project has the potential to deliver an extremely high-grade iron ore product. The product
grade of 66.9% Fe is outstanding along with the excellent iron recovery at 84%. More
importantly, the Bekisopa product results have been achieved after only minimal processing
by crushing to 2mm followed by magnetic separation. The final product grade is exceptional
and believed better than comparable iron ore projects. Our outlook for the coming JORC
Resource estimate is very positive and we will continue to deliver on our stated strategy to
progress Bekisopa toward a significant high grade, low-cost iron ore project.”
1|Page
Introduction
Akora Resources Limited (ASX: AKO) is pleased to report on the remainder of the assay
results delivered from the drilling campaign conducted in 2020 (see ASX Announcement,
dated 17 December 2021) following on from results from the first 8 drill holes reported in 2021
(see ASX Announcement, dated 13 April 2021).
The laboratory results from the remaining 4 drill holes at Bekisopa (drill holes 9 to 12), all
located in the southern area of the project, have been received for both the chemical assay
and mineral processing (Low Intensity Magnetic Separation (LIMS) test work). The laboratory
analytical analysis was completed respectively by ALS Laboratories in Ireland and Western
Australia.
The results confirm the previous interpretation of a broad, shallow (15°) westerly dipping iron
mineralised zone with a true thickness of at least 45 metres, increasing to the west. The
mineralised zone outcrops and is continuous from surface. Simple coarse crushing and wet
LIMS test work generated outstanding recoveries of up to 90.6%Fe and delivered product
grades of up to 66.9%Fe. These final laboratory results confirmed the excellent qualities of
the Bekisopa mineralisation and highlight the potential for low capital and operating costs and
high-grade iron ore product.
Discussion
In summary, the drilling has confirmed the previous interpretation of an outcropping zone of
massive and coarse disseminated magnetite +/- hematite in the southern area of the project
area, starting at surface and continuous to the limit of drilling to date (see Figures in Appendix
1). The mineralisation corresponds with the magnetic anomalies set out in the plan in
Appendix 1 (ie., the stacked profiles of total magnetic intensity). The magnetics data suggests
semi-continuous mineralisation over at least 6km strike with drilling to date confirming 4kms
of this strike length.
The new results show very high-grade massive mineralisation is present in each of the
lateritised surficial, totally oxidised weathered, transitional and fresh rock zones. This outcome
clearly suggests the potential for large scale mineralisation at depth and to the west.
The modelling from the ground magnetic survey has been proven by the drilling programme
and the drilling campaign proposed for this year will enable the Company to deliver a JORC
resource by the end of the year.
2|Page
Significant Iron Intercepts
Results from the remaining 4 drillholes, BEKD9 to BEKD12, show the following significant
iron intercepts:
Note: Bold text represents overall intercepts, normal text sub-intercepts; blue text intercepts averaging over 50% Fe.
Hole
Number
BEKD09
incl.
and
From
To
(m)
(m)
0.0
49.3
0.0
11.3
11.3 49.3
incl. 42.8
Interval Fe SiO2
(m)
(%) (%)
49.3
39.3 21.7
11.3
51.3 14.8
38.0
35.7 23.7
47.3
4.5
60.3 4.3
Al2O3
P
Comments
(%)
(%)
3.3
0.10 composite zone
4.7
0.03 weathered zone
2.9
0.12 transition and fresh rock
zone
1.0
0.20 fresh rock zone
BEKD010
incl.
incl.
also incl.
incl.
incl.
0.0
0.0
0.0
6.7
13.1
32.8
37.2
6.7
3.2
37.2
36.7
36.7
37.2
6.7
3.2
30.5
23.6
3.9
47.5
53.7
61.3
46.2
51.1
63.6
17.0
13.6
7.2
17.8
13.4
3.2
3.2
3.3
3.7
3.2
2.9
1.0
0.08
0.04
0.10
0.09
0.10
0.08
composite zone
weathered zone
lateritised zone
transition zone
transition zone
transition zone
BEKD11
incl.
incl.
incl.
also incl.
0.0
0.0
0.0
0.0
11.6
28.3
25.2
11.6
4.4
25.2
28.3
25.2
11.6
4.4
13.6
58.7
61.4
58.9
62.4
63.5
6.7
4.9
7.7
4.1
2.6
2.1
1.9
3.0
2.6
0.9
0.09
0.08
0.08
0.08
0.09
composite zone
composite zone
weathered zone
lateritised zone
transition zone
BEKD12
0.0
1.5
1.5
56.0 8.5
4.9
0.12 lateritised zone
The locations, cross sections and assay intervals are shown on the plan and cross sections
in Appendix 1 whilst drill hole details and other element assays are shown in Appendix 3.
The drill core chemical analysis, field testing and observations, in combination with the drill
core intercepts, confirm the following:
•
There is a broad, shallowly dipping iron mineralised zone with a true thickness
(including eroded parts) of at least 45 metre, across drill holes 9, 10 and 11 in the south
of the permit area, with intersection averages between 39% and 59% Fe
•
Drillhole BEKD12 did not intersected significant mineralisation and suggests the
mineralisation may be dipping to the east rather than to the west in this area (see figure
in Appendix 1) and therefore, this location remains a valid target
•
There is a slight elevation in grade within the weathered zone, probably due to
weathering of the country rock. This is illustrated by the general increase in average
grade at shallower depths (see cross-section in Appendix 1)
•
There are several bands of massive magnetite-hematite, which grade greater than
60%Fe, in both oxidised and fresh rock:
3|Page
o
o
o
o
25.2m @ 61.4% Fe in the oxidised (lateritised) zone in drillhole BEKD11
13.6m @ 63.5% Fe in transition zone in drillhole BEKD11
3.2m @ 61.3% Fe in the oxidised (lateritised) zone in drillhole BEKD10
3.9m @ 63.6% Fe in the transition zone in drillhole BEKD10
•
The massive mineralisation continues at depth
•
The iron mineralisation tested to date in the south of the permit area has been
confirmed as being relatively flat lying, dipping at about 15° to the west as shown on
the cross-section in Appendix 1.
•
Total true width is currently shown to be at least 45m in the southern area tested to
date (including eroded parts) and appears to be increasing in thickness to the west
•
Preliminary mineral processing test work on the southern area indicates mineralisation
is capable of producing a high-grade iron ore product grading up to 66.9%Fe (average
66.5%Fe) from the massive magnetite at a relatively coarse crush size of 2mm
•
Wet LIMS trials recovered up to 90.6% of the iron (average 78%) for a mass recovery
of 70% from the massive magnetite iron mineralisation
•
The Company proposes to conduct additional processing trials to maximise the iron
content and recovery in the product fraction by recovering hematite and goethite that
appears to remain in the non-magnetic fraction
Mineral Processing
First pass mineral processing test work was conducted at the ALS Iron Ore Technical Centre
in Perth to examine the processing characteristics of the iron mineralisation. These
unoptimized trials were performed on various crushed splits from the drill core extracted during
the crushing process for preparing the analytical pulps.
Splits were collected after the core was crushed to minus 10mm to simulate a potential lump
product, and then after the core was crushed to minus 2mm. The 10 and plus 2mm samples
were treated using the LIMS equipment in the dry mode, which effectively separates the feed
material into magnetic and non-magnetic fractions using a drum magnet. The minus 2mm
LIMS test were conducted in the wet mode.
The minus 2mm fractions from the southern area (massive and coarse disseminated
mineralisation) returned excellent results as shown in the table below:
Magnetic
Fraction
Sample
BEKMETF02
BEKMETF04
BEKMETF05
BEKMETF12
Average
4|Page
Magnetic Fraction Grade
%
Fe
Si
Al2O3
P
O2
66.5 1.7
0.6
0.05
66.9 2.0
2.2
0.02
65.1 2.6
0.6
0.05
59.3 7.1
1.7
0.05
64.5
3.4
1.3
0.04
Iron
Recovery
%
Calc
Head
Fe%
Mass
Recovery
%
90.6
83.9
58.9
59.3
58.2
60.0
61.0
38.7
79.4
75.3
55.1
54.1
73.2
55.2
66.0
Iron
Mineralisation
Type
Massive
Massive
Massive
Coarse
Disseminated
Magnetic fraction, -2mm, 900 gauss magnetic drum separation, wet LIMS (Est Head = head grade estimated from combination
of individual samples, Calc Head = head grade back calculated from combined magnetics and non-magnetics assays)
The first pass, unoptimized processing results are outstanding and indicated that the
mineralisation should be readily upgraded to a DSO fines product through conventional
crushing to minus 2mm and magnetic separation.
It is important to note that the Bekisopa magnetite mineralisation is very different from that
seen elsewhere. Australian BIF magnetites are energy intensive as the magnetite is required
to be ground to less than 50 microns to produce a product grade equivalent to that at Bekisopa.
The Bekisopa DSO fines product has very low phosphorous (0.03-0.06% P), low SiO2 and low
Al2O3.
The iron recoveries are excellent, even for the surficial lateritised material, and it appears that
some iron is reporting to the non-magnetic fractions due to being in the form of much lower
magnetic intensity minerals hematite and goethite, as suggested by the iron assays of the
non-magnetic fractions varying from 14.4% Fe to 55.9% Fe (average 33.9%). Further testing
will be performed to maximise recovery of these iron fractions into the iron ore product stream.
The high-grade magnetic products are shown as Figures 1 to 4.
Figure 1
Product from BEKMETF02, a composite of fresh rock (to slightly weathered along fractures) massive
mineralisation from BEKD09 and BEKD10. The LIMS product grade is 66.5% Fe at a 91% recovery and a mass
yield of 79%.
5|Page
Figure 2
Product from BEKMETF04, a composite of surficial (lateritised) massive material from BEKD09, BEKD10
and BEKD11. The LIMS product grade is 66.9% Fe at an 84% Fe recovery and a mass yield of 75%.
Figure 3
Product from BEKMETF05, a composite of weathered in-situ massive material from BEKD09 and BEKD11. The
LIMS product grade is 65.1% Fe at a 59% Fe recovery and a mass yield of 55%.
6|Page
Figure 4
Product from BEKMETF12, a composite of weathered and transitional coarse disseminated material from
BEKD09, BEKD10 and BEKD11. The LIMS product grade is 59.3% Fe (from a head grade of 39% Fe) at an
83% Fe recovery and a mass yield of 54%.
The individual samples are discussed in more detail in Appendix 2.
The dry LIMS results for the 10mm and plus 2mm processing trials are shown below. These
results confirm that a coarse crush to minus 2mm is required to liberate the iron minerals and
achieve a high-grade iron ore product.
The table below summarises LIMS results for the plus 2mm crush.
Magnetic
Fraction
Sample
BEKMET02
BEKMET04
BEKMET05
BEKMET12
Average
Magnetic Fraction Grade
Fe
%
57.8
65.8
60.3
47.0
57.7
SiO2
%
4.9
2.6
6.4
15.8
7.4
Al2O
3 %
1.1
2.0
1.1
2.6
1.7
P%
Iron
Recovery
%
Est
Head
Fe %
Calc
Head
Fe %
Mass
Recovery
%
0.15
0.07
0.10
0.12
0.11
97.4
76.1
70.0
94.5
84.5
58.2
61.0
60.9
40.8
55.2
58.2
60.0
61.0
38.7
54.5
94.8
75.1
70.0
82.9
80.7
Magnetic fraction, +2mm, 900 gauss magnetic drum separation, dry LIMS (Est Head = head grade estimated from combination
of individual samples, Calc Head = head grade back calculated from combined magnetics and non-magnetics assays)
Composite, +2mm, surficial, lateritised, massive magnetite mineralisation sample BEKMET02
generated an outstanding result delivering a 65.8% Fe product at 76% recovery and a mass
recovery of 75%.
Results of the minus 10mm LIMS test work are shown below.
This coarser crush of the half drill core section, taken from the ~63mm diameter drill core,
provides an indication of the potential upgrading to produce a lump iron product.
7|Page
Magnetic
Fraction
Sample
BEKMET02
BEKMET04
BEKMET05
BEKMET12
Average
Magnetic Fraction Grade
Fe
%
58.5
61.5
61.6
47.5
57.3
SiO2
%
4.6
5.5
5.0
15.3
7.6
Al2O3
%
1.2
3.4
1.0
2.8
2.1
Est
Head
Calc
Head
Mass
Recovery
P%
Iron
Recover
y
%
Fe %
Fe %
%
0.14
0.05
0.09
0.11
0.10
97.0
81.4
67.6
94.2
85.1
58.2
61.0
60.9
40.8
55.2
58.2
60.0
61.0
38.7
54.5
95.0
81.2
67.6
82.2
81.5
Magnetic fraction, +2mm, 900 gauss magnetic drum separation, dry LIMS (Est Head = head grade estimated from combination
of individual samples, Calc Head = head grade back calculated from combined magnetics and non-magnetics assays)
Conclusions
Assay results from the drilling in southern area of Bekisopa has shown significant near surface
high-grade iron mineralisation extending at depth.
This massive magnetite mineralisation readily upgrades to a 66% iron, a premium grade iron
ore product, after only crushing to minus 2mm and magnetic separation, these are outstanding
outcomes.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About Akora Resources
Akora Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa Project, Tratramarina and Ambodilafa, iron ore projects in
Madagascar, in all totalling some 308 km2 of tenements across these three prospective
exploration areas. Bekisopa Iron Ore Project is a high-grade magnetite iron ore project of
>4km strike and is the key focus of current exploration drilling and resource modelling.
8|Page
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related
scientific and technical information, is based on and fairly represents information compiled by Mr Antony
Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He is a shareholder
in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years prior to being
engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of Mining and
Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG). Mr Truelove
has sufficient experience which is relevant to the styles of mineralisation and types of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the JORC Code. Mr Truelove consents to the inclusion in this report of the matters based on his
information in the form and context in which it appears including sampling, analytical and test data
underlying the results.
9|Page
APPENDIX 1
Bekisopa Cross Sections and Plans with Results to date
10 | P a g e
Bekisopa Drilling Plan Showing Cross Section Locations
Cross Section BEKD09, 10 & 11
Cross Section BEKD12
11 | P a g e
APPENDIX 2
Details of Minus 2mm Mineral Processing Test work
BEKMETF02
This sample is a composite from logged massive to semi-massive mineralisation from the southern
area. It was collected from unweathered to slightly weathered (mainly along fracture planes) drill core
in drill holes BEK09 and BEK10.
Approximately 100g of individual samples were combined into a single combined sample with an
estimated head grade of 58.2% Fe using the average of individual samples used:
Sample
O7832
O7833
O7834
O7835
O7836
O7837
O7838
O7843
O7937
O7938
O7939
O7941
O7942
Average
Hole
BEKD09
BEKD09
BEKD09
BEKD09
BEKD09
BEKD09
BEKD09
BEKD09
BEKD10
BEKD10
BEKD10
BEKD10
BEKD10
From
40.08
41.90
42.85
43.75
44.65
45.60
46.46
50.06
32.80
33.60
34.50
35.34
36.00
To
41.90
42.85
43.75
44.65
45.60
46.46
47.30
50.95
33.60
34.50
35.34
36.00
36.70
Fe %
57.34
36.43
63.09
62.91
60.96
57.86
56.31
45.82
65.90
65.63
66.66
60.58
57.47
58.23
The back-calculated head grade of the sample is 58.2% Fe as shown in the table below:
Fe
SiO2
Al2O3
P
LIMS
FRACTION
Wt.
Fe
Fe
SiO2
SiO2
Al2O3
Al2O3
P
P
@ 900G
WEIGHT
DISTn.
Grade
DISTn.
Grade
DISTn.
Grade
DISTn.
Grade
DISTn.
(g)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
Mags
635.6
79.4
66.5
90.6
1.68
22.2
0.60
36.7
0.054
30.1
N-Mags
165.4
20.6
26.4
9.4
22.60
77.8
3.98
63.3
0.482
69.9
Calc'd HEAD
801.0
100.0
58.2
100.0
6.00
100.0
1.30
100.0
0.142
100.0
The above result produced an outstanding iron product, grading 66.5% Fe at 90.6% Fe
recovery and at a 79.4% mass yield from a simple 2mm crush followed by magnetic
separation.
Silica and alumina were low as was phosphorous, with most of the P reporting to the nonmagnetic fraction.
12 | P a g e
BEKMETF04
This sample is a composite from logged massive to semi-massive mineralisation from the
southern area. It was collected from the surficial (lateritised) zone comprising weathered drill
core from drillholes BEKD09, BEKD10 and BEKD11.
Approximately 100g of individual samples were combined into a single combined sample with
an estimated head grade of 61.0% Fe using the average of individual samples used:
Sample
O7785
O7786
O7787
O7902
O7903
O7904
S2813
S2814
Average
Hole
BEKD09
BEKD09
BEKD09
BEKD10
BEKD10
BEKD10
BEKD11
BEKD11
From
0.00
1.00
2.03
0.00
1.00
2.05
0.00
0.70
To
1.00
2.03
3.30
1.00
2.05
3.20
0.70
2.40
Fe %
57.67
59.65
58.69
58.98
60.86
63.66
64.47
63.93
60.99
The back-calculated head grade of the sample is 60.0% Fe as shown in the table below:
Fe
SiO2
Al2O3
P
LIMS
FRACTION
Wt.
Fe
Fe
SiO2
SiO2
Al2O3
Al2O3
P
P
@ 900G
WEIGHT
DISTn.
Grade
DISTn.
Grade
DISTn.
Grade
DISTn.
Grade
DISTn.
(g)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
Mags
460.2
75.3
66.9
83.9
2.03
20.2
2.15
38.6
0.023
36.8
N-Mags
151.3
24.7
39.0
16.1
24.40
79.8
10.40
61.4
0.120
63.2
Calc'd HEAD
611.5
100.0
60.0
100.0
7.56
100.0
4.19
100.0
0.047
100.0
The metallurgical test work again generated an outstanding iron product grading 66.9% Fe at
83.9% Fe recovery and at a 75.3% mass yield from a simple 2mm crush followed by magnetic
separation.
The phosphorous was low with most of the P reporting to the non-magnetic fraction. Silica
and alumina were both low and sulphur is also low at 0.01%, probably due to weathering of
any sulphides present.
BEKMETF05
This sample is a composite from logged massive and coarse disseminated mineralisation from
the southern area. It was collected from weathered but in-situ mineralisation in drill core from
drillholes BEKD09 and BEKD11.
Approximately 100g of individual samples were combined into a single combined sample with
an estimated head grade of 60.9% Fe using the average of individual samples used:
13 | P a g e
Sample
O7807
O7808
S2827
S2829
S2830
S2831
S2832
S2833
S2834
S2835
S2836
S2837
S2838
S2839
S2841
Average
Hole
BEKD09
BEKD09
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
BEKD11
From
18.30
19.80
11.63
14.13
15.00
16.00
17.00
18.00
18.80
19.60
20.44
21.25
22.20
23.20
24.20
To
19.80
20.46
12.63
15.00
16.00
17.00
18.00
18.80
19.60
20.44
21.25
22.20
23.20
24.20
25.23
Fe %
45.37
45.02
65.13
64.01
61.28
63.56
65.22
63.07
61.99
63.04
61.75
61.40
63.89
64.17
64.66
60.90
The back-calculated head grade of the sample is 61.0% Fe as shown in the table below:
Fe
SiO2
Al2O3
P
LIMS
FRACTION
Wt.
Fe
Fe
SiO2
SiO2
Al2O3
Al2O3
P
P
@ 900G
WEIGHT
DISTn.
Grade
DISTn.
Grade
DISTn.
Grade
DISTn.
Grade
DISTn.
(g)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
Mags
462.1
55.1
65.1
58.9
2.59
32.4
0.58
35.4
0.050
29.2
N-Mags
376.2
44.9
55.9
41.1
6.64
67.6
1.30
64.6
0.149
70.8
Calc'd HEAD
838.3
100.0
61.0
100.0
4.41
100.0
0.90
100.0
0.094
100.0
Again, the metallurgical test work generated an outstanding iron product, grading 65.1% Fe at
58.9% Fe recovery and mass yield at a 55.1% from a simple 2mm crush followed by magnetic
separation. The phosphorous was low with most of the P reporting to the non-magnetic
fraction. Sulphur was low in this sample at 0.15%, probably due to weathering of any sulphides
present.
The non-magnetic product from this LIMS trial is high in iron, suggesting a component of the
less magnetic hematite and/or goethite may be present. Mineralogy and further test work will
be performed to determine how to effectively capture these iron minerals into the saleable
product.
BEKMETF12
This sample is a composite from logged coarse disseminated mineralisation from the southern
area. It was collected from oxidised and transitional drill core, grading to slightly weathered in
places.
Approximately 100g of individual samples were combined into a single combined sample with
an estimated head grade of 40.8% Fe using the average of individual samples used:
14 | P a g e
Sample
Hole
From
To
Fe %
O7821
BEKD09 31.46
32.70
11.50
O7822
BEKD09 32.70
33.70
17.95
O7823
BEKD09 33.70
34.46
37.92
O7824
BEKD09 34.46
35.34
17.57
O7825
BEKD09 35.34
36.10
40.80
O7826
BEKD09 36.10
36.85
24.63
O7827
BEKD09 36.85
37.68
27.40
O7828
BEKD09 37.68
38.25
48.18
O7829
BEKD09 38.25
39.00
27.81
O7830
BEKD09 39.00
39.90
31.71
O7831
BEKD09 39.90
40.80
36.52
O7919
BEKD10 15.80
17.00
50.97
O7921
BEKD10 17.00
18.00
56.54
O7922
BEKD10 18.00
19.00
45.38
O7923
BEKD10 19.00
20.00
50.82
O7924
BEKD10 20.00
21.00
52.90
O7925
BEKD10 21.00
22.00
58.27
O7926
BEKD10 22.00
23.00
58.12
O7927
BEKD10 23.00
24.00
58.87
O7928
BEKD10 24.00
25.00
54.20
O7929
BEKD10 25.00
26.25
42.57
O7930
BEKD10 26.25
27.10
61.90
O7931
BEKD10 27.10
27.90
51.79
O7932
BEKD10 27.90
28.90
41.41
O7933
BEKD10 28.90
29.88
43.78
O7934
BEKD10 29.88
31.43
36.36
O7935
BEKD10 31.43
32.10
35.26
O7936
BEKD10 32.10
32.80
35.46
S2842
BEKD11 25.23
26.44
51.04
S2843
BEKD11 26.44
27.44
23.68
S2844
BEKD11 27.44
28.30
32.59
Average
40.77
The back-calculated head grade of the sample is 38.7% Fe as shown in the table below:
Fe
SiO2
Al2O3
P
LIMS
FRACTION
Wt.
Fe
Fe
SiO2
SiO2
Al2O3
Al2O3
P
P
@ 900G
WEIGHT
DISTn.
Grade
DISTn.
Grade
DISTn.
Grade
DISTn.
Grade
DISTn.
(g)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
(%)
Mags
851.1
54.1
59.3
82.9
7.05
17.9
1.65
23.7
0.054
24.1
N-Mags
722.5
45.9
14.4
17.1
38.10
82.1
6.25
76.3
0.200
75.9
Calc'd HEAD
1573.6
100.0
38.7
100.0
21.31
100.0
3.76
100.0
0.121
100.0
This metallurgical sample resulted in very good iron product grading 59.3% Fe at 82.9%
Fe recovery with mass yield at a 54.1% from a simple 2mm crush followed by magnetic
separation from a 38.7%Fe feed grade.
The phosphorous was low with most of the P reporting to the non-magnetic fraction. Sulphur
was very low in this sample at 0.02% S, probably due to weathering of any sulphides present.
15 | P a g e
APPENDIX 3
Drill Hole Details and Intercepts Table
Hole Number Northing (m) Easting (m) Elevation (m) Azimuth (Deg) Inclination (Deg) Tot. Depth (m) From
BEKD09
586749.33 7608150.00
862.81
90
-60
100.46 0.0
incl.
0.0
and
11.3
incl.
42.8
To Interval Fe % SiO2 % Al2O3 % CaO % K2O % Na2O % MgO %
49.3
49.3
39.3
21.7
3.3
3.1
0.3
0.1
11.8
11.3
11.3
51.3
14.8
4.7
0.6
0.1
0.0
4.2
49.3
38.0
35.7
23.7
2.9
3.8
0.4
0.1
14.0
47.3
4.5
60.3
4.3
1.0
0.8
0.6
0.0
3.5
P%
0.10
0.03
0.12
0.20
S%
Style
0.54 M,CD
0.01 M,CD
0.69 M,CD
3.55 M
Location Oxidation
South
C
South
O
South
T,F
South
F
BEKD10
586798.55 7608149.51
865.33
90
-60
100.43
0.0
0.0
0.0
6.7
13.1
32.8
37.2
6.7
3.2
37.2
36.7
36.7
37.2
6.7
3.2
30.5
23.6
3.9
47.5
53.7
61.3
46.2
51.1
63.6
17.0
13.6
7.2
17.8
13.4
3.2
3.2
3.3
3.7
3.2
2.9
1.0
1.7
1.2
0.1
1.7
1.5
0.1
0.2
0.1
0.1
0.2
0.2
0.3
0.1
0.0
0.0
0.1
0.1
0.0
6.8
3.7
1.0
7.5
5.5
1.7
0.08
0.04
0.10
0.09
0.10
0.08
0.23 M,CD
0.01 M,CD
0.01 M
0.28 M,CD
0.33 M,CD
1.89 M
South
South
South
South
South
South
C
O
L
T
T
T
586848.77 7608150.06
868.22
90
-60
100.44
0.0
0.0
0.0
0.0
11.6
28.3
25.2
11.6
4.4
25.2
28.3
25.2
11.6
4.4
13.6
58.7
61.4
58.9
62.4
63.5
6.7
4.9
7.7
4.1
2.6
2.1
1.9
3.0
2.6
0.9
0.6
0.2
0.4
0.1
0.0
0.1
0.1
0.0
0.0
0.1
0.0
0.0
0.0
0.0
0.0
2.0
1.2
1.8
0.8
0.7
0.09
0.08
0.08
0.08
0.09
0.28 M,CD
0.29 M,CD
0.05 M,CD
0.06 M
0.49 M
South
South
South
South
South
C
C
O
L
T
586898.98 7607599.67
868.86
90
-60
100.42
0.0
1.5
1.5
56.0
8.5
4.9 0.0887
0.1
0.0
0.5
0.12
0.08 M,CD
South
L
incl.
incl.
also incl.
incl.
incl.
BEKD11
incl.
incl.
incl.
also incl.
BEKD12
Notes:
Co-ordinates: UTM WGS84 Zone 38 South, Surveyed by DGPS
Style: M = Massive to Semi Massive, CD = Coarse Disseminated, D = Disseminated
Oxidation: O = Oxidised, F = Fresh, L = Laterite, T = Transition, C = Composite
Sulphur: Red = Some assays within interval greater than upper assay limit of 5% S
16 | P a g e
AUSTRALASIAN CODE FOR THE REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND ORE RESERVES
BEKISOPA PROJECT
Section 1 Sampling Technique and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling
techniques
17 | P a g e
JORC Code explanation
• Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed
information.
Commentary
Historical Pit and Trench Sampling Shown on Sections:
• All trenches and pits were located by GPS but are historic in nature (work undertaken by
BRGM between 1958 and 1962 and by UNDP between 1976 and 1978). Most of these
trenches and pits are still open although partially in-filled with scree and vegetation. In
total, BRGM completed 564 pits for 1,862 linear metres excavated, 3,017m3 of trenching
and 572m diamond drilling in 22 holes. UNDP completed an additional 238 pits for 897
linear metres and 101m diamond drilling in 2 holes. They collected a total of 854 samples,
710 from pits and 144 from drill-holes.
• In the BRGM work, trench samples were collected as 1m horizontal channels from as close
to the base of the channel as possible. If lithology changed within the 1m sample, two or
more samples were collected based on each lithology encountered. Pit samples were
collected as 1m vertical channels. Each channel was 20cm wide by 10cm deep.
• Samples collected by BRGM were crushed and ground to minus 0.15mm in country and
then a 200g split was sent to either BRGM in Paris or Dakar or to Department of Mines for
Madagascar in Antananarivo for analyses for Fe, SiO2, Al2O3 and P. Detailed of assay
techniques are not available but Assay work by BRGM is generally to a high standard. The
analyses for P were considered to be suspect as the levels detected by BRGM in both Paris
and Dakar averaged about 0.05% but the levels detected by the Department of Mines in
Madagascar averaged about 0.19%. Recent work has confirmed P is low for high grade
iron mineralisation and the BRGM results are now considered to be more accurate than
the Departmental work.
• Samples collected by UNDP were obtained and prepared in a similar manner except
channels were 10cm wide and 10cm deep. The samples were crushed to minus 1mm
Share your feedback
Discover