Highlights
•
AKORA reports an increase from 5.54 to 7.88 million tonnes of Indicated and Inferred DSO
Resource at a grade of 58.8% Fe at its Bekisopa Iron Ore Project.
•
This increases the Bekisopa Scoping Study1 mine life to six years with JORC compliant
resources expected to provide a significant uplift to the Scoping Study financials.
•
The Central and Northern zones at Bekisopa will provide future operating flexibility for
DSO grade control.
•
The Bekisopa DSO zones remain open for further infill drilling in multiple areas.
AKORA Resources (ASX: AKO) (“AKORA” or “Company”) has increased the JORC compliant
indicated and inferred Direct Shipping Ore (DSO) resource at its flagship Bekisopa Iron Ore Project in
Madagascar by 42% to 7.88 million tonnes (Mt) at an average grade of 58.8% Fe.
The resource extension follows a DSO targeted shallow infill drilling program completed at Bekisopa
in October 2023 and includes maiden resources from the project’s Northern and Central zones as
well as a small uplift in DSO inferred tonnage in the Southern zone.
Bekisopa’s DSO Resource formed the basis for the updated Scoping Study released in November
20231 which found that production could potentially ramp up to 2 million tonnes per annum (Mtpa)
over an initial five-year mine life at Bekisopa. The start-up operation would produce a high-grade
61% Fe average grade lump and fines product for use by Blast Furnace-Basic Oxygen Furnace
(BFBOF) steelmakers and return strong cash flows and operating cost margin.
AKORA Managing Director and CEO, Mr Paul Bibby said “the increase in shallow DSO tonnage at
the Bekisopa Project is expected to increase the Stage One mine life of our planned at-surface DSO
mine to six years and dramatically improve project economics. Additionally, the strike length of
mineralisation at Bekisopa has increased to 7km from 6km as we open up Bekisopa’s northern zone.
Notably, this upgraded DSO resource, which will be included in Bekisopa’s Pre-Feasibility Study
(PFS) currently in progress, is only drawn from around half of this 7km strike length.”
“Moreover, the PFS does not include any upside potential DSO tonnes from the Company’s nearby
Satrokala Project where a 10km magnetic anomaly has been identified, nor does the PFS consider
the potential for a larger longer mine life Stage Two where a high-grade +67% Fe concentrate could
be produced for the green steel market. Further exploration success at either Bekisopa and/or
Satrokala, both 100% Akora owned, would significantly add to our initial DSO Start-Up Plan and
result in significantly improved Study outcomes.”
Iron ore for tomorrow’s steel making.
1
Refer ASX Announcement 14 November 2023
Figure 1. AKORA has drilled 250 holes across four campaigns totalling over 8,400m at Bekisopa
and delivered a new Indicated and Inferred DSO Resource of 7.88 million tonnes.
Bekisopa Iron Ore Project - Background
AKORA completed 74 drill holes at the Bekisopa Project in late 20232 targeting the shallow highgrade DSO iron ore mineralisation. Drilling was conducted in the prominent southern zone
(location of the 2023 JORC resource) and also targeted the central and northern areas of the
deposit, adjacent to earlier resource definition drilling. The drill holes were shallow, targeting the
highly weathered DSO zone and typically less than 30m in depth and typically using a 50m-by50m spacing pattern to support a high level of geological confidence. DSO intercepts averaged
56.7% Fe in the northern zone, 52.6% Fe in the central zone and 59.8% Fe in the southern zone.
The drill hole information was provided to AKORA’s engineer Wardell Armstrong International
(WAI) to complete the Mineral Resource Estimate (MRE). A 3D block model was developed with
wireframe analysis then being used to further define the mineral resources areas. Mineralised
areas were based on a nominal cut-off grade of 58% Fe for DSO in the southern and northern
zones, and 50% DSO for the central zone. Cut off grade analysis was reviewed using histogram
and log probability plots and contiguous length analysis to determine a ’natural’ cut off grade to
define the mineralised zone.
Iron mineralisation in the northern zone is interpreted over a strike length of 700m, with widths of
between 30 and 100m. DSO thickness varies from 0.5m to 7.5m in thickness. Exploration
remains open to the north and south. Figure 2 shows the location of the 15 northern zone 2023
drill holes which were either just one, two or three drill holes across the area of interest. A
consequence of the limited number of drill holes per line is it reduces the confidence in the
continuity of the iron mineralisation and therefore the likelihood of the MRE being categorised in
the Indicated category.
2
Refer ASX Announcement 11 October 2023.
2
Figure 2. The Bekisopa drill hole plan defines the general layout of the 7km strike length and
identifies the southern, central and northern zones that are reported in the DSO MRE table.
Iron mineralisation in the central zone is interpreted over a strike of 780m with widths between 70
and 170m. DSO thickness varies from 0.5m to 5m in thickness. Mineralisation remains open to
3
the south. Figure 2 shows the location of the 50 central zone 2023 drill holes typically with three
or four drill holes per line.
Similarly, Figure 2 shows the location of the nine southern zone 2023 eastern flank drilling. With
just one or two holes drilled per line and spaced out at ~100m along strike as a result with such
few drill holes at such a wide, >50m spacing, resulted in this area of the resource being defined in
the Inferred category.
The outcome of the updated MRE is detailed in Table 1. The planned 2024 campaign of infill DSO
drilling across the northern and central zones has been designed to build on the informative 2023
drilling results and deliver DSO tonnes into the Indicated MRE resource category.
AKORA has previously released details on the upgradability of the DSO material, examples
released in June3 and July4 2021, which offers an exciting opportunity to further investigate the
ability to simply upgrade some areas of the DSO mineralisation using the likes of a simple drum
magnet after pit crushing and screening. This work has shown that head grades of 50+% Fe
were readily upgraded to +62%Fe (Benchmark iron grade) with crushing the mined ore to a fines
product and incorporating a magnetic separation stage post screening.
3 Refer ASX Announcement 12 July 2021
4
Refer ASX Announcement 25 June 2021
4
Notes
1.
2.
3.
4.
5.
6.
Mineral Resources are limited by an optimised open pit shell based on appropriate technical and economic parameters.
Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a Pre-Feasibility Study or
Feasibility Study.
Mineral Resources are reported inclusive of any Ore Reserves.
Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by Richard Ellis, an
independent Competent Person as defined by JORC.
The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title, taxation, sociopolitical, marketing or any other relevant issues.
All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due to rounding.
Table 1. Bekisopa MRE Direct Shipping Ore Zone
No changes occurred to the 2023 MRE3 for the underlying Green Steel iron ore zone as all 2023
drilling targeted the shallow highly weathered DSO mineralisation. The Green Steel MRE data is
detailed in Table 2.
5
Notes:
1. Mineral Resources are reported using a cut-off grade of 36% Fe.
2. Mineral Resources comprise moderately weathered and unweathered material.
3. Mineral Resources are limited by an optimised open pit shell based on appropriate economic and mining parameters.
4. Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a Pre-Feasibility Study or
Feasibility Study.
5. Mineral Resources are reported inclusive of any Ore Reserves.
6. Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by Richard Ellis, an
independent Competent Person as defined by JORC.
7. The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title, taxation, sociopolitical, marketing or any other relevant issues.
8. All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due to rounding.
Table 2. Bekisopa MRE Green Steel Iron Ore Zone
Indicated Mineral Resource Classification.
The Mineral Resource classification was undertaken by WAI in accordance with the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves [JORC Code
(2012)]. WAI considers that parts of the Bekisopa deposit have been sufficiently explored to
assign an Indicated Resource and an Inferred Mineral Resource as defined by the JORC Code
(2012). The relatively close spaced drilling in areas of the Bekisopa deposit are enough, along
with other interpretations, for iron mineralisation continuity to be assumed.
WAI believes that an absence of an overall geological and structural model impedes the
classification of any higher confidence Measured Mineral Resources. WAI recommends that a
geological and structural model for the deposit should be developed. Such a model should assist
in defining a higher category MRE across all areas drilled for DSO.
There are no known mining, metallurgical, infrastructure, or other factors that materially affect this
MRE at this time.
Iron Mineralisation Density
The WAI DSO MRE table shown in Table 1 details the density used for each zone. Density plays
a key role in determining the resource tonnage.
Density measurements conducted in the field were performed using the Vernier Calliper Method
(VCM) on weathered zone samples and by the Archimedes Principle method (APM) on
competent fresh iron mineralisation samples. A total of 6,613 density measurements have been
taken from samples from Bekisopa. Detailed regression formula have been formed by WAI using
iron grades and density data. Regression density values are then assigned to the geological
block models from the drill hole composites. Validation of the density regression model was
conducted by WAI through laboratory density measurements on a range of DSO grade iron
samples and confirmed the validity of the infield density measurements.
6
Next Steps
AKORA plans to perform further shallow drilling at Bekisopa in the next months to further
increase the MRE and importantly to deliver increased DSO tonnes and improve the resource
classification from inferred to indicated.
AKORA will complete an update of the 2023 Scoping Study financial model with this new MRE to
further improve the financial parameters; additional mine life, NPV and cash flow from this
additional tonnage available for production planning.
Develop a geological and structural model for the Bekisopa deposits. Such a model should assist
in defining a higher category MRE across all areas drilled for DSO.
AKORA will also evaluate and quantify the benefit of incorporating a conventional magnetic drum
separation step post DSO crushing and screening to readily upgrade the mined DSO grade. WAI
experience indicates that grade improvements of several percent iron can be achieved at high
tonnage recovery.
Conclusion
WAI was commissioned by AKORA to produce an updated MRE for the Bekisopa deposit. The
Bekisopa Project comprises three zones – the Northern, Central and Southern zones. It is the
goal of AKORA to develop an open pit operation with an initial Stage One focus on rapidly
bringing into production near-surface, weathered iron material as DSO lump and fines.
The WAI updated MRE is 7.88 Million tonnes of DSO Indicated and Inferred resource
grading 58.8% Fe, this is 42% more DSO tonnes than estimated in 2023.
Within this Indicated and Inferred resource is 5.24 Million tonnes of DSO grading 59.7% Fe in
the Indicated category. This DSO is believed suitable for a selective mining DSO start-up that
should have relatively low mining and processing capital and operation costs.
This updated MRE details the addition of the Northern and Central Bekisopa zones into JORC
compliant MRE status for the first time, adding 1.6Mt of Indicated and Inferred resources.
The expectation is that further drilling in all three Bekisopa zones could add additional DSO
tonnes. AKORA also notes that the reported MRE does not include the observed high-grade
outcropping iron mineralisation believed suitable for additional DSO lump and fines products.
This announcement has been authorised by Akora Resources Limited’s Board of Directors.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Gareth Quinn
Investor Relations
Phone +61(0) 417 711 108
gareth@republicpr.com.au
7
Competent Persons Statements
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time employee
of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist (Pr.Sci.Nat. - 400155/13)
with the South African Council for Natural Scientific Professions (SACNASP). Mr. Leeuwner has sufficient
experience which is relevant to the style of mineralisation and type of deposits under consideration and the
activity being undertaken to qualify as a Competent Person as defined in the Note for Mining Oil & Gas
Companies, June 2009, of the London Stock Exchange and the 2012 Edition of the ‘Australian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Leeuwner
consents to the inclusion of the information in this release in the form and context in which it appears.
The information in this document that relates to the Mineral Resource estimate of the Bekisopa project is
based on, and fairly represents information and supporting documentation compiled and reviewed by Mr.
Richard Ellis, a full-time employee of Wardell Armstrong International and independent of Akora Resources.
Mr. Ellis is a Chartered Geologist (CGeol) and Fellow of the Geological Society of London, and European
Geologist (EurGeol) of the European Federation of Geologists, and has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the December 2012 edition of the "Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" ('JORC Code'). Mr. Ellis
consents to the inclusion in the report of the matters based upon the information in the form and context in
which it appears.
8
Iron ore for tomorrow’s steel making
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development
of four high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (mt) Inferred JORC
Resource with very low impurities able to produce a premium-priced +68% Fe concentrate. Direct
Reduced Iron-Electric Arc Furnace (DRI-EAF) technology which is used to make greener steel
without coal and considerably less carbon emissions requires iron ore grades of at least 67%.
To generate cash in the near-term, AKORA is advancing plans at Bekisopa to produce up to 2Mt
per annum over the first five years of a 60% Fe average grade direct shipping ore (DSO) for
shipping to Blast Furnace-Basic Oxygen Furnace (BF-BOF) steelmakers.
9
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
• Samples consisted of diamond drill core.
• Diamond core (HQ or NTW) is split in half using a core saw or splitter (if clayey or rubbly). A
consistent half of the core is broken with a hammer and bagged prior to dispatch prior to dispatch to
the preparation laboratory in Antananarivo. Sample intervals are nominally 1m down hole however
samples would terminate at lithological and mineralisation boundaries. Average drill core sample
length is 0.87m.
• Samples generally weighed 3-5kg and were dried, crushed and pulverised to 85% passing 75
microns at a commercial laboratory.
• Field duplicates were taken during the 2023 drilling programme to assess sample representivity
during sampling.
• Handheld pXRF (Bruker Titan S1) was used on site prior to being sent to the preparation lab. XRF
was used on entire drill lengths from drillholes BEKD001 to BEKD024, after which XRF
measurements were conducted on visually identified mineralisation the core. The handheld XRF
was calibrated upon issue.
• Head and concentrate assay analysis was completed by conventional XRF (ME-XRF21u) with
recovered magnetic fraction completed using a Davis Tube.
Drilling
techniques
Iron ore for tomorrow’s steel making.
1
Refer ASX Announcement 14 November 2023
• All drilling is diamond core. Drilling contractor Croft Drilling Services (CDS) completed the diamond
drilling programmes in 2020-2023 with a man portable EP200 drilling rig for drillholes less than
100m in length, and a MP500 drilling rig for drillholes greater than 100m in length, using either NTW
Criteria
JORC Code explanation
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Drill sample
recovery
Logging
• Method of recording and assessing
core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
Commentary
•
•
•
•
•
•
•
•
•
•
•
•
•
(56.1mm inner diameter) or HQ (63.5mm inner diameter) coring equipment. The holes are generally
collared using HQ and changed to NTW between 3m and 25m downhole.
The drill core is not orientated.
All but three drillholes (BEKD001-BEKD003) from 2020-2021 drill campaigns have been surveyed
using a Reflex EZ-Gyro gyroscopic multishot camera at intervals of 10m, whilst BEKD013 to
BEKD063 surveys were completed with AXIS (Champ Navigator Gyro) every 10m. All drillholes
from this period are within 5° of their planned inclination and within 10° of the planned azimuths,
except for BEKD061 which was within 15° of the planned azimuths.
Total Core Recovery (TCR) was measured on site at the drill rig by the supervising geologist.
The database for core recovery contains 6,982 TCR measurements from Bekisopa North, Central,
and South. A total of 1,868 of these measurements have TCR >100% due to being recorded prior
to core gains being reconciled. Without considering these samples the mean TCR for all samples is
94%.
Core recovery is higher in fresh and slightly weathered core (mean TCR of 98%) than in highly
weathered core (mean TCR of 93%) and completely weathered core (mean TCR of 91%).
The drilling progress is monitored regularly by the supervising geologist to ensure maximum
recovery and a representative sample is being obtained. Drillholes with consistently low recovery
(<85%) were re-drilled (For example BEKD119 was redrilled due to poor recovery).
Core recovery was reviewed by mineralised domain. Mean TCR values for samples in waste and
green steel mineralisation are 95% with a slightly lower TCR of 91% in the DSO mineralisation. This
is to be expected as DSO mineralisation is near surface and within weathered rock.
No relationship is observed between sample recovery and grade.
A set of standard operating procedures for drilling and sampling were prepared by Akora and Vato
Consulting, who supervised the programme, and these were always adhered to.
Checks and verifications of the accurate measurement of penetration depth were made during
drilling and observations and recording of the colour of the water/mud rising from the drillhole were
made.
The entire length of drill core was logged. Pre-defined codes were used to create consistency in
qualitative logging.
Logging included: Total Core Recovery (TCR) and Rock Quality Designation (RQD), primary and
secondary lithology, weathering, colour (supported by Munsell chart), grain size, mineralisation type
(magnetite or hematite), mineralisation style and percentage, structure, magnetic susceptibility,
pXRF readings, in addition to general descriptions.
All drillholes were logged using a magnetic susceptibility meter to enable accurate distinction
between magnetite and hematite rich mineralisation.
11
Criteria
Subsampling
techniques
and sample
preparation
JORC Code explanation
• If core, whether cut or sawn and
whether quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate
to the grain size of the material being
sampled.
Commentary
• The entire length of drill core was geotechnically logged for TCR and RQD.
• All core was photographed both as whole core and half core (after cutting and sampling), in addition
to both wet and dry states.
• A set of standard operating procedures for drilling and sampling were prepared by Akora and Vato
Consulting, who supervised the drilling programme.
• All core was fitted together so that a consistent half core could be collected, marked up with a
consistent “top” line (line perpendicular to dip and strike, or main foliation) to minimise any bias in
the samples. Sample intervals were nominally 1m lengths but truncated by lithological,
mineralisation, or structural boundaries.
• Competent core was split using a core saw whereas incompetent/weathered core was split using
hammer and chisel. Sampling equipment was cleaned between samples to minimise the risk of
cross contamination.
• Half core samples were collected into polythene bags along with a paper sample tag. This was then
sealed using a cable tie and placed into a second polythene bag with a second paper sample tag
and sealed using staples. The remaining half core was kept as a reference sample.
• Akora collected 13 field duplicate samples during 2023 drilling through ¼ core of the ½ core sent for
assay. For friable core ¼ core was obtained through riffle splitter. Laboratory duplicates (2-4 per
100 samples) were collected in all drilling programmes at the preparation laboratory from reject pulp
material. The performance of the duplicates was assessed through correlation plots, based on Half
Absolute Relative Difference (HARD) and through statistics.
• Results of duplicate analysis are good indicating that the initial and final sub-sampling methodology
is likely providing representative sample for overall analysis.
• All preparation of exploration samples has been undertaken at The Office of National Mining and
Strategic Industries (OMNIS) preparation lab in Antananarivo, Madagascar. OMNIS are in the
process of accrediting the preparation laboratory to ISO/IEC 17025:2017.
• The samples were transferred at regular intervals to the sample preparation facility in Antananarivo
(OMNIS) where the following procedures took place:
o Sorting and weighing of samples.
o Dried at 110°C-120°C until totally dry.
o Weighing after drying.
o Jaw crushing to 2mm.
o Samples are passed through a riffle splitter twice (1:1) to produce a ¼ sample.
o For selected samples, 100g sub-sample was collected for Davis Tube Recovery.
o Sub-samples are riffle split to collect 100g with 80% passing 2mm and pulverized to
85% passing 75 microns.
12
Criteria
JORC Code explanation
Commentary
•
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
•
•
•
•
•
•
•
•
o The ring mill is cleaned using air and silica chips between samples.
o Reject pulp samples are stored or used as duplicate samples.
o A measurement of pXRF is taken on selected pulp samples.
Weight of each sub-sample (-2mm and 2 x -75 microns) are recorded and stored in separate boxes
for recovery.
All sampling methods and sample sizes are deemed appropriate for the deposit type.
Samples from the 2020 drilling campaign were either sent to ALS Iron Ore Technical Centre in
Perth, or ALS geochemistry laboratory in Galway Ireland. All samples from 2021, 2022 and 2023
were sent to ALS in Perth. Both laboratories are accredited to ISO/IEC 17025:2017. The analytical
techniques used by the laboratories were total.
Handheld XRF used by Akora is the Bruker Titan S1 handheld pXRF. The machine was calibrated
by GeoExploration in January 2021 and included QA/QC samples of blanks and two standards.
Analysis at ALS was completed on 100g of pulverised sample with 85% passing 75 microns by MEXRF21u (un-normalised) for total Fe% and multi element analysis including Al2O3, SiO2, P, S, K2O,
MgO, Mn, Ni, Pb, Sn, Sr, TiO2, V, Zn and Zr.
Loss on Ignition (OA-GRA05x) was included at 371°C, 650°C, and 1,000°C.
Selected mineralised samples were subjected to Davis Tube Recovery (DTT). This included a total
of 2,178 samples at Bekisopa South. The DTT concentrate was used to determine concentrate
grades of relevant elements including Fe, SiO2, P, S, Al2O3, TiO2, and LOI. DTT mass recovery was
also reported as a percentage of the measured feed. Samples obtained during the 2022 and 2023
drill programme did not include DTT test work.
QC samples consisted of blank samples, field duplicates, pulp duplicates and certified reference
materials (CRM) submitted both by Akora and internally by ALS. CRM and blank samples were
included every 40th sample with two to four pulp duplicates included every 100 samples.
A review of the quality control procedures for Akora’s drilling programmes had the following
findings:
QC Sample types and insertion rates:
o The insertion rates for blanks (3%), CRM (3%), and field and pulp duplicates (2%)
gives a total QC insertion rate of 8% which WAI considers acceptable.
o WAI recommends the frequency of QC samples insertion into the sample stream is
increased in future drilling programs to approximately 10-15% (ideally 5% blanks, 5%
CRM and 5% duplicates).
Blanks:
o Blank samples submitted by Akora included silica chips manufactured by African
Mineral Standards (AMIS0052, AMIS0439, AMIS0681, and AMIS0793) which have
13
Criteria
JORC Code explanation
Commentary
trace amounts of Fe, all below 1%. All blank samples, including the ALS internal
blanks, performed well with all samples returning <1% Fe showing no evidence of
significant contamination or sample switching.
o WAI does not consider the blank sample results to be an area of concern.
CRMs:
Verification
of sampling
• The verification of significant
intersections by either independent or
alternative company personnel.
o Four types of CRM were consistently used over the various exploration campaigns
which included OREAS 40, OREAS 401, OREAS 404 and OREAS 701. CRM OREAS
464 was used in the 2022 drilling campaign only due to a period of short supply of the
other CRM types.
o The accuracy of analysis was measured against ±2 and ±3 standard deviations. Any
samples reporting assays outside ±3 standard