Bekisopa PFS Update-Testwork suggest increased saleable ore
Released
Released
Announcement PDF
Akora Resources Limited
PO Box 28
Ballarat Victoria 3350
Australia
info@akoravy.com
ACN 139 847 555
ASX: AKO
www.akoravy.com
5 February 2025
ASX RELEASE
Bekisopa Iron Ore Project – Pre-Feasibility Study Update
Test work confirms Bekisopa intermediate grade material
can be upgraded to a saleable product.
Highlights:
•
The Bekisopa iron ore deposit has intermediate grade Direct Shipping Ore (DSO)
mineralisation ranging from 40 to 58% Fe, which is additional to the identified high grade
DSO resource1.
•
Intermediate grade material averaging 52.8% Fe has been upgraded to 59.2% Fe Lump
product at 80.8% recovery, using basic dry magnetic upgrading.
•
Intermediate grade material averaging 50.3% Fe was upgraded to 60.8% Fe Fines product
at 88% recovery, using basic dry magnetic upgrading.
•
Additional tonnes can now be considered for the project Mineral Resource Estimate (MRE),
with an aim of increasing the project mine life and its economics.
AKORA Resources Ltd (ASX: AKO) (“AKORA” or “Company”) has improved confidence of
increasing the mine life and tonnages of its flagship Bekisopa Iron Ore Project in Madagascar after test
work confirmed the project’s intermediate grade material was suitable for upgrade.
Completed as part of the project’s PFS due for release before the end of March 2025, the test work
showed material at coarse crush product size averaging 52.8% Fe could be upgraded to a Lump
product grading 59.2% Fe at 80.8% recovery using basic dry LIMS magnetic processing. Furthermore,
material averaging 50.3% Fe was upgraded to a Fines product grading 60.8% Fe at 88% recovery.
This test work provides the opportunity for this intermediate material to be included in the updated
Bekisopa Mineral Resource Estimate (MRE) as part of the PFS. The results support earlier mineral
processing tests announced on 11 December 2024, which confirmed that Bekisopa’s Lump and Fines
split should be able to deliver two DSO products to blast furnace steel makers.
AKORA is advancing its plans to develop a Stage 1 Direct Shipping Ore (DSO) operation at Bekisopa
to produce up to 2 million tonnes per annum (Mtpa) of a high-grade +60% Fe average grade lump and
fines product from the near surface weathered zone mineralisation.
AKORA’s Managing Director, Paul Bibby said “the ongoing work streams for the PFS continue to
show encouraging results and build on the positive Scoping Study outcomes reported in November
2023. The more Lump iron ore product we can deliver the better, as it is blast furnace steel makers’
preferred feed material, plus higher grades attract a premium price which would considerably enhance
the projects financials. These encouraging Intermediate Grade upgrading results look to add saleable
Lump and Fines product tonnes and importantly additional mine life to the Bekisopa DSO operation.”
1
ASX Announcement, 3 June 2024 MRE Update
Introduction:
Five intermediate grade samples were prepared from compositing numerous drill core sections
from across the Bekisopa resource area. The samples are representative of all three current
resource areas, being northern, central and southern areas of the Bekisopa Project as listed in
Table 1. The detailed sample composite drill hole data and sections are covered in Appendix 2.
Number
Low Grade #1
Low Grade #2
Low Grade #3
Low Grade #4
Low Grade #5
Intermediate Grade Samples
Weight kg
% Fe
Region
53.85
52.5
Northern Zone
53.26
53.2
Central Zone
53.15
49.7
Central Zone
58.64
52.8
Southern Zone (east)
55.64
50.4
Southern Zone (east)
Table 1 - Intermediate grade sample details and assays, from along the 6 kilometre strike length
of mineralisation at Bekisopa.
Metallurgical Testing:
The intermediate samples were crushed and screened to determine the proportion of Lump (sizing
+6.3mm and -31.5mm) and Fines product (sizing -6.3mm). The intermediate samples generated a
high distribution of iron into the Lump product (58.5 to 82.0% of the total weight) which is beneficial,
as the Lump product offers a market premium, Figure 1(a). The respective iron feed grade of the
Lump and Fines is detailed in Figure 1(b), with grades ranging from circa 42 to 59% iron for the
lump fraction and from 49 to 52% for the fines fraction.
(a)
(b)
Figure 1 - Intermediate grade material lump and fines % Mass Split, prior to upgrading trials (Figure
1(a) and lump and fines head grade assays, prior to upgrading trials (Figure 1 (b).
The lump and fines intermediate grade material was then tested, dry, across a low intensity
magnetic drum separator to determine the upgradability of the material. This testing was done for
each Lump and Fines product from the crushing and screening stage in a single pass operation.
The Lump product with an average iron grade of 52.8% upgraded on average to 59.2% with a
recovery of 80.8%. The Fines product with an average iron grade of 50.3% upgraded on average
to 60.8% with a recovery of 88.0%. Results are detailed in Table 2.
The single pass upgradability of these coarse dry samples is very encouraging. The opportunity to
use a simple low intensity magnetic drum separator or a belt-type magnetic separator post crushing
and screening stages to upgrade lower grade material should offer great operating flexibility and
potentially open new resource areas for the Bekisopa DSO Project.
The distribution of iron mineralisation, mainly consisting of magnetite, with some hematite and
goethite, within the three main zones will influence the performance of any upgrade circuit and will
2
need further consideration through mineralogy and future mine planning, including the impact of
the combined silica and alumina impurities, particularly for the southern zone.
Lump
Fines
LG
% Fe
% Fe
Sample
Feed
Product
Fe
%
Recovery
% Fe
% Fe
Feed
Product
Fe
%
Recovery
1
58.80
60.27
99.50
49.02
62.30
94.70
2
59.57
62.51
96.50
51.20
62.01
91.60
3
53.04
61.10
85.30
48.52
60.63
89.70
4
50.28
54.78
71.60
52.85
59.56
87.80
5
42.13
57.14
51.10
50.13
59.28
76.40
Average
52.76
59.16
80.80
50.34
60.76
88.04
Table 2 - Intermediate Sample Upgradability Results confirms saleable Lump and Fines grade
readily achieved, at good mass recoveries
These preliminary upgradability results will now be used in consideration for the new MRE and for
the PFS, scheduled for completion in March 2025.
Mining:
Inclusion of the intermediate material into the MRE and mine plan is currently underway and will
be subject to future announcements regarding the MRE and the PFS study. The intermediate
material will need to be in the highly or extremely weathered zone of the ore body to be considered
complimentary to the existing DSO resource. This will include being rippable or diggable and not
requiring drill and blasting, therefore, a low mining cost iron mineralisation.
As an example, Figure 2 shows a cross section of the southern Bekisopa resource area. This
cross section identifies the current JORC compliant DSO (upper enriched zone) in purple. The
potential intermediate zone is identified in yellow, sitting directly beneath the DSO resource.
Figure 2 – Southern Bekisopa Mineral Outline, showing DSO zone (purple) and potential
intermediate grade zone (yellow).
3
Conclusions:
Metallurgical testing trials have demonstrated that the Bekisopa mineralisation has intermediate
grade material that can be upgraded to produce saleable products through basic dry magnetic
separation at coarse crush size post the screening stage. This intermediate material is classified
as having head grades between 40 to 58% iron and typically sits adjacent to and underlying the
existing Bekisopa DSO material.
With simple processing, and typically being adjacent to the existing DSO resource, this material
could offer incremental tonnage to increase the project life and economics. Further investigation
is required through the existing Pre-Feasibility Study and the pending MRE update from the
completed 2024 exploration program.
Next Steps:
•
Through the existing MRE update process, determine the amount of the intermediate
material for inclusion in the MRE.
•
If the intermediate material is added into the MRE, then the PFS study will consider the
mining, processing and resultant economic impact of this new material, including benefits
from additional mine life.
This announcement has been authorised by AKORA Resources Ltd’s Board of Directors.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Gareth Quinn
Investor Relations
Phone +61(0) 417 711 108
gareth@republicpr.com.au
Competent Persons Statements
The information in this statement that relates to metallurgical test work is based on information compiled by
Mr James Turner – BSc (Hons), MSc, ACSM, MCSM, CEng, MIMMM, and is a full-time employee of Wardell
Armstrong International. Mr. Turner is a registered Chartered Engineer and Member of the Institute of
Materials, Minerals and Mining (MIMMM). Mr Turner has sufficient experience which is relevant to the style
of mineralisation and metallurgical test work under consideration and the activity being undertaken to qualify
as a Competent Person as defined in the Note for Mining Oil & Gas Companies, June 2009, of the London
Stock Exchange and the 2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’ (JORC Code). Mr. Turner consents to the inclusion of the information in this
release in the form and context in which it appears.
4
Iron ore for tomorrow’s steel-making
AKORA Resources Ltd (ASX: AKO) is an Australian resources company focused on the
development of four high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (Mt) at 32% iron
Inferred JORC Resource (ASX Announcement 11 April 2022) with very low impurities able to
produce a premium-priced +68% Fe concentrate. Direct Reduced Iron-Electric Arc Furnace (DRIEAF) technology which is used to make greener steel without coal and considerably less carbon
emissions requires iron ore grades of at least 67%.
To generate cash in the near-term, AKORA is advancing plans at Bekisopa to produce up to 2Mt
per annum over the first five years of a 60% Fe average grade direct shipping ore (DSO) (ASX
Announcement 14 November 2023) for shipping to Blast Furnace-Basic Oxygen Furnace
steelmakers.
The Company confirms that it is not aware of any new information or data that materially affects the above and that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed.
And further the Company confirms that all material assumptions underpinning the 2Mt per annum production target
continue to apply and have not materially changed (Announcement V7 ASX04)
5
Appendix 1: JORC Summary
JORC Code, 2012 Edition - Table 1 - Bekisopa Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
•
•
•
•
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire assay’). In other cases, more
explanation may be required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Commentary
•
•
•
•
•
•
Drilling
techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
•
Drill sample
recovery
•
Method of recording and assessing core and chip sample recoveries and results
assessed.
Measures taken to maximise sample recovery and ensure representative nature of
the samples.
Whether a relationship exists between sample recovery and grade and whether
•
•
•
•
•
Diamond drilling was used to obtain HQ size core, with the weathered (friable)
core split using a chisel/hammer and fresher (competent) core cut using a
diamond blade core saw.
Samples were taken along the depth intervals and lithological sub-division
mark-ups to gather representative samples.
Sampling consists of approx. 1m samples of ½ core with breaks at lithological
discontinuities - typical 1-7kg.
Samples were oven dried, manually crushed to -2mm, split twice through a
50/50 riffle splitter to obtain a representative sub-sample of approx. 100g,
and then pulverise that >85 % pass -75 μm.
The pulp samples were sent to an accredited laboratory (ALS) in Perth,
Australia for determination of total iron and a standard “iron suite” of
elements by XRF analyses using techniques ME-XRF21u for standard iron-ore
XRF analysis and method ME-GRA05 for LOI analysis.
QA/QC procedures applied with alternating standards and blanks inserted
every 20 samples, and four duplicates (field and lab) inserted every 100
samples.
Conventional wireline diamond drilling was used to obtain all drillcore and
drilling was undertaken with an EP200 man portable drilling rig. Nominal core
diameter is 63.5mm (HQ) in 0.5-1.5m runs. Drill holes are inclined at -90°
(vertical) and core is not orientated. A total of 61 diamond holes (BEKD223 to
BEKD283) and 508.01m drilled.
Core recovery is measured every run by geologists.
Core recoveries of 93% on average were achieved for sampled core.
No bias or relationship has been observed between recovery and grade.
6
Criteria
JORC Code explanation
Logging
•
•
•
sample bias may have occurred due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and geotechnically logged to
a level of detail to support appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel,
etc) photography.
The total length and percentage of the relevant intersections logged.
Commentary
•
•
•
•
•
•
•
•
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in-situ material
collected, including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
A set of standard operating procedures for drilling and sampling were
prepared by the company and Vato Consulting, who is supervising the
program, and these are always adhered to.
All drill core is logged quantitatively using industry standard practice on site in
enough detail to allow mineral resource estimates as required.
Logging included: core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally
magnetite or hematite), mineralisation style, mineralisation %, structure,
magnetic susceptibility (see below), notes (longhand).
All core is photographed both wet and dry and as both whole and half core.
All core is geotechnically logged and RQD’s calculated for every core run.
All drill holes are logged using a ZH-SM30 magnetic susceptibility meter to
enable accurate distinction of iron (magnetite) rich units and to potentially
differentiate between magnetite and hematite rich mineralisation. Readings
recorded in 25cm intervals.
Density measurements are made using both the Archimedes method (mainly
fresh competent rock) and the Caliper Vernier (mainly weathered friable rock)
methods.
All drill holes logged in their entirety.
•
For metallurgical test work a total of 77 diamond drillholes were selected for
12 DSO composite samples based on sufficient core material and
representative grades available. For the selected drillholes the core samples in
storage were extracted and sampled again. The weathered (friable) core
material was split ½ using a chisel/hammer and fresher (competent) core
material was cut ½ using a diamond blade core saw. Samples were taken along
the depth intervals and lithological/sampled sub-division mark-ups per
drillhole and “domain” to gather the composite samples. The “domains” were
selected to be reflective and similar to the future mining production zones.
See attached Table summarising the DSO composite sample details.
•
Metallurgical samples were sent to ALS (Spain) for independent analysis by
XRF.
No additional quality control samples were included. ALS conduct their own
•
7
Criteria
JORC Code explanation
•
Verification of
sampling and
assaying
•
•
•
•
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
The verification of significant intersections by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Commentary
internal quality control procedures to ensure acceptable levels of accuracy.
•
•
•
•
•
Location of data
points
•
•
•
Data spacing
and distribution
•
•
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
•
•
•
•
Orientation of
data in relation
to geological
structure
•
•
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this should
be assessed and reported if material.
•
•
All work was completed by Vato Consulting personnel and all mineralised
intervals were checked by Vato Consulting’s Principal Geologist.
Two twin holes have been completed, namely BEKD279 (twin hole of
BEKD100) and BEKD283 (twin hole of BEKD121). Some variation in the
lithologies exist, and the distribution of grades generally correlates well.
All data was recorded on paper logs and after captured using Seequent
MXDeposit database software.
No adjustment to assay data has been made.
Final collar locations have been completed at the end of the drilling program
by using differential GPS (dGPS) (with an accuracy to cm).
The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
An accurate topographic survey was completed in 2021 by FUTURMAP, a local
surveying consultant. The survey was conducted using PHANTOM 4 Pro type
drones, and a pair of LEICA System 1200 dual frequency GPS. An accuracy of
10mm horizontal and 20mm vertical is quoted.
Data spacing nominally at 50m x 50m for infill drillhole collars within the
mineralisation zones with downhole sample spacing averaging 0.83m, under
geological control. The high-grade iron mineralisation (56-67%Fe) suitable for
Direct Shipping Ore (DSO) within the regolith (weathered/oxidized material) as
identified by previous drilling in 2020/2021/2022/2023 are covered by the
infill drilling program.
The data spacing and distribution is considered appropriate to establish
geological and grade continuity for the style of mineralisation being
intersected and the classification of Mineral Resources.
No samples were composited except for the metallurgical test work.
The ironstone unit has a strong north-south trend with a steep to shallow
westerly dip. The ironstone unit has a conspicuous regolith zone with
completely to highly weathered material up to 27m deep. The regolith hosts
iron mineralisation with enrich DSO parts.
Vertical drilling is undertaken to intercept mineralisation and test the
mineralisation in the regolith (weathered zone) and enrich DSO parts.
8
Criteria
Sample security
JORC Code explanation
•
Commentary
The measures taken to ensure sample security.
•
No sample known bias present.
•
Chain of Custody procedures are implemented to document the possession of
the samples from collection through to storage, customs, export, analysis, and
reporting of results. Chain of custody forms are a permanent records of
sample handling and off-site dispatch.
The on-site Geologist is responsible for the care and security of the samples
from the sample collection to the export stage. Samples prepared during the
day are stored in the preparation facility in labelled sealed plastic bags.
The metallurgical test work laboratory confirmed and labelled samples as
soon as they were received from the independent courier, following their
internal sampling protocol and operating procedures. Samples were
confirmed with the Company once logged into the laboratory system. .
No audit has been conducted.
•
•
Audits or reviews
•
•
The results of any audits or reviews of sampling techniques and data.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status
•
•
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Commentary
•
•
•
The Company completed the acquisition of the minority interest in Iron Ore
Corporation of Madagascar sarl held by Cline Mining Corporation on 5 August 2020.
The Company holds through Iron Ore Corporation of Madagascar sarl, Universal
Exploration Madagascar sarl and a Farm-in Agreement 12 exploration permits in three
geographically distinct areas. All administration fees due and payable to the Bureau du
Cadastre Minier de Madagascar (BCMM) have been and accordingly, all tenements are
in good standing with the government.
The tenements are set out in the below
9
Criteria
JORC Code explanation
Commentary
Exploration done
by other parties
•
Acknowledgment and appraisal of exploration by other parties.
•
Geology
•
Deposit type, geological setting and style of mineralisation.
•
•
•
•
Drill hole
Information
•
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
•
Exploration has been conducted by UNDP (1976 - 78) and BRGM (1958 - 62). Final
reports on both episodes of work are available and have been utilised in the recent IGR
included in the Akora prospectus. Airborne magnetics was flown for the government
by Fugro and has since been obtained, modelled and interpreted by Cline Mining and
Akora.
Iron mineralisation at Bekisopa is believed to be of metasomatic origin and
preferentially hosted by calc-silicate rocks within a high-grade metamorphic sequence.
The mineralisation occurs as a series of magnetite bearing gneisses and calc-silicates
that occur as zones between 50m and 150m combined true width.
The mineralisation occurs as layers of massive magnetite (sometimes altered to
hematite) between 1m and 7m true width plus a lower grade zone that consists of
lenses, stringers, boudins and blebs of magnetite aggregates that vary from 1cm to 10’s
of cm wide within a calc-silicate/gneiss unit (informally termed “coarse disseminated”
here). These units sometimes have an outer halo of finer disseminated magnetite
(informally termed “disseminated” here).
This wide mineralisation halo provides a large tonnage potential over the 6-7km strike
of mapped mineralisation and associated magnetic anomaly within the Akora
tenement.
All relevant drillhole information related to the 2020/2021/2022/2023/2024 drilling
programs have been previously reported to the ASX. No material changes have
occurred to this information since it was originally reported.
•
10
Criteria
JORC Code explanation
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths and
intercept lengths
•
Diagrams
•
•
•
Balanced
reporting
•
Other
substantive
exploration data
•
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade results
and longer lengths of low-grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (e.g. ‘down hole length, true width not
known’).
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Commentary
•
•
None used. All assays reported as received.
Not relevant – exploration results are not being reported; a Mineral Resource has been
defined.
•
Not relevant – exploration results are not being reported; a Mineral Resource has been
defined.
•
Not relevant – exploration results are not being reported; a Mineral Resource has been
defined.
•
All relevant results of the test work presented are being reported in this release.
•
In June 2024 Akora completed 400 meters of geotechnical drilling at Bekisopa in the
northern, central and southern resource areas. The 8 by 50 meters holes are designed
to inform the PFS on rock mechanics and rock strength to support mining method
development.
Bekisopa Hydrogeological drilling was completed in August 2024 with two 150 meter
deep bore holes and two adjacent 70-meter-deep observation wells to test for the
presence on subsurface water and test water recharge characteristics.
•
•
Further work
•
•
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
•
Complete the Pre-Feasibility Study by Wardell Armstrong International.
11
Appendix 2:
Table summarizing Bekisopa DSO composite sample details:
12
13
14
Share your feedback