Bekisopa Southern Zone DSO Resource Drilling
Released
Released
Announcement PDF
ASX Release
20 September 2022
In-fill DSO resource drilling progressing well
Highlights:
•
In-fill drilling at the Bekisopa Southern Zone commenced September 8
•
22 drill holes completed
•
Iron mineralisation present in drill core from surface
AKORA Resources Managing Director Paul Bibby, commented “Drilling and geological
evaluation progressing extremely well with good intercepts of weathered massive iron
mineralisation observed from surface with potential for DSO mineralisation in these iron rich
areas.”
Introduction
AKORA Resources (“AKORA” or “the Company”) (ASX Code: AKO) is pleased to provide
shareholders with an Update on the 2022 Bekisopa Southern Zone DSO in-fill resource drilling.
Since drilling commenced on 8 September twenty-two drill holes have been completed for 283
metres at a 94% core recovery. Images set out below show the geological evaluation and iron
mineralisation in drill core.
The drilling has achieved very encouraging intercepts of iron mineralisation with preparation
for geological evaluation and assay preparation underway. The drill core assay pulps will be
prepared at the OMNIS Laboratory in Antananarivo and dispatched to ALS Perth Iron Ore
Technical Centre for assaying, as previously.
2022 Bekisopa Southern Zone DSO in-Fill resource drilling
Drill core logging, including magnetic susceptibility measurements and photographing which
is indicating some high iron grades in the near surface drill core.
Bekisopa drill core for hole BEKD72 showing weathered zone iron mineralisation at surface.
Solid weathered zone drill core potentially high-grade DSO lump and fines iron ore.
Completed
drill holes.
DSO in-fill drilling progressing well with good surface intercepts being observed.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About AKORA Resources
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa, Tratramarina and Ambodilafa Projects. All iron ore prospects in
Madagascar where AKORA holds some 308 km2 of tenements across these three prospective
exploration areas. Bekisopa Iron Ore Project is a high-grade iron ore project with an ~6km
strike length and a proven inferred resource of 194.7million tonnes. Bekisopa has outcropping
and weathered zone DSO iron ore and potential to produce a premium grade +68% iron
concentrate suitable for Direct Reduced Iron pellets for the Green Steel future.
Competent Person’s Statement
The information in this statement that relates to Exploration Targets and Exploration Results
is based on information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA
and is a full-time employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional
Natural Scientist (Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific
Professions (SACNASP). Mr. Leeuwner has sufficient experience which is relevant to the
style of mineralisation and type of deposits under consideration and the activity being
undertaken to qualify as a Competent Person as defined in the Note for Mining Oil & Gas
Companies, June 2009, of the London Stock Exchange and the 2012 Edition of the ‘Australian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC
Code). Mr. Leeuwner consents to the inclusion of the information in this release in the form
and context in which it appears.
Authorisation
This announcement has been authorised by the AKORA Resources Board of Directors on 19
September 2022.
JORC Code, 2012 Edition - Table 1 - Bekisopa Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed information.
• Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
•
•
Conventional wireline diamond drilling is used to obtain all drill
core and drilling is undertaken with a EP200 man portable
drilling rig. Nominal core diameter is 63.5mm (HQ) in 0.5-1.5m
runs. Drill holes are inclined at -90° (vertical) and core is not
orientated. A total of 22 diamond holes (BEKD64 to BEKD85)
and 283.16m drilled to date, with drilling ongoing.
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
•
•
Core recovery is measured every run by geologists.
Core recoveries of 94% on average were achieved for sampled
core.
No bias or relationship has been observed between recovery
and grade.
Drilling
techniques
Drill sample
recovery
Commentary
•
•
•
•
Diamond drilling was used to obtain HQ size core, with the
weathered (friable) core split using a chisel/hammer and fresh
(competent) core cut using a diamond blade core saw.
Samples were taken along the depth intervals and lithological
sub-division mark-ups to gather representative samples.
Sampling consists of approx. 1m samples of ½ core with breaks
at lithological discontinuities - typical 1-5kg.
Sample preparation and analysis are pending.
Criteria
JORC Code explanation
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Commentary
•
•
•
•
•
•
•
•
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
•
•
A set of standard operating procedures for drilling and sampling
were prepared by the company and Vato Consulting, who is
supervising the program, and these are always adhered to.
All drill core is logged quantitatively using industry standard
practice on site in enough detail to allow mineral resource
estimates as required.
Logging included: core recovery %, primary lithology, secondary
lithology, weathering, colour, grain size, texture, mineralisation
type (generally magnetite or hematite), mineralisation style,
mineralisation %, structure, magnetic susceptibility (see below),
notes (longhand).
All core is photographed both wet and dry and as both whole
and half core.
All core is geotechnically logged and RQD’s calculated for every
core run.
All drill-holes are logged using a ZH-SM30 magnetic
susceptibility meter to enable accurate distinction of iron
(magnetite) rich units and to potentially differentiate between
magnetite and hematite rich mineralisation. Readings recorded
in 25cm intervals.
Density measurements are made using both the Archimedes
method (mainly fresh competent rock) and the Caliper Vernier
(mainly weathered friable rock) methods.
All diamond core holes logged in their entirety.
A set of standard operating procedures for drilling and sampling
were prepared by the company and Vato Consulting, who is
supervising the program, and these are always adhered to.
All core is fitted together so that a consistent half core could be
collected, marked up with a “top” line (line perpendicular to dip
and strike, or main foliation), sample intervals decided and
marked up and the core subsequently cut in half using a core
Criteria
JORC Code explanation
• Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
Commentary
•
•
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and assaying
Location of
data points
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
saw, separating samples into the marked-up intervals. If the
core is weathered (friable), it is split in half using a hammer and
chisel. The intervals are nominally 1m, but smaller intervals are
marked if a change in geology occurred within the 1m interval.
The half core sample intervals are placed into polythene bags
along with a paper sample tag. This is then sealed using a cable
tie and placed into a second polythene bag with a second paper
tag and this is sealed using a cable tie.
Sample batch transport to and subsequent preparation at the
preparation laboratory facility in Antananarivo (OMNIS) are
pending.
•
No assaying has been undertaken as yet on the drillholes being
reported.
•
As assaying has not yet been undertaken, only qualitative
descriptions are reported, and magnetic susceptibility readings
are recorded.
•
Drillhole collars have been provisionally located using a handheld GPS (+/-2-3m accuracy). Final collar locations will be
completed at the end of the drilling program by using differential
GPS (dGPS) (with an accuracy to cm).
The grid system used is UTM, WGS84, Zone 38 Southern
•
Criteria
JORC Code explanation
Commentary
•
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
•
•
•
Orientation of • Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
data in
the deposit type.
relation to
• If the relationship between the drilling orientation and the orientation
geological
of key mineralised structures is considered to have introduced a
structure
sampling bias, this should be assessed and reported if material.
•
•
•
Sample
security
• The measures taken to ensure sample security.
•
Hemisphere
An accurate topographic survey was completed in 2021 by
FUTURMAP, a local surveying consultant. The survey was
conducted using PHANTOM 4 Pro type drones, and a pair of
LEICA System 1200 dual frequency GPS. An accuracy of 10mm
horizontal and 20mm vertical is quoted.
Data spacing nominally at 50m x 50m for infill drillhole collars
within the southern mineralisation zone. The high-grade iron
mineralisation suitable for Direct Shipping Ore (DSO) within the
regolith (weathered material) as identified by previous drilling in
2020/2021 (an estimate of 4.2Mt) are covered by the infill drilling
program.
The data spacing and distribution is considered appropriate to
establish geological and grade continuity for the style of
mineralisation being intersected and the classification of Mineral
Resources.
No sample compositing has been applied.
The ironstone unit has a strong north-south trend with a steep to
shallow westerly dip. The ironstone unit has a conspicuous
regolith zone with completely to highly weathered material up to
10-20m deep. The regolith hosts iron mineralisation with enrich
DSO parts.
The vertical infill drillholes to test the mineralisation in the
regolith (weathered zone).
No sample known bias present.
Chain of Custody procedures are implemented to document the
possession of the samples from collection through to storage,
customs, export, analysis, and reporting of results. Chain of
custody forms are a permanent records of sample handling and
Criteria
JORC Code explanation
Commentary
•
•
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
•
off-site dispatch.
The on-site Geologist is responsible for the care and security of
the samples from the sample collection to the export stage.
Samples prepared during the day are stored in the preparation
facility in labelled sealed plastic bags.
Samples will be delivered to the preparation laboratory and
subsequent analytical laboratory by courier.
No audit has been conducted.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
• Type, reference name/number, location and ownership including
Mineral
agreements or material issues with third parties such as joint
tenement and
ventures, partnerships, overriding royalties, native title interests,
land tenure
historical sites, wilderness or national park and environmental
status
settings.
Commentary
•
•
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
•
The Company completed the acquisition of the minority interest
in Iron Ore Corporation of Madagascar sarl held by Cline Mining
Corporation on 5 August 2020.
The Company holds through Iron Ore Corporation of
Madagascar sarl, Universal Exploration Madagascar sarl and a
Farm-in Agreement 12 exploration permits in three
geographically distinct areas. All administration fees due and
payable to the Bureau du Cadastre Minier de Madagascar
(BCMM) have been and accordingly, all tenements are in good
standing with the government.
The tenements are set out in the below
Criteria
JORC Code explanation
Commentary
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties.
•
Exploration has been conducted by UNDP (1976 - 78) and
BRGM (1958 - 62). Final reports on both episodes of work are
available and have been utilised in the recent IGR included in
the Akora prospectus. Airborne magnetics was flown for the
government by Fugro and has since been obtained, modelled
and interpreted by Cline Mining and Akora.
Geology
• Deposit type, geological setting and style of mineralisation.
•
The tenure was acquired by AKO during 2014 and work since
then has consisted of:
o Data compilation and interpretation;
o Confirmatory rock chip sampling (118 samples) and
mapping;
o Re-interpretation of airborne geophysical data;
o Ground magnetic surveying (305-line km’s);
o The 2020 drilling program of 1095.5m diamond core
drilling in 12 drillholes.
o The 2021 drilling program of 5117.02m diamond core
drilling in 52 drillholes.
The drilling has shown that the surface mineralisation continues
at depth, with at most a 25% increase in grade due to
weathering effects. However, it should be noted that some
•
Criteria
JORC Code explanation
Commentary
•
•
•
Drill hole
Information
Data
aggregation
methods
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high-grade
•
•
•
downslope creep of scree from these units may exaggerate
apparent width at surface.
The mineralisation occurs as a series of magnetite bearing
gneisses and calc-silicates that occur as zones between 50m
and 150m combined true width.
The mineralisation occurs as layers of massive magnetite
(sometimes altered to hematite) between 1m and 7m true width
plus a lower grade zone that consists of lenses, stringers,
boudins and blebs of magnetite aggregates that vary from 1cm
to 10’s of cm wide within a calc-silicate/gneiss unit (informally
termed “coarse disseminated” here). These units sometimes
have an outer halo of finer disseminated magnetite (informally
termed “disseminated” here).
This wide mineralisation halo provides a large tonnage potential
over the 6-7km strike of mapped mineralisation and associated
magnetic anomaly within the Akora tenement.
All relevant drillhole information related to the 2020/2021 drilling
programs have been previously reported to the ASX. No material
changes have occurred to this information since it was originally
reported.
Another 22 diamond drillholes (BEKD64 to BEKD85) have been
completed in 2022 with drill collar data as stated in this release.
Drilling is ongoing.
NA, sample preparation and analysis are pending.
Criteria
JORC Code explanation
•
results and longer lengths of low-grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole length, true
width not known’).
Relationship
between
mineralisatio
n widths and
intercept
lengths
•
Diagrams
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Balanced
reporting
Other
substantive
exploration
data
Further work
•
•
Commentary
•
NA, sample preparation and analysis are pending.
•
All relevant maps and tabulations of drill hole collars provided in
this release.
•
•
NA, sample preparation and analysis are pending.
Drilling is ongoing.
•
NA
•
Drilling is ongoing to compete approx. 850m of planned
drillholes.
2022 BEKISOPA Southern Zone DSO In-fill Drilling Collars
Hole_ID
BEKD64
BEKD65
BEKD66
BEKD67
BEKD68
BEKD69
BEKD70
BEKD71
BEKD72
BEKD73
BEKD74
BEKD75
BEKD76
BEKD77
BEKD78
BEKD79
BEKD80
BEKD81
BEKD82
BEKD83
BEKD84
BEKD85
Depth
10.68
8.63
10.60
19.53
14.62
14.61
8.60
7.58
10.50
12.59
10.60
14.59
8.64
9.66
12.58
14.66
14.58
12.57
17.63
16.53
20.57
12.61
Easting
586750
586801
586852
586897
586947
586998
587049
586998
586950
586900
586847
586797
586746
586749
586851
586952
587051
587099
587050
586998
586948
586901
Northing
7608200
7608200
7608199
7608199
7608200
7608200
7608250
7608249
7608252
7608249
7608249
7608249
7608249
7608301
7608298
7608301
7608299
7608348
7608348
7608353
7608350
7608350
RL
871
875
879
885
890
886
897
884
883
876
871
870
866
865
869
882
901
904
899
894
876
871
Azimuth
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Inclination
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90