Maiden Resource Southern Zone
Released
Released
Announcement PDF
ASX Announcement
11 April 2022
Bekisopa Total Maiden Inferred Resource
194.7 million tonnes
110.2 Mt Inferred Resource in the Southern Zones
✓
✓
37.8% Davis Tube Recovery (DTR), producing a
67.6%Fe concentrate grade at a 75-micron grind size
plus, the previously reported, ASX Announcement 23 March 2022:
41.2 Mt Inferred Resource in the Central Zone
✓
✓
36.3% DTR, producing a
67%Fe concentrate grade at a 75-micon grind size
43.3 Mt Inferred Resource in the Northern Zone
✓
✓
43.3% DTR, producing a
68.2%Fe concentrate grade at a 75-micron grind size
In total 194.7 Mt Inferred Resource for Bekisopa
✓
✓
38.7% DTR, producing a
67.6%Fe concentrate grade at 75-micron grind size
Contains 7.8 Mt of Direct Ship Ore (DSO) at surface from less than
30% of the 6-kilometer strike length
To the 7.8 Mt weathered zone DSO will be added the high-grade
outcrop material increasing the DSO lump and fines
Commenting on the Resource Estimate AKORA Resources Managing Director Paul
Bibby, commented that “This 195 million tonnes Maiden Mineral Resource for Bekisopa
is excellent and exceeded expectations. Within this mineral resource of 195 million
tonnes is 7.8 million tonnes of weathered zone DSO from the drilling on only one third
of the six-kilometer strike length. There is potential for Resources and DSO to be defined
from between these zones and with the resource down dipping to the west. The Maiden
Resource tonnes are substantial, the product grade is excellent and the potential for
significant additional Resource and DSO tonnage cannot be underestimated. This is an
extremely encouraging result, achieved within 15 months of listing, confirming Bekisopa
as a significant new iron ore discovery.”
1|Page
Introduction
AKORA Resources (“AKORA” or “the Company”) (ASX Code: AKO) is pleased to provide
shareholders with the completed Maiden Inferred Mineral Resources for all the Bekisopa
project. 194.7 million tonnes as the total Maiden Inferred Mineral Resource highlights the
significant upside potential on the main tenements at Bekisopa.
At the time of preparing the AKORA Resources prospectus and budgets the Company forecast
a 100 million tonnes Mineral Resource from the first 4,000 metres of drilling at Bekisopa. As
drilling success progressed it was decided to bring forwarded additional drilling planned for
2022 into the 2021 campaign to minimize costs and maximise the size of any potential Mineral
Resource. These decisions have resulted in a 195 million tonne maiden resource comprised
of 110 Mt in the Southern Zone, 41.2Mt in the Central Zone and 43.3Mt in the
Northern Zone. The combined 84.5Mt resource for the Northern and Central Zones were
set out in ASX Announcement on 23 March 2022.
Figure 1 shows the magnetic anomaly that defines the 6-kilometre strike length on the main
Bekisopa tenements and drill hole locations for all drill zones. This shows that only some 30%
of the strike length has been drilled, further drilling should expand the resource considerably.
Tenement
3757
Northern
Zone
Tenement
10430
5 X 5 kms
Central
Zone
Southern
37
Zone
Drill Holes
Figure 1.
2020 and 2021 drill hole locations delivered a 194.7 Mt Maiden Mineral Resource at Bekisopa including
110 Mt in the Southern Zone, with plenty more ground to drill to further expand the resource.
2|Page
The Southern, Central and Northern Zone Maiden Mineral Resource details are shown in
Table 1 and the DTR concentrate grades are shown in Table 2.
Inferred
Tonne
Mt
DTR
%
Head Grade
%Fe
Concentrate
Grade
%Fe
DTR
Mt
Southern
110.2
37.8
32
67.6
42
Central
Northern
41.2
43.3
36.3
43.3
30
33.3
67
68.2
15
19
Total
(Inferred)
194.7
38.7
32
67.6
75.4
Table 1.
Bekisopa Maiden Inferred Resource for the Southern, Central and Northern Zones.
Concentrate Grades
%Al2O3
%P
%S
%Fe
%SiO2
%TiO2
LOI
%
Southern
67.6
1.8
0.6
0.011
0.285*
0.17
-2.0
Central
Northern
67
68.2
2.3
1.3
0.6
0.7
0.005
0.005
0.33*
0.028
0.19
0.20
-1.93
-2.63
Average
67.5
1.8
0.6
0.008
0.237*
0.18
-2.13
Table 2.
Bekisopa Maiden Resource DTR concentrate grade for the Southern, Central and Northern Zones.
* - The elevated sulphur levels are discussed below.
Southern Zone Maiden Mineral Resource
110.2 million tonnes Maiden Inferred Mineral Resource for the Bekisopa Southern Zone
has exceeded all expectation. The Davis Tube Recovery at 37.8% means that only 2.6 feed
tonnes are required to produce one tonne of concentrate grading 67.6% iron, both outstanding
results. The product grade impurity levels continue to be extremely low for silica, alumina and
phosphorous.
The overall sulphur levels are elevated and on first examination this is primarily due to a region
at depth in the northeastern section of the expansive Southern Zone. This region of higher
sulphur is estimated to be some 21 million tonnes and further resource and processing
evaluation will be conducted in the coming months to maximise value from this resource. This
region i at depths of 20 to 30 meters and likely to be processed in later decades enabling time
to determine the best practices to reduce the sulphur levels. The conventional practices to
reduce high impurity levels is firstly by blending with lower grade material and then, if
necessary, evaluate using dry separation processes utilising proven centrifugal and
electrostatic methods that use density to separate out the sulfide minerals or other techniques
to improve impurity grades.
The Southern Zone in area is the largest drilling grid with 37 drill holes which defined several
wide and deep cross sections, refer Figures 2 (a), (b), (c) and (d). These sections show highgrade iron mineralisation intervals at surface ranging from 59 to 66%Fe, suitable for Direct
Shipped Ore (DSO). These areas of high-grade iron will be better defined by closer spaced
shallow drilling and then selectively mined to maximise tonnage, grades and revenue.
3|Page
7,608,450N
400m
Gneiss/Calc-silicate
Figure 2 (a).
Southern Zone cross Section 7,608,450N covering drill holes BEKD18 and BEKD55 to 60. High-grade
~66%Fe and ~61%Fe at surface in BEKD18 and 55 and at depth in BEKD56 7.5m @ 64.9%Fe and a
continuous 150.8m iron mineralisation intercept at 33.2%Fe in BEKD59.
7,608,300N
400m
Gneiss/Calc-silicate
Figure 2 (b).
Southern Zone cross Section 7,608,300N covering BEKD17, BEKD46 to 49, BEKD54 and BEKD61. Highgrade ~66%Fe and ~63%Fe at surface in BEKD17 and 54 and at depth in BEKD46 19.5m @ 63.3%Fe and
13.3m @ 64.4%Fe and a continuous 162.8m iron mineralisation intercept of 35.9%Fe in BEKD46.
4|Page
7,608,150N
Gneiss/Calc-silicate
Iron Formation
400m
Figure 2 (c)
Southern Zone cross Section 7,608,150N covering BEKD09 to 11, 13 and 14, 43, 62, 34 and 35. Highgrade at surface of 61%Fe, 61%Fe and 65%Fe in BEKD10, 11 and 13.
7,608,000N
400m
Figure 2 (d).
Southern Zone cross Section 7,608,000N covering BEKD15,16, 44, 45, 63, 32 and 33. High-grade at
surface of ~64%Fe, 65%Fe and 60% in BEKD 44, 16 and 15 and 62% to 65%Fe in BEKD32 and 33.
From the cross sections, Figures 2(a) to (d), high-grade surface intercepts ranging from 59 to
66%Fe, suitable for DSO, can be seen from 1.2m to 25.2m thickness along the eastern edge
of the Southern iron formation that looks to be continuous both along and across strike. Plus,
iron mineralisation at surface on the western side. The Mineral Resource modeling assumes
a conventional bulk mining method, uses mining blocks that are 5 metre high, 25 metres wide
and 50 metres long, which may dilute the potential surface DSO grade and add tonnes. Within
the overall Southern Zone resource the modelling has estimated some 4.2 million tonnes of
DSO potential. For the Northern and Central Zones this same approach has determined 3.6
million tonnes of DSO for an overall DSO tonnage of 7.8 million tonnes, refer Table 3.
5|Page
Zone
DSO Mt
Southern
4.2
Central
2.2
Northern
1.4
Total
7.8 Mt
DSO %Fe
57
50
52
54 %Fe
Table 3.
Resource estimate shows there to be 7.8 Mt for the Direct Shipped Ore potential at a combined iron grade
of 54%. The bulk mining resource methodology will tend to dilute the overall grade potential where the
weathered zones are incorporated into thicker bulk mining resource blocks.
The bulk mining resource methodology will tend to dilute the overall grade potential where the
weathered zones are incorporated into thicker bulk mining resource blocks and add tonnes.
Using selective mining of the DSO material, with minimal country rock, should deliver highergrade DSO products closer to assay results. AKORA’s intention is to selectively mine the
areas of higher-grade surface mineralisation, ranging from 59 to 66%Fe, as highlighted in
Figures 2 (a) to (d). With this weathered DSO will be blended the high-grade outcrop, shown
to average 66.7%Fe from rock chip sampling. Combined, these DSO sources should deliver
an average higher-grade DSO lump and fines product. More shallow infill drilling is required
to better define the DSO tonnage and grade potential prior to mining.
Conclusion
The 194.7 million tonnes Maiden Inferred Mineral Resource for Bekisopa at a
concentrate grade of 67.6%Fe has exceeded expectation and places the Bekisopa project
as a significant iron ore resource worthy of further evaluation and development.
The Southern Zone maiden resource at 110.2 million tonnes is substantial and exceeds
AKORA’s and H&S Consultants, our Resource Geologists, expectations. The DTT
concentrate grade at 67.6%Fe is a premium grade product suitable for Direct Reduced Iron
(DRI) pellet feed. DRI will be in increasing demand as the Iron and Steel industry embarks on
a green de-carbonised future that will require higher iron feed grades with low impurity levels.
This extensive 194.7 Mt maiden Mineral Resource confirms the AKORA Boards decision to
list the company and accelerate the drilling campaigns. The result confirms that Bekisopa is
a significant iron ore resource that could deliver high-grade fines and concentrates at relatively
coarse sizing’s after a DSO start-up focused on the high-grade outcrop and weathered zone
iron ore formations, which is estimated to range from 10 to 20 million tonnes.
6|Page
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About AKORA Resources
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa Project, the Tratramarina Project and the Ambodilafa Project,
iron ore projects in Madagascar, in all totaling some 308 km2 of tenements across these three
prospective exploration areas. Bekisopa Iron Ore Project is a high-grade magnetite iron ore
project of >6km strike and is the key focus of current exploration drilling and resource
modelling.
Competent Person’s Statement
The data in this report that relates to Mineral Resource Estimates and Exploration Targets for the
Bekisopa deposits is based on information evaluated by Mr Simon Tear who is a Member of The
Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant
to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr
Tear is a Director of H&S Consultants Pty Ltd and he consents to the inclusion in the report of the
Mineral Resource in the form and context in which they appear.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Director of Akora Resources Limited (AKO), as such he is a shareholder in
Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its
processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and
mineral processing results.
Authorisation
This announcement has been authorised by the AKORA Resources Board of Directors on 10
April 2022.
7|Page
Appendix 1
“INFORMATION REQUIRED
AS PER ASX LISTING RULE 5.8.1”
8|Page
8th April 2022
Paul Bibby
Akora Resources Limited
(by email)
Updated Mineral Resource Estimates, Bekisopa, Madagascar
H&S Consultants Pty Ltd (“H&SC”) was requested by Akora Resources Limited (“AKO”) to update
the Mineral Resource estimates for the Bekisopa Iron Ore Project in southern Madagascar. The target
commodity is iron mineralisation as massive magnetite with a secondary option of near-surface
direct shipping oxidised iron material. In 2020/1 AKO drilled 64 diamond exploration holes for
approximately 6,212.5m and 3,930 samples on the Southern, Central and Northern target areas, part
of a continuous belt of magnetite mineralisation stretching for 6km of strike. All the results for the
Southern deposit have been received and the Mineral Resources for this are the main feature of the
update. In addition, a review of the direct shipping ore (“DSO”) potential for the Southern, Central
and Northern areas is also reported. The new estimates have been reported in accordance with the
JORC 2012 Code and Guidelines. Additional details and maps are supplied in Appendix 1.
The project is located within Paleoproterozoic age rocks in south central Madagascar. The local
geology consists of a calc-silicate unit within schists and gneisses. The calc-silicate unit appears to
have been a favourable host for deposition of iron mineralisation from metasomatic fluids derived
from either magmatic or metamorphic processes. As is normal for high grade metamorphic rocks,
the units show evidence of complex deformation including several generations of folding. There is
some evidence of an early isoclinal folding and this can be seen in both outcrop and regional scales.
The iron mineralisation does not appear to be isoclinally folded but is affected by a later open folding
event as seen on the cross sections. The iron mineralisation occurs dominantly as magnetite
although some hematite is noted, in particular within near surface environments suggesting this
may be due to later alteration/oxidation. A few instances of hematite are also noted in unweathered
rocks, but this is rare and may be related to alteration around fault zones. The mineralisation has
the form of a tabular zone or zones and trends from steeply westerly dipping in the north to
moderately westerly dipping in the centre and flat dipping in the south. Faulting is not apparent on
a large scale but may be present on a smaller scale that has not been identified with the current drill
spacing. Oxidation is variable but generally complete oxidation is between 5 and 20m below surface
and partial oxidation (generally around fractured zones only) is variable. There has been some iron
enrichment in the oxidised zone due to removal of host rock material via weathering and there is
H&S CONSULTANTS Pty. Ltd.
www.hsconsultants.net.au
ABN 72 155 972 080
6/3 Trelawney St, Eastwood, NSW 2122
Level 4, 46 Edward St Brisbane, QLD 4000
P | +61 2 9858 3863
P.O. Box 16116, City East, Brisbane, QLD 4002
E | info@hsconsultants.net.au
P | +61 7 3012 9393
Bekisopa, Resource Estimates, Akora Resources
April 2022
some potential for DSO at +58% Fe in the upper, completely oxidised zone and in surficial scree
derived from this material.
AKO has supplied the drillhole database for the deposit, which H&SC has accepted in good faith as
an accurate, reliable and complete representation of the available data. H&SC performed very
limited validation of the data but did not detect any obvious problems likely to impact significantly
on the resource estimates. The drillhole database for Bekisopa is satisfactory for resource estimation
purposes; however, responsibility for quality control resides solely with AKO.
Drill spacing was nominally 200m by 100m in the Northern target area, 200m by 50m in the Central
target area and 150m by 50m in the Southern target area. The drilling technique and hole spacing is
considered appropriate for the style of mineralisation and the generation of Mineral Resource
estimates. Core recovery for the HQ/NTW drilling averaged about 95-96% with no significant
relationship between iron grade and recovery. All drillholes were surveyed downhole every 10m
using a Reflex EZ-Gyro gyroscopic multi-shot camera. No excessive hole deviations have been
recorded. The hole collars were located by DGPS to sub-centimetre accuracy and the topography
survey was conducted using PHANTOM 4 Pro type drones, and a pair of LEICA System 1200 dual
frequency GPS. An accuracy of 10mm horizontal and 20mm vertical is quoted.
A set of standard operating procedures for drilling and sampling were prepared by AKO and Vato
Consulting, the latter of whom supervised the exploration programme, and these were always
adhered to. All drill core was logged qualitatively and quantitatively on-site using industry
standard practices. Logging included core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally magnetite or hematite),
mineralisation style, mineralisation %, structure and magnetic susceptibility. All core was
photographed both wet and dry and as both whole and half core. All core was geotechnically logged
and RQD’s calculated for every sample interval. All drill-holes were logged using a magnetic
susceptibility meter to enable accurate distinction of iron (magnetite) rich units and to potentially
differentiate between magnetite and hematite-rich mineralisation. Density measurements were
made using both the weight in air/weight in water (Archimedes method) for mainly fresh rock and
the Calliper Vernier method for mainly regolith material.
Sampling consisted of sawn half core under geological control and measured hand-held magnetic
susceptibility levels. Sample intervals ranged from 0.33m to 2.84m in length with an average length
of 0.84m. The half core sample intervals were put into polythene bags along with a paper sample
tag. This was then sealed using a cable tie and placed into a second polythene bag with a second
paper tag and this was sealed using staples. The samples were subsequently transferred at regular
intervals to the commercial sample preparation facility in Antananarivo (OMNIS) where they
underwent sorting and weighing, drying at 110-120°C until totally dry. The samples were then
weighed, jaw crushed to 2mm and riffle split (1:1) with one half kept as reference. A sub-sample of
100g with 80% passing 2mm was pulverised to minus 75 microns and sent for chemical analysis at
a commercial laboratory. The sample prep procedure is to industry standard. Residual material
from the various sample prep stages is stored for future reference. Sample analysis comprised head
assays using the XRF technique for the “Iron Ore Suite” at ALS in Perth and Ireland, with the
recovered magnetic fraction analysis completed using a Davis Tube (“DTR”) and XRF analysis of
the DTR fraction i.e. the concentrate grades. The sample prep, sample sizes and analytical
techniques are considered appropriate for the style of mineralisation and the commodity sought.
Page 10
Bekisopa, Resource Estimates, Akora Resources
April 2022
QAQC comprised standards, blanks and duplicates with blanks inserted every 40th sample, likewise
for the standards with lab duplicates inserted at a rate of 2 to 4 per 100 samples. The QAQC
programme is to industry standard. The QAQC results indicate no issues with the sampling or assay
data.
The geological interpretation for the Mineral Resources was completed on appropriately spaced
cross sections for each target area i.e. 200m for the Central and Northern deposits and 150m for the
Southern deposit. A series of strings snapped to the drillholes were used to create a series of surfaces
and solids, these included a main mineral zone and subordinate footwall lodes, 2 for the Central
zone and 1 for the Northern zone along with surfaces representing the base of high grade oxidised
surface mineralisation, the base of regolith/base of complete oxidation and the base of partial
oxidation. Design of the mineral solids was based on a combination of logged geology and the
sampling with additional input from DTR/head iron grades; nominal DTR cut-off of 6-8% was used
where data was available. The high grade zone surface was based on proximity to the topographic
surface and a nominal head grade iron cut-off grade of about 55% Fe in conjunction with geological
sense. The other oxidation surfaces were based on logged geology, sulphur head assays and
geological sense.
Metal grade interpolation used Ordinary Kriging on 1,466 2m composites for the areas under
consideration. Composites for the mineralisation were extracted from the drillhole database
constrained by the mineral wireframes (fixed length for Central and Northern, ‘best fit’ for
Southern). Elements modelled included DTR and head Fe grades along with concentrate Fe, SiO2,
Al2O3, P, S, TiO2 and Loss on Ignition (“LOI”). No top cuts were applied to the data due to the
relatively low coefficients of variation for each element, generally <0.5, and relatively wellstructured data. The distinct high grade surface mineralisation was modelled separately using a
hard boundary to avoid smearing high grades into the main body of mineralisation.
Block models were orthogonal to the national grid with block sizes for the deposits being 25m by
50m by 5m (X, Y & Z) with no sub-blocking. A 3 pass search strategy was employed for all deposits
using initial search radii of 200m by 300m by 20m with a minimum number of 12 data and 4 octants.
The search ellipse was expanded to 300m by 450m by 30m with the same number of minimum data
and octants and then completed with the same larger search radii but with a minimum of 6 data and
2 octants. One search domain was used for each of Central area, two were used for the Northern
area reflecting a modest change in strike and two were used for the Southern area reflecting the
different dip directions. The wireframe boundaries for the mineralisation act as hard boundaries.
Density data for the complete area comprised 5,451 measured values from single selected pieces of
drillcore, 10-15cm in length. 2,661 samples were from the partially weathered and fresh rock zones
with the remaining samples from the regolith and weathered surface material. Density data for the
Southern, Central and Northern deposits comprised 2,889, 904 and 1,482 samples respectively, with
the data modelled unconstrained using Ordinary Kriging. Search parameters were relatively similar
to the parameters used for the metal grade interpolation with an additional larger search to ensure
the generation of modelled block grades peripheral to the mineralisation. A horizontal search was
applied to the regolith and completely oxidised samples to better reflect the impact of surface
generated oxidation.
Page 11
Bekisopa, Resource Estimates, Akora Resources
April 2022
Block model validation consisted of visual inspection of drillhole assays, composites and block
grades in section, statistical comparison of composite values with block grades and grade-tonnage
curves. The results were consistent with expectations with no significant issues noted.
The new Mineral Resources are reported from within the relevant mineral wireframes, inclusive of
any proposed DSO material, using a 15% DTR cut off on a centroid in/out basis. The cut-off grade
was advised by AKO following its analysis of the assay results and is similar to cut-off grades used
for similar types of deposits.
The Mineral Resources are classified as Inferred. The classification of the resource estimates is
derived from the data point distribution (i.e. the drillhole spacing) with due consideration to other
factors like grade continuity (variography), geological understanding and continuity including
surface mapping, drilling/sampling method and recovery, QAQC and density data. The positive
aspects for the resource classification are the geological model, the use of diamond core with >95%
recovery, appropriate sampling, sample prep and analytical techniques with appropriate QAQC.
The negative aspects for the classification are the style of mineralisation (skarn) in conjunction with
the wide drillhole spacing and the relatively poor variography, i.e. the apparent lack of good grade
continuity, the last item of which implies more detailed drilling is required.
The combined Mineral Resource for the three deposits of the Bekisopa Iron Ore project are detailed
below, along with the concentrate grades of the magnetite product (grind size 75 microns).
Inferred
Mt
DTR %
Fe Head %
Density t/m3
DTR Mt
Total
194.7
38.7
31.9
3.22
75.4
Concentrate Grades
Fe %
SiO2 %
Al2O3 %
P%
S%
TiO2 %
LOI %
67.6
1.8
0.6
0.008
0.237
0.18
-2.1
H&SC has assumed the deposits will be extracted by an open pit bulk mining method.
From the geological surveying, drill hole assays and numerous product processing trials there are
three potential products from within and across the Bekisopa prospect. Firstly, the high-grade
outcrop material and the high-grade weathered zones can be selectively mined using conventional
shovel, truck, crush and screening operations to produce lump and fines DSO. Secondly, bulk
mining of the iron mineralisation between 30 to 55% Fe head grade and subjecting the material to
crushing and screening to a 2mm size followed by magnetic separation to produce a +62%Fe fine
product. Thirdly, bulk mining of the iron mineralisation at a nominal +15% Fe head grade using
conventional mining practices and then crush and grind to ~75-microns and apply magnetic
separation techniques to produce an iron concentrate product grading +67% Fe with the possibility
of using higher iron head grades, nominally 25 to 45% Fe, to generate a +69% Fe concentrate feed
product, both suitable for Direct Reduction Iron processes.
Page 12
Bekisopa, Resource Estimates, Akora Resources
April 2022
The Bekisopa project is situated in south central Madagascar within flat to gently undulating remote
and isolated country of semi-arid grassland.
As part of the DTR Mineral Resource there is a higher grade iron component existing at surface
associated with penetrative oxidation via weathering of the magnetite mineralisation (DSO). This
zone was characterised by markedly higher iron grades in the drilling and was logged in the drilling.
A high grade surface was delineated for each of the three deposits, which was used to select and
model a total of 143 2m composites. Grade interpolation was by Ordinary Kriging with the elements
modelled including the head grades for Fe, SiO2, Al2O3, P, S and TiO2. Unfortunately, the LOI dataset
was sufficiently incomplete that insertion of default grades prior to modelling was not considered
appropriate. It is likely thought that the average LOI grade will be positive.
The DSO Mineral Resources are reported for an iron cut-off grade of 45% using a partial percent
volume adjustment for the geologically interpreted high grade mineral domains for the three
deposits.
Inferred
Mt
Fe %
SiO2 %
Al2O3 %
7.8
54.0
11.1
4.4
P%
S%
DTR %
Mt_Fe
Mt_DTR
Density t/m3
0.095 0.024
60.4
4.2
4.7
2.57
Future work should comprise a substantial amount of infill drilling to upgrade the Mineral
Resources, with the initial focus being infill drilling to better define the areas of high-grade DSO to
be selectively mined to maximise both DSO tonnage and grade.
Exploration Potential
Exploration potential for the Bekisopa iron project consists of two components:
1] Exploration potential for magnetite mineralisation exists within the mineral wireframes for the
Central and Northern deposits where there has been insufficient drilling to provide data for
generating interpolated block grades. An Exploration Target has been identified based on the
geological interpretation for both deposits in conjunction with the drilling results, the surface
mapping and the magnetic imagery of:
20 to 40 Mt @ 30 to 45% DTR for a total of 8 to 16Mt of magnetite with a concentrate grade of
66 - 69% Fe, 1-2.5% SiO2, 0.2-1.2% Al2O3, 0.001- 0.01 % P, 0.01-0.2% S & -1.5 to -2.5% LOI
The potential quantity and grade of the Exploration Target referred to above is conceptual in nature,
as there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further
exploration will result in the estimation of a Mineral Resource.
2] The new Mineral Resources plus the above Exploration Targets represent approximately 3km of
strike of a 5km long zone of magnetite mineralisation. This allows for an additional 2km of
exploration potential to exist along strike between the known deposits. An Exploration Target has
been designed based on the already established geological continuity of the mineralisation in
conjunction with the surface mapping and the results of the ground magnetic survey. Two
Page 13
Bekisopa, Resource Estimates, Akora Resources
April 2022
additional magnetite-bearing diamond drillholes located halfway between the Southern and Central
deposits have been included in the assessment of likely grades for the potential mineralisation.
This Exploration Target has been defined as:
30 to 50 Mt @ 20 to 40% DTR for a total of 10 to 20Mt of magnetite with a concentrate g
Share your feedback