Noosa Mining Conference Presentation
Released
Released
Announcement PDF
Bekisopa Drill Hole 53
Northern Area, intercepted
iron downhole to 250m.
AKORA
Resources
23 October 2021
Bekisopa
Project
High Grade
DSO
Iron Ore
ASX: AKO
Investor Presentation
November 2021
Disclaimer
Forward Looking and Competent Person Statement
This corporate presentation contains forward looking statements which constitute “forward looking information” within the meaning of securities legislation and “Forward Looking Statements”.
•
All statements included herein, other than statements of historical fact, are Forward Looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from
those reflected in the Forward Looking Statements. The Forward Looking Statements in this corporate presentation may include, without limitation, statements about the company’s plans for its exploration projects and future exploration,
evaluation and development including drilling activities, quantification of mineral resources, feasibility studies, the construction and development of the Bekisopa Project, the company’s business strategy, plans and outlook; the merit of the
company’s mineral properties; mineral exploration potential, timelines; the future financial or operating performance of the company and cost guidance; expenditures; approvals and other matters.
•
Often, but not always, these Forward Looking Statements can be identified by the use of words such as “estimate”, “estimated”, “potential”, “planned”, “open”, “future”, “assumed”, “projected”, “calculated”, “used”, “detailed”, “has been”, “gain”,
“upgraded”, “expected”, “offset”, “limited”, “contained”,“reflecting”,“containing”,“conduct”,“increasing”,“remaining”,“to be”, “periodically”, or statements that events, “could” or“ should” occur or be achieved and similar expressions, including negative
variations.
•
Forward Looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the company to be materially different from any results, performance or
achievements expressed or implied by the Forward Looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; changes in commodity prices; technological and
operational hazards in mine development activities; risks inherent in mineral exploration; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; construction delays, the timing and availability of
financing; governmental and other approvals; political unrest or instability in countries where IPR is active; labour relations issues; as well as those factors discussed under “Risk Factors” in the Company's Subscription Deed.
•
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward Looking Statements, there may be other factors that cause actions, events or
results to differ from those anticipated, estimated or intended. Forward Looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to estimates of future
exploration success; expectations on economic viability of any mineral resource identified; expectations regarding future construction costs; expected trends in mineral prices and currency exchange rates; that the company’s activities will be in
accordance with the company’s public statements and stated goals; that there will be no material adverse change affecting the company or its properties; that all required approvals will be obtained; that there will be no significant disruptions
affecting operations, including the development and construction of the Bekisopa Project or any other project the Company seeks to advance, and such other assumptions as set out herein.
•
Forward Looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward Looking Statements, whether as a result of new information, future events or results or otherwise, except as required
by law. There can be no assurance that Forward Looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue
reliance on Forward Looking Statements. This corporate presentation also refers to non-IFRS financial measures, such as future guesstimate of cash cost per tonne of processed ore and guesstimates of operating cash flow. These measures do
not have a standardized meaning or method of calculation, even though the descriptions of such measures may be similar.
Competent Person Statement
•
The information in this report that relates to Exploration Targets, Exploration Results, and related scientific and technical information, is based on and fairly represents information compiled by Mr Anthony Truelove. Mr Truelove is a
consulting geologist to Akora Resources Limited (AKO). He is a shareholder in Akora Resources Limited, holding 4,545 shares he purchased in 2011, some 8 years prior to being engaged as a consultant. Mr Truelove is a Member of the
Australasian Institute of Mining and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG). Mr Truelove has sufficient experience which is relevant to the styles of mineralisation and types of deposits
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the matters based on his information in the form and
context in which it appears including sampling, analytical and test data underlying the results
2
AKORA Resources – Madagascan Iron Ore
Flagship Project
Bekisopa
Outcrop – 66.7% iron ore
100% AKORA owned
4 Permits - 93.5 km2
➢ High Grade outcropping iron ore
Future
Projects
➢ High Grade Weathered Zone
➢ 6 km strike
➢ Drilled ~5,650m confirms
Tratramarina
Ambodilafa
significant HG iron at surface,
depth and along strike.
➢ ~250 kms to port of Toliara
Bekisopa
Toliara
Trench 36 – South, HG
weathered iron
3
Ground Magnetic Survey & Geophysical Modelling
Shows a consistent high intensity
magnetic body extending over ~6km
Central traverse Line
Northern traverse line
•
•
• Model shows magnetic bodies; one flat
lying, width ~150m, another west dipping
with depth extent of at least 300m
Models as a simple magnetic body, red ellipsoid,
dipping to the west, depth of at least 500m,
possible thickness of ~150m
Drilling confirms the geophysical modelling,
depth +250m, true thickness ~100m
• Drilling in the Central and Southern
zones confirms the geophysical
modelling, mineralisation appears
continuous, cross section widths
+650m, depths +200m, true
thicknesses ~50m
4
Bekisopa 2020 exploratory drilling
➢ Designed to confirm iron mineralisation at
depth and along strike
➢ Completed 12 drill holes, <100m, for 1095.5m
(black dots)
➢ All intercepted iron mineralization at surface
with several holes ending in mineralisation
Tenement
3757
2.5 by 2.5 kms
Tenement
10430
5 by 5 kms
Bekisopa 2020 High Grade Iron assay results
BEKD11 – 0 to 25m, Ave 61%Fe
BEKD10 – 15.7 to 27.8m, Ave 54%Fe
59%Fe
51%Fe
59%Fe
57%Fe
64%Fe – DSO
63%Fe - DSO
54%Fe
6
Bekisopa 2021 drilling campaign
Tenement
3757
2.5 by 2.5 kms
➢ Designed to add volume to the 2020 drilling intercepts
➢ Completed 51 drill holes, 4700m drilled, ~300m to go
➢ Highlights – iron mineralisation;
➢ ~67%Fe at surface
➢ Depth 250m downhole
➢ Width across strike +650m
➢ True thickness 50 to 100m
➢ Drilled <30% of the 6km strike length looking to be
a significant High Grade ore body
Tenement
10430
5 by 5 kms
3 Types of Iron Mineralisation – at Surface
Weathered Massive Iron Mineralisation
67.8%Fe
68.5%
68.5%
69.3%
Drill Hole 31
South
Surface to 6.2m
VH Grade – 68.2% Iron
67.8%Fe
67.5%
Drill Hole 29
South
Surface to 6.2m
66.9%
VH Grade – 66.8% Iron
68.3%
8
3 Types of Iron Mineralisation – at Depth
Massive Iron Mineralisation
67.7%Fe
66%
Drill Hole 38
Central
Depth – 75.9 to 79.7m
61%
High Grade – 64.2% Iron
62%
Coarse Disseminated Iron Mineralisation
29%Fe
47%
61%
42%
Drill Hole 1
North
Depth - 56.7 to 60.5m
Grade – 44.8% Iron
9
Bekisopa Northern drilling confirms Geophysical Modelling
Significant
continuous
Iron
Mineralisation
from surface
138m Iron intercept - downhole
Iron intercept 115m
Iron to 161m
To
+250m
Depth
- downhole
Iron to 250m
with 138m
Intercepts
downhole
10
Bekisopa Southern Drilling defines an expansive ore body
High-grade surface iron mineralisation
Continuous ~50m true thickness
Cross strike width of +650m
Low stripping ratio for open pit mining
11
Processing Trials - Bekisopa 2020 Drill Core
Composites were crushed to 2mm and Processed using wLIMS – outstanding grades
First Trials, No Optimisation!
Weathered Massive Mineralisation achieved:
Massive and Coarse Disseminated achieved:
67%Fe product grade
63%Fe Avg product grade
Head Grade = 60%Fe, Fe Recovery = 84%, Mass Yield = 75%
Head Grade = 58%Fe, Fe Recovery = 91%, Mass Yield = 79%
Clean VHG fines product
with low
0.04%Phos
2.7% Silica
1.2% Alumina
Clean Metallic
VHG fines product
(averages)
66.9%Fe
66.5%Fe
Outstanding Quality – Very High-grade Fines products
12
Bekisopa’s Drilling Results – Outstanding High Grade Iron Ore
Drilling Results
Process Trials
✓From Surface - 8m at 68%
6m at 67%
Potential
7m at 66%
DSO
15m at 65%
✓At Depth - 25m at 61.4%
30m at 46.2%
38m at 35.7%
138m at ??%
✓Mineralisation depth +250m
Crushed -2mm and wLIMS,
achieved Product Grades
✓Up to 68%Fe
✓67%Fe from Weathered
Massive Iron
✓63%Fe from Massive &
Coarse Disseminated
✓Low impurity levels
Bekisopa
Drilled <30% of the 6km
strike
Proving up a
significant resource
Capable of producing
High-Grade lump and
fines iron ore.
downhole
13
Anticipating 4 Iron Products from Bekisopa
BEKD01
BEKD09
BEKD31
68%Fe
58%Fe
47%Fe
69%
60%
45%
69%
59%
53%
69%
51%
42%
Outcrop
VHG Surface Zone
HG Surface Zone
At Depth
HG DSO
Lump and Fines
DSO
+65%
VHG Fe Fines
+62%
Fe Fines
Lump and Fines
Hematite ~66%, Magnetite ~68%
14
Potential Production Outlook for Bekisopa
68%Fe
69%
69%
Outcrop
69%VHG Surface Weathered Iron
Years 1 and 2
Years 2 to 10
Conventional Mine, Crush and Screen
Produce High-Grade DSO Lump and Fines
DSO operations typically have low mine site Capex and Opex cost
15
AKORA Resources – Corporate (at 30 September 2021)
CORPORATE STRUCTURE
Current AKORA Ordinary Shares on Issue
Unlisted Options (strike price 30c, 13 months to expiry)
Market Capitalisation (@ $0.2 per share)
61,036,722
10,832,016
$12,207,344
Cash (as at 30 September)
$2,521,000
MAJOR SHAREHOLDERS
Evanachan Ltd
Baker Steel Resources Trust
Mackenzie Financial
Directors & Management
12.7%
8.3%
6.2%
5.9%
Top 20 Shareholders
60.7%
AKORA Resources – Board and Management
Michael Stirzaker – Non- Executive Chairman
▪ 30+ years commercial experience; most recently Partner with Pacific
Road Capital, Finance Director-Finders Resources Limited, Joint
Managing Director RFC Group Limited. Extensive experience in the
mining sector as investor, financial adviser and company director
▪ Current board positions include Firestone Diamonds PLC, Prodigy Gold
NL and Base Resources - Madagascan mineral sands development
Paul Bibby – Managing Director
▪ 35+ years experience. 24 years with Rio Tinto including senior roles at
Hamersley Iron and Kaltim Prima Coal Project (Indonesia). Other notable
experience includes Zinifex (General Manager), Nyrstar (Chief
Development Officer), OceanGold (CEO) and as CEO of ASX listed gold
and silver producers
John Madden - Chief Financial Officer
▪ 35+ years experience. 22 years across Rio Tinto Finance and Business
Analysis including Freeport (Irian Jaya), Morobe Consolidation Goldfields,
Indophil Resources NL, Ok Tedi Mining. Founding Director of Akora
Resources
16
Bekisopa drill core BEKD33
Average Grade 66% Iron
Management
VERT Capital
Paul Bibby
Managing Director
paul.bibby@akoravy.com
Petar Tomasevic
Director
petar@vertcapital.com.au
John Madden
Chief Financial Officer
john.madden@akoravy.com
VERT Capital
Level 2, 681 Murray Street
West Perth WA 6005
Harbury Advisors
AKORA Resources
211 McIllwraith Street
Princes Hill
Melbourne, Victoria 3054
ASX: AKO
Matthew Lindh
Director,
mlindh@harbury.com.au
Level 3, 175 Collins Street
Melbourne, Victoria 3000
www.akoravy.com
Share your feedback
Discover