2021 Annual Report
Released
Released
Announcement PDF
Annual
Report
2021
For the year ending 31 December 2021
Inside this
report
Chairman’s Letter
2
Review of Activities
4
Directors’ Report
10
Remuneration Report
16
Auditor’s Independence Declaration
21
Financial Statements
22
Consolidated statement of profit or loss and other
comprehensive income
23
Consolidated statement of financial position
24
Consolidated statement of changes in equity
25
Consolidated statement of cash flows
26
Notes to the financial statements
27
Directors’ Declaration
50
Independent Auditor’s Report
51
ASX Additional Information
56
Corporate Directory
60
Akora Resources Annual Report 2021
1
Chairman’s
Letter
Early drilling success encouraged the Board to
bring forward the 2022 proposed drilling and
increase the 2021 drilling campaign to 5,000
metres and ensure a meaningful Maiden JORC
Resource could be achieved.
2
Akora Resources Annual Report 2021
Chairman's Letter
Dear Shareholder
We are pleased to present the 2021 Annual Report the second
since successfully listing AKORA Resources Limited (ASX:AKO)
in December 2020 on the Australian Securities Exchange.
2021 continued to be a challenging year for all. The
uncertainties and complications due to COVID and the
inability to travel overseas meant that we had to adjust
our planned approaches to ensure completion of activities
outlined in the 2020 AKORA Prospectus. From the successes
and lessons learnt from the initial 12 drill hole exploratory
programme in late 2020 we created a capable local team to
tackle the major 2021 drilling campaign at Bekisopa. Under
direction from AKORA’s Australian management our local
colleagues established the Bekisopa site camp, provided
medical services, delivered geological management,
scheduled the drilling, and provided in-country management
for both operational and Government Relations. Together all
successfully completed the substantial 4,000-meter diamond
drilling campaign.
Early drilling success encouraged the Board to bring forward
the 2022 proposed drilling and increase the 2021 drilling
campaign to 5,000 metres and ensure a meaningful Maiden
JORC Resource could be achieved. This meant that 51 drill
holes were completed in three zones along the 6-kilometer
main strike. The drilling confirmed an extensive iron formation
below the high-grade outcropping iron ore, extending and
open to depths of 300 meters down dip, with high-grade plus
62% iron at surface in numerous holes that are potentially
direct shipped iron ore.
In conjunction with the drilling program processing trials were
performed on drill core samples to understand the potential
products deliverable for Bekisopa. These trials consistently
delivered better than 62% iron benchmark grade fines product
at a 2mm crush size, very encouraging first results. Of note
is the iron mineralisation within the weathered zone that
readily upgraded to a 66.9% premium-grade iron fines after
crushing to 2mm and magnetic separation. These and further
product grade trials at a 2mm crush and magnetic separation
demonstrated how readily the iron mineralisation at Bekisopa
can be upgraded with minimal beneficiation to produce highgrade and potentially high margin products.
Following consultation with the villages AKORA provided
medical support, building materials and farming implements
as requested and undertook the major community project at
Tanamarina of drilling for clean water and providing potable
water across the village. This has been a most welcomed
improvement for the village and was celebrated with fanfare
and an extensive opening party inviting dignitaries from across
the region.
The Bekisopa drilling campaign was completed in late
November 2021, 63 drill holes were logged and samples sent
to ALS Perth Iron Ore Centre for assay. As a result, there is
considerable information, assay and product trials, that should
all come together to produce the Maiden JORC Resource to
be announced in late March 2022.
At 31 December 2021, AKORA had A$1.1 million in cash and
is preparing for a year of further reviewing the significant
Bekisopa iron resource and undertaking product logistics,
mining and processing studies.
Yours sincerely
MH Stirzaker
Non-executive Chairman
The second phase of the drilling program concentrated
on the deeper holes in the Northern and Southern Zones
and delivered intercepts down hole to 250 meters in iron
mineralisation with several significant continuous iron
intercepts of 100 to 155 meters in thickness. The drilling assays
and substantial intercepts should all contribute to defining an
important Maiden JORC Resource for Bekisopa.
In mid-September during the drilling campaign at Bekisopa we
welcomed a visit from the Ministry of Mines Regional Strategy
who also visited the Tanamarina Commune. The five-person
delegation led by The Madame Director commented “we are
satisfied with the Company’s answers and have enjoyed our
visit and stay at the Bekisopa camp. Our report to superiors will
state the Company is serious about its project and a reliable
Company, especially their social contribution to Tanamarina
water programme.”
Akora Resources Annual Report 2021
3
Review of Activities
Review of
Activities
Following exploration success in the final
quarter of 2020, the Group commenced a
planned 4,000 metre drilling campaign in
the second quarter of the year with drilling
proposed for the Northern, Central and
Southern Zones of the Bekisopa project which
was expanded to 5,000 metres.
4
Akora Resources Annual Report 2021
Review of Activities
By early in the third quarter of this year, exploration success
in the Southern Zone resulted in the Group accelerating
its drilling campaign and brought forward around 1,000
metres of drilling scheduled for 2022. The Group was able
to mobilise with its Drilling Contractor a new diamond drilling
rig in the third quarter which had enhanced productivity and
greater depth range and enable savings in mobilisation and
demobilisation of equipment and facilities.
Northern
Zone
DRILLING
The 2021 drilling campaign has built on the excellent
geological modelling, ground magnetic survey and initial
12-hole exploratory drill programme of late 2020 and
confirmed the interpretation of high-grade outcropping lump
magnetite and hematite along the 6-kilometer strike length
with continuing iron mineralisation at depth dipping to the
west in the north and flattening out into the southern zone.
The iron mineralisation intercepts became rather predictable
as drilling continued and showed a strong correlation with the
magnetic anomalies identified through the ground magnetic
survey work. The magnetics data suggests semi-continuous
mineralisation over at least a 6km strike with drilling to date
confirming iron mineralisation along 5kms of this strike length.
In total 63 drill holes have been completed along and across
the main Bekisopa tenement comprising 47 shallow drill holes,
<100m in depth downhole, and 16 deeper holes up to 260
metres in BEKD53 in the North intercepting iron mineralisation
for 105m down to 250m downhole and in the south drill hole
BEKD46 a 163m intercept finishing at 179m downhole to
highlight a few of the significant continuous iron mineralisation
intercepts. Over 2021 there was frequent reporting of drilling
assay results, iron mineralisation characteristics and iron
formation extents, these all came together and since the
completion of 2021 have been reported to the ASX in three
announcements covering the Northern, Central and Southern
Zones along the 6km strike. Following is a summary of all the
drilling findings.
Central
Zone
Southern
Zone
Figure 1. Northern, Central and Southern Zone drill hole
locations
BEKISOPA NORTHERN ZONE
The Bekisopa Northern Zone comprises 13 drill holes, see
Figure 1. Several intercepted high-grade iron of up to 64%Fe
at surface across several holes down to 6.9m downhole
and this is expected to be suitable for DSO at better than
benchmark grade. These iron grades are DSO equivalent,
meaning they only require to be mined, crushed, and screened
to produce benchmark grade 62%Fe, or better, as lump and
fines products and could potentially represent a “quick-start”
operation option. The drilling assays show significant volumes
of readily upgradeable iron mineralisation are present and that
mineralisation continues at plus 300m downdip from surface.
The Northern Zone includes four very deep holes of 138.2m,
220.65m, 174.12m and 260.72m in BEKD50 to 53 respectively,
with an overall average grade of 33.1%Fe, with numerous
mid-intercept grades of 44 to 55%Fe. Within these deep holes
are significant iron intercepts from 67m to 105m, see Figure
2. The drill holes are at a 200m north-south drill spacing and
a 100m east-west drill spacing within an area that extends
over some 600m by 200m and at a maximum depth to some
300m downdip. Iron grades have been shown via test work
on a single hole in the north (BEKD01) to readily upgrade using
magnetic separation to an average of 63%Fe after at -2mm
crush and then to 69.9%Fe after magnetic separation (Davis
Tube Tests) processing at -75µm grind, all encouraging results.
100m
True
Thickness
300m
Down Dip
Figure 2. Northern Zone cross Section 7,612,300N covering
BEKD20, 52 and 53 High-grade ~64%Fe at surface and
continuous iron mineralisation downdip to plus 270m.
Akora Resources Annual Report 2021
5
Review of Activities
DTT performed on BEKD01 from surface to 70.5 metres
downhole, on an average head grade of 43.3%Fe, delivered a
product averaging 69.9%Fe at very low impurity levels of 0.5%
Silica, 0.7% Alumina, 0.003% Phosphorous and 0.06% Sulphur
a premium high grade iron product. This 69.9%Fe product
at 75 microns indicates that Bekisopa could potentially be a
future provider of very clean premium grade iron ore suitable
for Direct Reduced Iron pellet production - the crucial feed
material for the iron and steel industry to decarbonise and
produce Green Steel.
BEKISOPA CENTRAL ZONE
Assay results for the 12 drill holes in the Central Zone within
the Bekisopa project show continuous shallowly dipping iron
mineralisation from surface with four holes ending in iron
mineralization at 100.4m, confirming iron mineralisation is open
at depth and to the west. The Central Zone covers some 1.8
kms north to south and some 300 metres across strike, see
Figure 1 above.
True
Thickness
70m
Figure 3. Central Zone cross section along latitude 7611000
for drill holes BEKD03, 41 and 42. Relatively flat westerly
dipping ore body suggest a low stripping ratio for mining.
Mineralisation is continuous in the northern part of the Central
Zone (~500m strike) and it is considered likely that it will be
continuous all the way to the southern part of the zone based
on the mineralisation intersected on Section 9300N and the
continuous magnetic anomaly between these two areas,
potentially an overall strike length of some 1.8kms, refer Figure
1 above.
Iron mineralisation is between 50 and 70m combined true
width and dips shallowly (30-40°) to the west as shown in
the cross sections 11000N, see Figure 3. Results indicate a
consistent surficial zone where weathering has upgraded
the average grade of the primary mineralisation, with some
areas potentially direct shipping ore (DSO). This zone has
been confirmed to be over 200m wide on Section 10800N
but is variable in width depending on the dip of the primary
mineralisation. Further south within the Central zone the iron
formation is interpreted to have an even flatter - shallower dip,
see Figure 4.
The Central Zone covers a strike of around 1.8kms with what
appears to be an open iron formation from surface across
and along strike and suitable for a low stripping ratio open
pit mining configuration. From the cross-section structures
defined in Figures 4 and 5, there looks to be additional
potential for iron mineralisation at depth and to the west of the
current drilling offering the possibility for considerably higher
resource tonnages.
Figure 4. Central Zone cross section along latitude
7609300 BEKD07 and BEKD08 from 2020 drilling with iron
mineralisation open at surface and potential for further iron
formations at depth and continuing to the west.
BEKISOPA SOUTHERN ZONE
Across the 37 Southern Zone drill holes there are high-grade
near surface assays +64%Fe, clearly indicates the potentially
Direct Ship Ore (DSO) lump and fines, in 13 of the 29 drill holes
that intercepted iron mineralisation at surface with 14.6m @
64.94%Fe in BEKD13, 8.19m @ 68.15%Fe in BEKD31, 5.88m @
63.87%Fe from 0.9 to 6.78m in BEKD44. At depth 7 drill holes
recorded substantial iron intercepts grading +63%Fe with
19.5m @ 63.26%Fe from 68.1m downhole in BEKD46 and 11m
@ 63.96%Fe from 56.8m downhole in BEKD45.
Near surface assay results shows high-grade average iron
grade across numerous drill holes; 68.2%Fe, 66.8%Fe,
65.9%Fe, 65.5%Fe, 65.5%Fe, 64.9%Fe and 62.9%Fe
from surface to 8.2m, 6.2m, 2.2m, 6.9m, 14.7m and 6.8m,
respectively in Southern drill holes BEKD31, 29, 17, 16, 13 and
44, see Figure 1.
6
Akora Resources Annual Report 2021
Review of Activities
Drill holes intercepted iron mineralisation deep downhole in
several Southern drill holes:
•
155.64m continuous iron intercept ending at 172.74m at
an average 37.05%Fe in BEKD46,
•
150.85m continuous iron intercept ending at 173.94m
at an average 33.20%Fe in BEKD59 and
•
146.07m continuous iron intercept ending at 182.47m
at an average 38.42%Fe including 70.41m at 46.14%Fe in
BEKD43, refer Appendix 1, Significant Iron Intercepts.
The Southern Zone comprises 28 shallow drill holes, <100m,
and 9 deep drill holes from 139.6m to 208.8m with the deepest
iron mineralisation intercepted being at 149.6m, 173.9m, 185.4m
and 184.7m downhole in BEKD46, 59, 43 and 61 respectively.
There are substantial true thicknesses in a number of southern
drill holes, several around 50m, then BEKD47 and 57 at
80.5m and 82.3m, respectively, then BEKD59, 43 and 46 at
150.8m, 159.6m and 162.8m, respectively, which should add
considerably to the resource estimate.
Cross sections for drill holes within the Southern Zone and
shown in Figures 5 and 6. The Southern Zone drill holes are
typically spaced at 150m in the north-south direction with a
50m or 100m east-west spacing that extends across an area
of over 850m by 1,000m and at a maximum depth to some
185m downhole. These flat lying east-west iron formations
have true widths varying from around 80m (BEKD45 and
63) to 155m (BEKD58 and 59) and 170m (BEKD46 and 62).
It is our expectation that these drilling results should come
together and provides evidence for significant tonnages of iron
mineralisation in the Southern Zone.
Figure 5. Southern Zone cross Section
7,608,300N covering BEKD17, BEKD46 to 49,
BEKD54 and BEKD61. High-grade ~66%Fe
and ~63%Fe at surface in BEKD17 and 54 and
at depth in BEKD46 19.5m @ 63.3%Fe and
13.3m @ 64.4%Fe and a continuous 162.8m
iron mineralisation intercept of 35.9%Fe in
BEKD46.
Figure 6. Southern Zone cross Section
7,608,000N covering BEKD15 and 16, 44 and
45, 63 and 32 and 33. High-grade at surface of
approximately 64%Fe, 65%Fe, 63%Fe, 62%Fe
and 65%Fe in BEKD15, 16, 44, 32 and 33 and
at depth approximately 64%Fe, 65%Fe and
63%Fe in BEKD45, 32 and 33.
Akora Resources Annual Report 2021
7
Review of Activities
METALLURGICAL TESTWORK
Wet Low Magnetic Separation (wLIMS) and Davis Test Tube
(DTT) process trials were performed on numerous samples
along and across the Bekisopa iron mineralisation from
surface to depth to understand the upgradability of the iron
mineralisation. wLIMS was conducted on drill core crushed to
2mm with 80% passing 1.3mm, while the DTT’s were carried
out on assay pulp samples that had been prepared to 75
microns and showed 80% passing 62 microns, a relatively
coarse sizing for DTT. These trials were conducted on many
samples and have shown very consistent upgradability results
on the strike.
The wLIMS and DTT results from each Zone along the 5
kilometre strike length are summarised in Table 1 (a), (b) and
(c). These all show that the iron mineralisation head grade
at Bekisopa upgrades to better than the 62%Fe Benchmark
grade using wLIMS and to 70%Fe using DTT. These are
outstanding results are demonstrate that the Bekisopa iron
mineralisation can be readily processed to produce high-grade
fines and premium grade products.
NORTHERN
ZONE
HEAD
GRADE
WLIMS
FINES
GRADE
DTT
GRADE
BEKD01
COMPOSITE
COMPOSITE
INTERVAL (M)
FE
%
FE
%
FE
%
1
0 – 8.0
60.6
67.6
69.9
2
8.0 – 13.54
49.6
63.6
69.6
3
13.54 – 20.27
45.1
63.3
69.6
4
20.27 – 26.54
42.5
60.5
69.4
5
26.54 – 32.30
38.9
63.4
70.1
6
32.30 – 37.75
31.4
59.5
70.1
7
37.75 – 43.54
47.5
63.0
69.9
45.1
63.0
69.8
Averages
Table 1 (a). Six composites from Bekisopa drill hole BEKD01
from surface to 43.54m downhole showing the considerable
upgrading from an average head grade of 45.1%Fe to an
average LIMS fines grade of 63%Fe and an average DTT
Grade of 69.8%Fe, with low impurity levels.
CENTRAL
ZONE
BEKD04
COMPOSITE
HEAD
GRADE
WLIMS
FINES
GRADE
DTT
GRADE
FE
%
FE
%
FE
%
COMPOSITE
INTERVAL (M)
1
0 – 5.5
60.1
69.7
70.1
2
5.5 – 11.1
43.9
69.6
70.0
3
11.1 – 19.4
37.4
69.2
69.6
4
19.4 – 25.7
26.4
63.7
71.1
5
25.7 – 31.3
25.5
61.9
70.8
6
31.3 – 38.1
24.2
62.2
69.8
7
37.75 – 43.54
47.5
63.0
69.9
35.1
66.1
70.2
Averages
Table 1 (b). Six composites from Bekisopa drill hole BEKD04
from surface to 38.1m downhole showing the considerable
upgrading from an average head grade of 35.1%Fe to an
average LIMS fines grade of 66.1%Fe and an outstanding
average DTT Grade of 70.2%Fe, with very low impurity
levels.
SOUTHERN
ZONE
BEKD34
COMPOSITE
HEAD
GRADE
WLIMS
FINES
GRADE
DTT
GRADE
FE
%
FE
%
FE
%
COMPOSITE
INTERVAL (M)
1
0 – 4.9
59.4
69.0
68.9
2
4.9 – 10.43
62.1
68.1
69.4
3
10.43 – 14.8
41.1
64.3
69.7
4
14.8 – 18.7
51.0
65.0
70.4
5
18.7 – 23.0
54.1
66.2
69.5
6
23.0 – 29.36
59.2
66.0
70.0
7
29.36 – 34.8
45.6
63.3
68.8
53.2
66.0
69.5
Averages
Table 1 (c). Seven composites from Bekisopa drill hole
BEKD34 from surface to 34.8m downhole showing the
considerable upgrading from an average head grade of
53.2%Fe to an average LIMS fines grade of 66.0%Fe and an
outstanding average DTT Grade of 69.5%Fe, with very low
impurity levels.
The correlation between assay results and the product grade
trials, wLIMS and DTT, looks to be high and reproducible.
Drill holes BEKD01, 04 and 34 from the Northern, Central
and Southern Zones respectively have been tested for the
product grade potential using magnetic separation techniques
of wLIMS, at a 2mm crush, and DTT, at 75 microns, and
expectation is that these results in all reasonable probability
would be reproduced across all Zones on the main Bekisopa
tenement.
The Group achieved outstanding iron concentrate grades at a
relatively coarse 75-micron sizing shows promise for Bekisopa
to be able to deliver Direct Reduced Iron pellet grade to meet
the growing demand from decarbonisation in the iron and
8
Akora Resources Annual Report 2021
Review of Activities
steel industry by the increased production demand for DRI
pellets. Premium grade iron feed, with very low impurity levels,
as seen from BEKD01, 04 and 34 in Table 1 is forecast to be
required to produce DRI pellets from natural gas or green
hydrogen iron making processes. Bekisopa in Madagascar
is well placed to provide these growing markets that have
an abundance of natural gas, for example the Middle East, or
those locations that will be producing green hydrogen.
Notwithstanding the recent Batsirai cyclone that have left
severe and widespread damage throughout Madagascar,
including parts of the Bekisopa project area, the Water Tower
and storage tank were withstood cyclonic winds and rain and
continue to provide fresh water to the Tanamarina village.
Across each Zone, DTT for iron head grades from 15% to
25% shows very clean and high-quality concentrate grades
averaging 68.6%Fe, from an average head grade of 20.4%Fe
at an average DTT mass yield of 20.8%. These are excellent
DTT results at a relatively coarse grind of 75-microns,
achieving a P80 of 62 microns, and if this was a necessary
processing stage for lower grade Bekisopa iron mineralisation
it looks to be capable of clearly delivering a premium highquality DRI concentrate which is the way the Green Steel
Industry looks to be heading as one main way to reduce their
carbon emissions.
HEALTH, SAFETY AND ENVIRONMENT
The Company is also providing financial support communities
severely affected by the Batsirai cyclone.
Drilling activities and various support activities continued
to operate to the highest standards set by the Company
for health, safety and environment. No reportable lost time
incident or environment were recorded during the month.
Since the commencement of exploration and specifically
drilling in October 2000, the Company has recorded only one
LTI. The Company conducted regular tests of all consultants
and contractors for Covid-19.
COMMUNITY INTERACTION
The Company advised shareholders that it had executed a
water drilling agreement with ONG St Gabriel Madagascar, a
not-for-profit organisation affiliated with the Catholic Church,
to establish a permanent source of potable water with primary
community stakeholders.
St Gabriel completed drilling a water bore to a depth of ~80
metres during the quarter then completed the construction a
12-metre-high water tower with capacity to provide storage
capacity of 10,000 litres and the installation of solar panels
(to charge large batteries) to enable water to be pumped
to five central sites through the Commune of Tanamarina,
including the First Aid House. The project was completed for
approximately A$75,000.
A potable water toast to a successful new water tower and
distribution.
Water tower, water storage tank and solar panels for the
water pump.
Mother and baby getting fresh clean water.
Akora Resources Annual Report 2021
9
Directors' Report
Directors’
Report
The directors present their report, together with
the financial statements of AKORA Resources
Limited (formerly Indian Pacific Resources
Limited) (ACN 139 847 555) (hereafter referred
to as the “Company”), for the financial year
ended 31 December 2021.
10
Akora Resources Annual Report 2021
Directors' Report
PRINCIPAL ACTIVITIES
The principal activities of the Company during the financial
year were exploration for iron ore in Madagascar. There was
no significant change in the nature of these activities during
the year.
OPERATING RESULTS, REVIEW OF
OPERATIONS FOR THE YEAR AND
SIGNIFICANT CHANGES IN STATE OF
AFFAIRS
The net loss after tax attributable to shareholders of AKORA
Resources Limited of $1,077,391 for the year ended 31
December 2021 (the net loss after tax for the previous financial
year was A$1,456,540).
DIVIDENDS
No dividends were declared and paid during the year.
EVENTS AFTER BALANCE DATE
Following the end of the financial year a number of subscribers
to the IPO have exercised their options over ordinary shares. As
at the date of this report, subscribers to the IPO have exercised
470,649 exercised since balance date. In total, the Company
has received $141,194 in funds from the exercise of options
since balance date.
On 24 March 2022, the Company released its Maiden JORC
Resource arising from its drilling programme at the Bekisopa
project. The Inferred Resource for the Northern and central
Zones totalled 84.5 Mt at a concentrate grade of 67.6% Fe with
DTR at 39.9%. The Company also announced that it had an
Exploration Target of 50-100Mt at the Southern Zone with a
concentrate grade of 67-69% and DTR at 30-45%.
[Cautionary Statement: The board of directors wish to inform shareholders
that an Exploration Target is conceptual in nature and accordingly, there
has not been sufficient exploration to estimate a Mineral Resource and that
further exploration will result in an estimation of a Mineral Resource.}
On 31 March 2022, the Company request and received
permission from Australian Securities Exchange to enter a
Trading Halt until 4 April 2022 pending an announcement on a
capital raise.
ENVIRONMENTAL ISSUES
The Company’s projects are subject to the laws and
regulations regarding environmental matters in Madagascar.
Many of the activities and operations of the Company cannot
be carried out without prior approval from and compliance with
all relevant authorities. The company conducts its activities in
an environmentally responsible manner and in accordance
with all applicable laws. However, the company could be
subject to liability due to risks inherent to its activities, such as
accidental spills, leakages or other unforeseen circumstances.
ASX LISTING RULES
The Company expended $3,377,804 during the final year
on exploration and evaluation of the Bekisopa project. The
expenditure represents 75% of total expenditure for the year.
The board of directors accelerated 2022 expenditure during
the financial to take advantage of economies of scale following
significant exploration success at Bekisopa PR 10430.
INFORMATION ON DIRECTORS
The following persons were the directors in office during the period 1 January 2021 to 31 December 2021 and since year-end
unless otherwise stated:
MH Stirzaker
Independent Non-executive Chairman
Qualifications
BCom, CA
Experience
Mr Stirzaker was appointed to the board of directors on 22 August 2020.
Mr Stirzaker has over 30 years’ commercial experience, mainly in mining finance and mining
investment. Mr Stirzaker began his career in Sydney as a Chartered Accountant with KMPG before
moving into investment banking with HSBC Group and then Kleinwort Benson in London.
From 1993 to 2007, Mr Stirzaker was part of the natural resource advisory and investment firm, RFC
Group, where he became Joint Managing Director.
From 2010 until 2019, Mr Stirzaker was a partner with the private equity mining fund manager,
Pacific Road Capital.
Interest in shares and
options
100,000 ordinary shares and 50,000 options over ordinary shares in AKORA Resources Limited.
Directorships held in
other listed entities in
last 3 years
Base Resources Ltd since 19 November 2014 and Chairman from 26 November 2021; Firestone
Diamonds plc since 22 July 2019; and Prodigy Gold NL from 3 December 2018 to 1 December 2021.
Akora Resources Annual Report 2021
11
Directors' Report
PG Bibby
Chief Executive Officer and Managing Director
Qualifications
Dip App Sc (Secondary Metallurgy), B App Sc (Metallurgy)
Experience
Mr Bibby was appointed to the board of directors on 9 July 2015 and appointed CEO/Managing
Director on 1 January 2020.
Mr Bibby is a metallurgist with over 35 years’ experience in both mining and metals industries. Mr
Bibby worked for 23 years with Rio Tinto Limited (formerly CRA Limited) in various operational,
technological, and business development roles.
With Rio Tinto, Mr Bibby held various operational roles at Rio Tinto Aluminium (formerly Comalco),
Kaltim Prima Coal and Rio Tinto Iron Ore (Hamersley Iron). At Trio Tinto Iron Ore, Mr Bibby was
manager of metallurgy at both Dampier and Paraburdoo.
Mr Bibby joined Zinifex Limited in 2004 as General Manager-Technology and then played a leading
role in the merging of Umicore and Zinifex smelting businesses to form Nyrstar and became Chief
Development Officer based in London.
On returning to Australia, Mr Bibby was appointed Managing Director of OceanaGold Corporation
and following OceanaGold, Mr Bibby performed various consulting roles.
Interest in shares and
options
1,586,278 ordinary shares directly and 185,682 ordinary shares indirectly and 50,000 options over
ordinary shares in the Company.
Directorships held in
other listed entities in
last 3 years
No other directorships in the past three years.
JM Madden
Executive Director and Company Secretary
Qualifications
BCom (Melb) FCPA FGIA FTIA
Experience
Mr Madden was appointed to the board of directors on 6 October 2009 and is the founder of the
Company.
Mr Madden has over 30 years’ experience in the mining industry. Mr Madden joined Rio Tinto
(formerly CRA Limited) from the University of Melbourne in 1981 and held several corporate
positions including accounting, planning, business analysis, strategy and acquisition and taxation.
Between 1996 and 2000, Mr Madden was Manager-Finance for the Rio Tinto/Freeport Joint
Venture in West Papua.
From 2001 to 2003, Mr Madden was General Manager-Commercial Morobe Consolidated
Goldfields Limited (Morobe controlled the Hidden Valley and Wafi projects) in Papua New Guinea.
On his return to Australia, Mr Madden was General Manager-Commercial, Indophil Resources NL
where he was responsible for all accounting, business analysis, corporate secretarial, legal and
taxation functions in Australia and the Philippines.
Since 2007, Mr Madden has provided consulting services to various mining projects in Africa, Asia,
and Australia for entities such as Australian Premium Iron Ore JV, Intrepid Mines Limited, Mesa
Minerals Limited, and Ok Tedi Mining Limited.
Mr Madden negotiated the acquisition of the exploration projects held by the Company and
managed the Company since its incorporation.
12
Interest in shares and
options
662,344 ordinary shares directly and 814,682 ordinary shares indirectly in AKORA Resources
Limited.
Directorships held in
other listed entities in
last 3 years
No other directorships in the past three years.
Akora Resources Annual Report 2021
Directors' Report
MEETINGS OF DIRECTORS
During the financial year, the board of directors held 11 meetings (including committee meetings of directors) with the remainder of
meetings conducted by way of written resolution. Attendances by each director during the year were as follows:
COMMITTEE MEETINGS
DIRECTORS
MEETINGS
DIRECTORS
AUDIT AND RISK
MANAGEMENT
COMMITTEE
REMUNERATION
COMMITTEE
MEETINGS
NO.
ATTENDED
NO.
AT
Share your feedback
Discover