www.akoravy.com
AKORA is developing a highgrade Direct Shipping Ore
(DSO) iron ore mine in
Madagascar.
Highlights
This will be further developed
into serving the steel industry’s
accelerating focus on reducing
carbon dioxide (greenhouse
gas) emissions through
decarbonisation.
• Average Life of Mine (LOM) high-grade Lump
product grade at 62% Iron (Fe) and a Fines
product grade at 61%Fe over an initial six-year
mine life.
• Bekisopa high-grade iron ore project Pre
Feasibility Study (PFS) confirms a robust initial
Stage 1 2Mtpa DSO Operation.
• The Mine Plan iron ore product split delivers
40% Lump and 60% Fines products over the
LOM.
• Start-up capital of US$60.6 million with a capital
payback of 1.8 years.
• The Operation delivers revenues of US$789M
(A$1.25B), a low C1 cash cost of US$42/t, and
pre-tax cash flow of US$310M (A$0.5B).
• Robust financials with NPV10 of US$147M pretax (A$233M) and an impressive IRR of 86%.
• The Bekisopa Maiden Ore Reserve statement
confirms 9.1Mt of iron ore and a low strip ratio of
0.52.
For the quarter ended 31 March 2025
2
Bekisopa Iron Ore Project
Ownership 100% | Madagascar, Africa
AKORA is advancing plans at its flagship Bekisopa high-grade iron ore project to produce up to
2 million tonnes per annum (Mtpa) of a 61.6% Iron (Fe) average grade direct shipping ore (DSO)
for export to Blast Furnace-Basic Oxygen Furnace (BF-BOF) steelmakers. Bekisopa’s high-grade
iron ore may also be upgraded to a +68% Fe concentrate at 75 microns for shipping to Direct
Reduced Iron-Electric Arc Furnace (DRI-EAF) steelmakers to make greener steel without the need
to use coal and consequently generate considerably less carbon emissions.
AKORA Resources ended the quarter by releasing a Pre-Feasibility Study (PFS) for Bekisopa which
confirmed its planned Stage One Direct Shipping Ore (DSO) operation could produce 2 million tonnes
per annum (Mtpa) of blended grade lump and fines iron ore products at a 61.6%Fe average for blast
furnace steelmakers1.
Strong PFS Financial metrics
Completed by Wardell Armstrong International (now a part of the global SLR Consulting group), the PFS
enhanced the Scoping Study completed by the Company in November 2023 and confirmed that the
Bekisopa DSO operation is economically viable with strong financial, operational, environment, and
product credentials. At a sale price of US$100/t for Benchmark grade 62% iron ore, the project has a
pre-tax Net Present Value 10 (NPV10) of US$147M with an Internal Rate of Return (IRR) of 86% from an
initial capital cost of US$60.6M (including 15% contingency), with C1 cash costs of US$42/t, and pre-tax
capital payback in 1.8 years from first production. Over the life of mine, the project delivers pre-tax cash
flow of US$310M from revenues of US$789M.
Figure 1. Key PFS metrics for Bekisopa’s Stage 1 DSO operation.
1 Refer ASX release dated 31 March 2025 Bekisopa high-grade iron ore project PFS confirms a robust 2Mtpa DSO Operation
with an 86% IRR.
For the quarter ended 31 March 2025
3
Staged Development
The significant scale and particular mineralisation characteristics of Bekisopa’s iron ore resource
presents the Company with a staged development program:
1. Stage 1: Produce a high-grade ~61.6% Fe grade direct shipping ore (DSO): Mine, crush and
screen the at-surface ‘weathered zone’ iron ore to produce a LOM average blended grade of 61.6%Fe
across the lump and fines products for shipping to Blast Furnace-Basic Oxygen Furnace (BF-BOF)
steelmakers via a port at Toliara. A Fines product could be delivered at an average LOM grade of 61.4%
Fe and a Lump product at an average LOM grade of 61.8% Fe.
2. Stage 2: Produce +67% Fe grade Direct Reduced iron concentrate: Using cash generated from
the DSO start-up production, it is considered that the next stage could be mining the underlying fresh
mineralisation and adding grinding and magnetic separation circuits to upgrade ore to a +67% Fe low
impurity concentrate at 75 microns in size for shipping to Direct Reduced Iron-Electric Arc Furnace
(DRIEAF) steelmakers via a port of Toliara. The DRI-EAF process is used to manufacture greener steel
with considerably less carbon emissions due to not needing to burn coal.
The PFS focused on a minimum capital “Low CAPEX Approach” for the Stage 1 DSO open pit mining
operation and considers using contract mining and mobile processing equipment (crushing, screen, and
with magnetic separation after Year 3), and contract truck hauling of the product to port, as well as
operating barges and a floating crane at the existing Toliara port.
Figure 2. AKORA’S flagship Bekisopa Project in south central Madagascar is one of four iron ore
projects in the Company’s portfolio.
For the quarter ended 31 March 2025
4
Figure 3. Bekisopa’s DSO resource has the potential to produce a Lump product at an average 61.8%
Fe grade (left) and a Fines product at an average 61.4% Fe (right), over the PFS LOM.
The PFS, which considered multiple activities including site and community data collection, technical
studies, road and port infrastructure surveys and iron ore-product quality assessments, has improved the
project’s scope definition and refined the capital and operational costs. The iron ore mineral resource
definition has improved over 2024, enabling iterations of the mine plan and early optimisation of the
processing operations to deliver both lump and fines iron ore products.
Extensive discussions with contractors for mining, processing, road construction, road haulage, port
engineering and ship loading, have informed the physical and financial evaluations of the PFS.
Mine Planning
Mining for the Bekisopa DSO will be simple shallow open pit excavation using shovel and truck
techniques and no drill and blasting. The DSO mining zone is moderately to extremely weathered and
lies typically from surface to 20m with maximum depths of 30m.
The mining works will be conducted under contract. The mine schedule has an initial life of mine of six
years using JORC probable reserves, with mining rates ramping up to a maximum of 2.5Mtpa ore in the
fourth year, achieving a design capacity 2Mtpa DSO product. A total of 9.1Mt of ore and 4.7 Mt of waste
is scheduled in this initial Stage 1 PFS mine plan.
This start-up case has a production schedule ramping up from 0.7Mtpa to 2Mtpa over three years, one
year faster than the Scoping Study. This timeframe is allowed is to ensure that management and
employees are progressively and appropriately trained to reliably mine and process product of consistent
quality, safely drive haul and road transport trucks, manage capital and operational scale-up risks and
achieve improved project reliability and economics.
For the quarter ended 31 March 2025
5
Logistics
The iron ore products from Bekisopa will be transported by on-road haul trucks via Satrokala to the
National Highway, RN7, and then on to the coastal town of Toliara (See Figure 4 below). The haul trucks
will be operated by a contract transport operator using on-road 40 tonne trucks. The route from Bekisopa
Mine Site to Toliara is 420km.
The road survey works completed as a key activity for the PFS has identified a suitable haul road
pathway of new and existing roads from the Bekisopa Mine Site to the Port of Toliara. The road route
consists of 25km of new roads from the mine site to the Zomandoa River crossing, followed by 80km of
existing road to be upgraded to the township of Satrokala. Then a further 25km of existing roadway
requires some upgrading which then connects with National Highway RN7.
Figure 4. Road infrastructure from Bekisopa project to Toliara port.
For the quarter ended 31 March 2025
6
Road development works will be staged to minimise capital expenditure and facilitate the production
ramp up profile of the first three years of operation. Road construction will provide for the transport of
mine product during the dry season. New road developments will be managed under a Public/Private
partnership structure with AKORA designing and constructing the roads.
On arrival into the Toliara township, the haul trucks will utilise the Toliara Port bypass road to access the
Port region. This public road, financed by the World Bank, has been under construction over the last 12
months and scheduled for completion mid-2026.
Project of State Significance
Bekisopa has been identified as a Government Project of Significance which has the support of the
National Government2. The local communities at Tanamarina and Bekisopa are also supportive of the
Company and its plans for an iron ore operation, viewing it as a significant opportunity for investment
into the local communities and providing education, health, training and employment opportunities.
People from these local villages have been given employment opportunities and have supported the
company through the PFS process.
AKORA is working with the Madagascan Government’s Mining Ministry to confirm the pathway to Final
Investment Decision and into operation and first shipment is currently anticipated in the second half of
2027. Discussions have commenced with several key Ministries to develop an understanding of the
Bekisopa Project requirements and agree engagement protocols for the development of the project.
AKORA will work with the Mines Ministry and Madagascar Mining Cadastre Office (BCMM) to transform
the existing Bekisopa tenements into ‘Exploitation / Mining Permits’ by the end of 2025, enabling
construction planning to commence.
Mineral Resource
The PFS is based on the Bekisopa DSO Mineral Resource Estimate (MRE) detailed in Table 3 on page
14 below. The Indicated JORC Resource used in the PFS totals 8.7Mt and can be summarised as3:
•
6.6 Mt at 59.7% Fe Enriched DSO,
•
1.8Mt at 39.9% Fe Intermediate A, and
•
0.3 Mt at 33.7% Fe Intermediate B.
A cutoff grade of 58% Fe has been used for the enriched DSO in the southern and northern resource
zones, and 50% Fe for the central zone. The small amounts of Intermediate A and B mineralisation that
sit adjacent to the enriched DSO have a cutoff grade of 35% Fe and 30% Fe respectively.
Reference throughout the PFS is also made to the Bekisopa fresh ore zone. This refers to the previously
announced Bekisopa MRE of 194.7 million tonnes at 32% Fe Inferred Resource, prepared by H&S
Consultants Pty Ltd, which encompasses the underlying fresh mineralisation and is typically referred to
as Stage 24, for the future production of a very low impurity +67% Fe DRI concentrate.
Ore Reserve
AKORA released its maiden Ore Reserve for the Bekisopa DSO operation with the completion of the
PFS Report, under the guidelines of the JORC Code (2012).
2 Refer ASX release dated 8 October 2024 Mines Minister supports Bekisopa Project
3 Refer MRE report released on the ASX on 25 February 2025 35% Increase in Bekisopa MRE Total Iron Ore Tonnes.
4 Refer MRE report supporting the 194.7 Mt Inferred Resource released on the ASX on 11 April 2022.
For the quarter ended 31 March 2025
7
The life of mine production schedule at Bekisopa is focussed on mining the 9.1Mt of Probable Ore
Reserves.
WAI carried out a PFS level mining study to define an Ore Reserve estimate and production schedule for
the Bekisopa Project, incorporated into the PFS. Open pit optimisation and detailed pit design has been
used to delineate the Ore Reserve estimate, mining strategy and production schedule for the project,
which feeds into a project economic assessment to determine the optimal extraction methodology.
A summary of the Ore Reserve is shown in Table 2 in the Mineral Resources and Ore Reserves
Statement on page 13. All material included as ore has a geological confidence classification of
Indicated. This table includes Enriched DSO, and Intermediate A and B ore. Ore Reserves are reported
at a Probable level of confidence, and there is no reported Proved Ore Reserves as there are no
Measured Mineral Resources currently defined.
Growth potential
The mineral resource at Bekisopa has progressively increased over the five drilling campaigns since the
company listed in 2020. These 221 shallow drill holes define the surface weathered zone DSO at
Bekisopa and cover only 2.6km of the known 6km Bekisopa iron mineralisation strike. Thus, the potential
to add future DSO tonnes exists with further drilling along and across the remaining 3.2km of strike.
For the quarter ended 31 March 2025
8
Satrokala Project
Ownership 100% | Madagascar
AKORA’s Satrokala Iron Ore Project has emerged as a significant prospect after a recent
magnetic survey5 identified a major anomaly up to 10km long and 2km wide, making it some 66%
larger than the Company’s more advanced Bekisopa Iron Ore Project.
In 2024, a maiden drilling program targeting the magnetic anomaly was completed at Satrokala, which
returned substantial intersections of low-grade iron mineralisation across all five holes of the sighter
exploratory drilling program over 500m.
No activities were completed at Satrokala during the quarter while the Company focused on delivering
the PFS for its flagship Bekisopa Project.
Figure 5. Satrokala drill plan and the associated ground magnetic survey results.
5 Refer ASX Release dated 20 March 2024 – Satrokala Magnetic Survey Results
For the quarter ended 31 March 2025
9
Corporate
Cash Position
AKORA Resources Limited held cash reserves at the end of quarter of approximately $0.79 million.
Shareholder Information
As at 31 March 2025, the Company had 660 shareholders and 136,582,761 ordinary fully paid shares on
issue with the top 20 shareholders holding 60.76% of the total issued capital.
Share Placement
During the quarter, the company completed a placement to existing and new wholesale investors raising
$1,118,000 (offer price of $0.10 (10 cents) per share) to expedite key Pre-Feasibility Study initiatives.
The proceeds of the Placement will enable activities focused on continuing discussions with Strategic
Partner/s for the Bekisopa project, progressing critical key activities related to refining logistics
arrangements, including completing the mandatory environmental and social impact assessments for the
road haulage route and the port, and for working capital, all with the aim of unlocking the full value of
AKORA and its high-grade iron ore projects.
Minister of Mines in Madagascar confirms Support for AKORA and the Bekisopa Iron Ore Project
In January, the Malagasy Mines Minister confirmed that the Implementation Procedures for the revised
Mining Code had been officially decreed and enacted. Implementation Procedures will be the reference
for the Mines Ministry and the Bureau du Cadastre Minier de Madagascar for the current tenement
renewals process.
ASX Additional Information
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter was
$354,747. Full details of exploration activity during the quarter are set out in this report.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and development
activities during the quarter.
ASX Listing Rule 5.3.5: Payment to related parties of the Company during the quarter was $86,443 in
cash. A description of and explanation for payments to related parties and their associates per Section
6.1 of the Appendix 5B following this Quarterly Activities Report is set out in the table below:
Director Remuneration
Current Quarter
Managing Director fees
41,666
Non-Executive Director fees
35,000
Superannuation
9,777
Total
86,443
For the quarter ended 31 March 2025
10
Board and Senior Management
Graeme Hunt
Paul Bibby
Matthew Gill
Shane Turner
Jason Whittle
Non-executive Chairman
Managing Director & Chief Executive Officer
Non-executive Director
Chief Financial Officer & Company Secretary
General Manager - Development
ASX Announcements during the quarter
The following material announcements were lodged on the ASX Market Announcements Platform during
the quarter:
Date
Description
31 January 2025
31 January 2025
4 February 2025
5 February 2025
25 February 2025
5 March 2025
31 March 2025
Trading Halt
31 December 2024 Quarterly Activities & Cashflow Report
Placement to continue Strategic Investor process post PFS
Bekisopa PFS Update – Testwork suggest increased saleable ore
35% increase in Bekisopa MRE Total Iron Ore Tonnes
Response to ASX Cleansing Notice Timing Letter
Bekisopa Iron Ore Project Pre-Feasibility Study
These announcements are available for viewing on the Company’s website www.AKORAvy.com.
Other details
Head Office
12 Anderson Street West
Ballarat Vic 3350
Phone: +61 419 449 833
Website: www.AKORAvy.com
This announcement is authorised by the Board.
For further information contact:
Paul Bibby
Managing Director
AKORA Resources
+ 61 (0) 419 449 833
paul.bibby@AKORAvy.com
Gareth Quinn
Investor Relations
Republic IR
+ 61 (0) 417 711 108
gareth@republicir.com.au
For the quarter ended 31 March 2025
11
Competent Persons’ Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist
(Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific Professions (SACNASP).
Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and the activity being undertaken to qualify as a Competent Person as
defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the
2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the information in this release in the
form and context in which it appears.
The information in this statement that relates to metallurgical test work is based on information compiled
by Mr James Turner – BSc (Hons), MSc, ACSM, MCSM, CEng, MIMMM, and is a full-time employee of
Wardell Armstrong International. Mr. Turner is a registered Chartered Engineer and Member of the Institute
of Materials, Minerals and Mining (MIMMM). Mr Turner has sufficient experience which is relevant to the
style of mineralisation and metallurgical test work under consideration and the activity being undertaken
to qualify as a Competent Person as defined in the Note for Mining Oil & Gas Companies, June 2009, of
the London Stock Exchange and the 2012 Edition of the ‘Australian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Turner consents to the inclusion of the
information in this release in the form and context in which it appears.
The data in this report that relates to Mineral Resource Estimates and Exploration Targets for the
Bekisopa deposits is based on information evaluated by Mr Simon Tear who is a Member of The
Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant
to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Tear
is a Director of H&S Consultants Pty Ltd and he consents to the inclusion in the report of the Mineral
Resource in the form and context in which they appear.
The Company confirms that it is not aware of any new information or data that materially affects the
above and that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed.
The Company confirms that all material assumptions underpinning the PFS 2Mt per annum production
target continue to apply and have not materially changed.
For the quarter ended 31 March 2025
12
Tenement Interests
As at 31 March 2025, the Company had interests in the following tenements (as required by Listing Rule
5.3.3). There were no changes in the Company’s interests in tenements during the quarter.
Project
Location
Tenement
Number
Blocks
Bekisopa PR
Madagascar, Africa
10430
64
100%
Bekisopa PR
Madagascar, Africa
27211
128
100%
Bekisopa PR
Madagascar, Africa
35827
32
100%
Bekisopa PRE
Madagascar, Africa
3757
16
100%
Samelahy PR
Madagascar, Africa
6595
98
100%
Samelahy PR
Madagascar, Africa
13011
33
100%
Samelahy PR
Madagascar, Africa
21910
3
100%
Tratramarina East PR
Madagascar, Africa
16635
144
100%
Tratramarina East PR
Madagascar, Africa
16637
48
100%
Tratramarina East PR
Madagascar, Africa
17245
160
100%
Tratramarina West PRE
Madagascar, Africa
18379
16
100%
Tratramarina West PRE
Madagascar, Africa
18891
48
100%
Current Interest
For the quarter ended 31 March 2025
13
Mineral Resources and Ore Reserves
Table 1. Bekisopa Mineral Resource Estimate (Inferred Resource) as at 31 December 2024
Mineral Resource Estimate (Inferred Resource)
Location
Inferred Resource
Concentrate
Davis Tube
South
Tonnes
(Mt)
110.2
Head Grade
(Fe%)
32.0
Tonnes
(Mt)
42.0
Grade
(Fe%)
67.6
Recovery
%
37.8
Central
41.2
30.0
15.0
67.0
36.3
North
43.3
33.3
19.0
68.2
43.3
Total (Inferred)
194.7
32.0
75.4
67.6
38.7
Table 2. Bekisopa 2025 Ore Reserve Estimate
Ore Reserve Summary
Classification
Area
Ore
(Kilotonnes, Kt)
Fe
(%)
Waste Tonnes
(Kt)
Strip ratio
(W/O)
Probable
South
7,493
54.1
2,979
0.40
Probable
Central
1.231
45.0
1,202
0.98
Probable
North
344
58.2
525
1.53
Probable
Total
9,068
53.0
4,706
0.52
Notes:
1. The effective date of the Ore Reserve estimate is 07 February 2025.
2. The Ore Reserves estimate is reported in accordance with the guidelines of the JORC Code (2012).
3. Variable cut-off grades have been applied to meet product requirements, of Enriched >60% Fe, Intermediate A 40-60% Fe,
and Intermediate B 30-40% Fe.
4. The Ore Reserve estimate is based on optimisation parameters including a selling price of $110/t for 62% Fe concentrate and
takes into account Modifying Factors related to mine design, geotechnical parameters, mining and processing costs, processing
recoveries, G&A, ESG and royalty costs. Mining dilution varies by domain between 1-3% based on diggability and rippability
considerations. Mining recovery varies between 97-99% by domain.
5. Quantities are in dry metric tonnes as transported to the ROM. Figures have been rounded to an appropriate level of
precision. Due to rounding some totals may not compute exactly as shown.
For the quarter ended 31 March 2025
14
Table 3. Bekisopa MRE Direct Shipping Ore Zone
Mineral Resource Estimate for the Bekisopa Project
Free Digging and Rippable Mineral Resources, 7 February, 2025
Tonnes (Kt)
Density (t/m3)
Fe (%)
SiO2 (%)
Al2O3 (%)
P (%)
Indicated
5,724
3.39
60.3
6.1
3.6
0.10
Inferred
902
2.99
55.9
7.7
4.7
0.10
Indicated
1,231
2.38
40.5
23.1
8.2
0.10
Inferred
105
2.33
40.1
23.6
7.4
0.07
Indicated
260
2.54
34.3
29.3
4.9
0.15
Inferred
765
3.41
39.0
24.7
4.6
0.13
Indicated
560
3.19
54.9
11.1
6.1
0.06
Inferred
15
3.07
53.5
12.0
6.4
0.06
Indicated
605
2.65
38.7
23.7
7.4
0.11
Inferred
42
2.65
38.9
23.1
7.6
0.11
Indicated
59
2.75
31.2
2.7
4.2
0.18
Inferred
187
3.2
38.1
17.6
2.6
0.12
Indicated
349
3.11
58.5
7.5
5.46
0.09
Inferred
955
3.49
52.6
11.3
3.4
0.21
Indicated
-
-
-
-
-
-
Inferred
111
2.52
39.3
23.2
5.9
0.13
Classification
Bekisopa South
Enriched DSO
Intermediate A
Intermediate B
Bekisopa Central
Enriched DSO
Intermediate A
Intermediate B
Bekisopa North
Enriched DSO
Intermediate A
Intermediate B
Indicated
Inferred
-
-
-
-
-
-
748
2.71
32.8
23.6
3.7
0.16
Tonnes (Kt)
Density (t/m3)
Fe (%)
SiO2 (%)
Al2O3 (%)
P (%)
Indicated
6,633
3.36
59.7
6.6
3.9
0.10
Inferred
1,872
3.22
54.2
9.6
4.0
0.16
Indicated
1,836
2.46
39.9
23.3
7.9
0.10
Inferred
258
2.46
39.5
23.3
6.8
0.10
Indicated
319
2.57
33.7
29.0
4.7
0.16
Inferred
1700
3.04
36.2
23.4
4.0
0.15
Bekisopa Total
Classification
Enriched DSO
Intermediate A
Intermediate B
For the quarter ended 31 March 2025
Notes
1.
Mineral Resources are limited by an optimised open pit shell based on appropriate technical and economic parameters.
2.
Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a Pre-Feasibility Study or
3.
Feasibility Study.
4.
Mineral Resources are reported inclusive of any Ore Reserves.
5.
Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by Richard Ellis, an
6.
independent Competent Person as defined by JORC.
7.
The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title, taxation, sociopolitical,
marketing or any other relevant issues.
8.
All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due to rounding.
15
For the quarter ended 31 March 2025
16
Company Profile
Iron ore for tomorrow’s steel making
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development of four iron ore
projects in Madagascar.
The Company’s flagship Bekisopa high-grade Iron Ore Project has a 194.7 million tonne (Mt) Inferred JORC
Resource (ASX Announcement 11 April 2022) with very low impurities able to produce a premium-priced +68% Fe
concentrate. Direct Reduced Iron-Electric Arc Furnace technology which is used to make greener steel without coal
and considerably less carbon emissions requires iron ore grades of at least 67%.
(ASX Announcement – Bekisopa Scoping Study, 14 November 2023)
To generate cash in the near-term, AKORA is advancing plans at Bekisopa for a Stage1, 2Mt per annum Mine with
an initial six year life of mine, producing high-grade 61.6% Fe average grade lump and fine direct shipping ore
(DSO) for shipping to Blast Furnace steelmakers.
(ASX Announcement - Bekisopa Pre Feasibility Study, 31 March 2025)
The Company confirms that it is not aware of any new information or data that materially affects the above and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
And further the Company confirms that all material assumptions underpinning the 2Mt per annum production target continue to apply and have
not materially changed.
For the quarter ended 31 March 2025
17
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AKORA Resources Limited
ABN
Quarter ended (“current quarter”)
90 139 847 555
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
1.2
Receipts from customers
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
Dividends received (see note 3)
Interest received
Interest and other costs of finance paid
Income taxes paid
Government grants and tax incentives
Other
(Cash Boost from Commonwealth
Government)
Net cash from / (used in) operating
activities
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f) other non-current assets
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
Cash flows from loans to other entities
Dividends received (see note 3)
2.2
2.3
2.4
Year to date
(3-months)
$A’000
-
-
(86)
(352)
(86)
(352)
2
2
(436)
(436)
(490)
(490)
For the quarter ended 31 March 2025
Consolidated statement of cash flows
2.5
2.6
Other
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
Proceeds from issue of convertible debt
securities
Proceeds from exercise of options
Transaction costs related to issues of equity
securities or convertible debt securities
Proceeds from borrowings
Repayment of borrowings
Transaction costs related to loans and
borrowings
Dividends paid
Other (provide details if material)
Net cash from / (used in) financing
activities
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
Net cash from / (used in) operating
activities (item 1.9 above)
Net cash from / (used in) investing activities
(item 2.6 above)
Net cash from / (used in) financing activities
(item 3.10 above)
Effect of movement in exchange rates on
cash held
Cash and cash equivalents at end of
period
4.2
4.3
4.4
4.5
4.6
5.
Reconciliation of cash and cash
equivalents
18
Current quarter
$A’000
Year to date
(3-months)
$A’000
(490)
(490)
1,118
1,118
(52)
(52)
1,066
1,066
649
649
(436)
(436)
(490)
(490)
1,066
1,066
789
789
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in
the consolidated statement of cash
flows) to the related items in the
accounts
5.1
5.2
5.3
5.4
5.5
Bank balances
Call deposits
Bank overdrafts
Other US dollar accounts
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
7
777
1
643
5
789
5
649
For the quarter ended 31 March 2025
19
6.
Payments to related parties of the entity and their
associates
6.1
6.2
Current quarter
$A'000
Aggre
Share your feedback
Discover