Annual Report to shareholders
Released
Released
Announcement PDF
ANNUAL
REPORT
2024
For the year ended 31 December 2024
AKORA Resources Limited
ACN 139 847 555
ASX: AKO
1
Akora Resources Limited Annual Report for the year ending 31 December 2024
Contents
03
04
06
14
Corporate
Directory
Chairman’s and
Managing
Director’s Letter
Review of
Operations
Corporate
16
17
18
29
Competent
Persons’
Statement
Mineral Resources
and Ore Reserves
Directors’ Report
Remuneration
Report
35
36
37
38
Auditor’s
Independence
Declaration
Consolidated
Financial
Statements
Consolidated
Statement of Profit
or Loss and other
Comprehensive
Income
Consolidated
Statement of
Financial Position
39
40
41
68
Consolidated
Statement of
Changes in Equity
Consolidated
Statement of Cash
Flows
Notes to the
Consolidated
Financial Statements
Consolidated
Entity Disclosure
Statement
69
70
75
Directors’
Declaration
Independent
Auditor’s Report
ASX Information
2
Akora Resources Limited Annual Report for the year ending 31 December 2024
AKORA is developing high-grade, high purity iron
ore projects in Madagascar to serve the global
steel industry’s accelerating decarbonisation.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7
million tonne Inferred JORC Resource with very low impurities
able to produce a premium-priced +68% iron concentrate ideal
for green steel manufacturing processes.
Corporate Directory
Directors
Stock Exchange Listing
Graeme Hunt – Non-Executive Chairman
Australian Securities Exchange Limited
ASX Code: AKO
(appointed 1 February 2024)
Mike Stirzaker – Non-Executive Chairman
(resigned 1 February 2024)
Australian Company Number
Paul Bibby – Managing Director
139 847 555
Matthew Gill – Non-Executive Director
Solicitor
Company Secretary
Shane Turner
CBW Partners
Level 1, 159 Dorcas Street
South Melbourne Victoria 3205
Head Office and Registered Office
Corporate Advisors
12 Anderson Street West, Ballarat
Victoria, Australia 3350
Harbury Advisors Pty Ltd
Level 5, 157 Collins Street
Melbourne Victoria 3000
PO Box 28 Ballarat
Victoria, Australia 3353
Phone +61 (3) 9381 0859
PAC Partners Securities Pty Ltd
Level 29, 360 Collins Street
Melbourne Victoria Australia
Website
Auditor
www.akoravy.com
Hall Chadwick WA Audit Pty Ltd
283 Rokeby Rd
Subiaco Western Australia, 6008
ABN 33 121 222 802
hallchadwick.com.au
Share Registry
Link Market Services
Tower 4, 727 Collins Street
Melbourne Victoria Australia 6000
Phone 1300 554 474
3
3
Akora Resources Limited Annual Report for the year ending 31 December 2024
Chairman’s and Managing Director’s Letter
Dear Shareholders,
2024 represented another solid year of progress for AKORA Resources as the
Company looks forward to the imminent delivery of a Pre-Feasibility Study (PFS)
and a new Mineral Resource Estimate (MRE) for its flagship Bekisopa Iron Ore
Project in Madagascar.
The upcoming PFS follows an updated Scoping Study released in November 2023 which attracted the
attention of potential strategic investors around the world after it confirmed our proposed Stage 1 Direct
Shipping Ore (DSO) operation at Bekisopa could produce up to 2 million tonnes per annum (Mtpa) of a
high-purity +60% Fe average grade lump and fines product for blast furnace steelmakers. The Study
showed the operation had a low capital entry case of US$55M and would generate a pre-tax cash flow of
US$270 million over an initial five year mine life.
The proposed DSO start-up operation sources a 4.4 million tonne (Mt) Indicated JORC-compliant DSO
resource grading at 60.9% Fe contained in Bekisopa’s southern zone close to surface.
We’re confident Bekisopa’s DSO product will enter a market exposed to robust iron ore prices due to
continuing strong iron ore demand from China and a growing Indian iron and steel industry. Chinese iron
ore imports were up 4.9% in 2024, and up 6.6% in 2023 and 16% over the past five years.
Although, iron ore prices slipped from US$144/t in January to hover around US$108 by the end of 2024,
this is still above US$100, which has been the average over the past nine years and was the base metric
used in the Scoping Study’s financial model.
After long careers spent in mining and resources, we’ve come to learn that iron ore is a consistently highdemand commodity with significant economic importance. Iron ore is a crucial raw material for producing
steel which is essential for construction, manufacturing, and infrastructure development worldwide. Steel
demand is forecast to grow from 2 billion tonnes per annum currently to around 2.7 billion tonnes per
year by 2050 because the world’s electrification requires an enormous amount of steel. There is 280
tonnes of steel required for each new wind turbine, and 27t in each new transmission tower.
If it’s good to be in iron ore, it’s better again to be in high-purity, high grade iron ore. AKORA is one of the
few companies around the world with the potential to produce it.
The cash generated from our Stage 1 DSO operation will be used to fund the planned development of a
Stage 2 processing plant capable of producing a +68% Fe concentrate from Bekisopa’s high grade,
magnetite resource lying beneath the DSO weathered zone.
Demand for higher purity, higher grade iron ore, typically above 67% Fe, is steadily rising as steelmakers
increase their commitment to lowering emissions and producing greener steel.
Direct reduced iron (DRI) processes produce far less greenhouse gases than traditional blast furnaces
but can only use high purity, high grade iron ore.
4
Akora Resources Limited Annual Report for the year ending 31 December 2024
Bloomberg New Energy Finance (BNEF) predicts DRI technology to account for 59% of primary steel
production by 2050 as the steel industry’s decarbonisation gathers pace.
High grade iron ore commands a price premium for every additional 1 per cent you have over a 62% Fe
benchmark. Customers are also willing to pay a slight premium for ore with lower impurities such as
alumina and silica which can affect the productivity and quality of steel production.
At Bekisopa, our fifth drilling campaign completed in June 2024 returned multiple high-grade iron
intersections of DSO style mineralisation at iron ore grades of 58% and above from surface to maximum
depths of 12m. The results are expected to increase Bekisopa’s DSO Resource considerably which could
potentially improve the mine life, project financials and revenues of Stage 1.
In a further boon to project economics, the Company reported In December that PFS crushing and
screening trials had demonstrated Bekisopa’s product mix to be 29% Lump at 65% Fe and 71% Fines at
61% Fe.
PFS-level engineering has been completed for the proposed road route survey from Bekisopa to the
national highway RN7 which connects to the port of Toliara. The road route is shorter than previously
thought while a modest design causeway may be used to cross the Zomandoa River. Both findings lend
to lower capital cost solutions. Meanwhile, locations for road base materials have also been identified,
which if proven suitable and available, will also contribute to more efficient road construction costs.
In September, the Malagasy Mines Minister, Dr Olivier Rakotomalala, hosted positive meetings with
AKORA in Perth and Madagascar where he confirmed his government was open and welcoming to
foreign business and would continue to work closely with AKORA to ensure the Bekisopa Project
received appropriate support to ensure favourable economic, environmental, and social outcomes for all
stakeholders, particularly regional communities.
In January 2025, subsequent to the reporting period, Implementation Procedures for the revised Mining
Code were officially decreed and enacted by the Malagasy Government, further demonstrating the
country’s renewed commitment to exploration and mining and providing an even stronger framework for
mining projects in Madagascar.
This news along with the impending arrival of the PFS and MRE upgrade for Bekisopa sets AKORA up for
another year of success. We extend our sincere thanks to our relentless team for their hard work and our
shareholders who serve the Company’s vision to be one of the world’s iron ore producers of choice.
Graeme Hunt
Non-Executive Chairman
Paul Bibby
Managing Director
5
Akora Resources Limited Annual Report for the year ending 31 December 2024
Review of Operations
6
Akora Resources Limited Annual Report for the year ending 31 December 2024
Project Overview
AKORA Resources (ASX: AKO) is an Australian resources company focused on
the development of high-grade, high purity iron ore projects in Madagascar to
serve the global steelmaking industry’s accelerating decarbonisation.
Figure 1. AKORA’s iron ore projects are four of many active mining projects in Madagascar
7
Akora Resources Limited Annual Report for the year ending 31 December 2024
Bekisopa Iron Ore Project
Ownership 100% | Madagascar
AKORA is currently advancing its flagship Bekisopa Iron Ore Project in
Madagascar through a Pre-Feasibility Study (PFS) towards a Financial Investment
Decision as the company seeks to serve a decarbonising steel industry with
increasing demand for high grade, high purity iron ore.
A PFS for Bekisopa’s Stage 1 Direct Shipping Ore (DSO) operation which has the potential to produce up
to 2 million tonnes per annum (Mtpa) of a +60% Fe average grade lump and fines product over five years
is due by the end of March 2025 and follows a positive Scoping Study released in November 2023.
Project Optionality
The significant scale and particular mineralisation characteristics of Bekisopa’s iron ore resource
presents the Company with several staged development options over time:
1. Produce a 60% Fe average grade Direct Shipping Ore (DSO): Mine, crush and screen iron ore to
produce a 60% Fe average grade lump and fines product for shipping to Blast Furnace-Basic
Oxygen Furnace (BF-BOF) steelmakers.
2. Produce a +62% Fe grade DSO fines: Mine, crush and screen ore to produce a +62% Fe grade
fines product for shipping to BF-BOF steelmakers.
3. Produce a premium-priced +68% Fe grade concentrate: Using cash generated from Stages 1
and/or 2, add grinding and magnetic separation circuits to upgrade the ore to a +68% Fe
concentrate at 75 microns for shipping to Direct Reduced Iron/Electric Arc Furnace (DRI-EAF)
steelmakers, which produce “green steel” with significant reductions in carbon emissions.
Stage 1 DSO Operation Overview
In Bekisopa’s southern zone, 4.4Mt of Indicated DSO tonnes have been defined according to JORC
standards within the overall total project resource of 194.7Mt.
Released in late 2023, an updated Scoping Study prepared by Wardell Armstrong International (WAI)
focused on a Low CAPEX option on this DSO resource and presented two scenarios for comparison:
1.
A minimum capital ‘Low CAPEX Case’ DSO open pit mining operation which contemplates using
contractor labour, contractor mining equipment (trucks and loaders) and mobile processing
equipment (crushing, screen and conveying) suitable for processing the iron ore into a +60% Fe
average grade lump and fines product. Contractors would also be used for truck hauling the
products to a stockpiling location and for ship loading.
2.
A DSO open pit “Low OPEX Case” mining operation which contemplates using contract mining fleet
and labour and AKORA labour, as well as fixed equipment (crushing, screening and conveying)
suitable for processing the iron ore into a +60% Fe average grade lump and fines product. AKORA
would also own and operate the on-road truck hauling fleet and to develop, own and operate a
dedicated port facility with ship loading infrastructure.
8
Akora Resources Limited Annual Report for the year ending 31 December 2024
Figure 2. Low CAPEX Case highlights taken from the Bekisopa Scoping Study (November 2023).
For both the Low CAPEX and Low OPEX cases examined in the Scoping Study, the production schedule
ramps up from 0.5 million tonnes per annum (Mtpa) to 2Mtpa over the initial five years of mine life.
This ramp-up profile is to ensure that management and employees are progressively and appropriately
trained to reliably mine and process product of consistent quality, safely drive haul trucks, and manage
capital, project delivery and operational scale-up risks.
In the ’Low CAPEX Case’ open pit mining operation, the Study found that Bekisopa could deliver an
estimated initial five-year Mine Life with revenues of US$545 million for a weighted average C1 operating
cost over the initial five years of US$45 per wet metric tonne (wmt) (US$42/wmt at full production rate).
This case would generate a pre-tax operating cash flow of US$270 million and an IRR of 64%. The
upfront capital cost was estimated to be US$55.3 million.
A DSO lump and fines start-up operation using at-surface, weathered iron mineralisation would need
much less time, resources and capital to deliver saleable product to market. Positive cash flows could be
generated more quickly to repay the initial capital expenditure, fund further drilling and resource
development, and processing improvements to produce higher grade higher priced, products.
Significant resource growth potential
Notably, the Scoping Study did not include any upside potential DSO tonnes from the remaining 80% of
the under-drilled Bekisopa mineralised strike length, or the Company’s nearby and larger Satrokala
Project where around 30km of prospective strike length of iron ore mineralisation exists. Exploration
success at either Satrokala or Bekisopa, where only 20% of the 6km strike length of identified
mineralisation has been shallow drilled for inclusion in this Study, would significantly add to this initial
five-year DSO Start-Up Plan and result in significantly improved Study financial outcomes.
In March 2024, AKORA announced that its fourth drilling campaign across Bekisopa’s northern and
central zones had encountered new, high-grade mineralisation in 52 out of 65 holes. In May, these results
9
Akora Resources Limited Annual Report for the year ending 31 December 2024
were used to increase the JORC compliant indicated and Inferred DSO Resource at Bekisopa by 42% to
7.9 million tonnes (Mt) at an average grade of 58.8% Fe.
In November 2024, the Company reported that its fifth drilling campaign at Bekisopa, completed in June
within the project’s southern zone, had intersected DSO style iron mineralisation at grades of 58% and
above from surface to maximum depths of 12m in 58 out of 61 shallow holes.
The assay results are expected to add DSO tonnes to the Stage 1 DSO operation, thus improving mine
life and project financials.
Pre-Feasibility Study Overview
Due by the end of March 2025, the PFS has focused on the best operational and financial combination
from the “low CAPEX” option.
The AKORA team has worked tirelessly to advance a number of concurrent activities across a number of
areas. The results to date have been very encouraging and confirm straight forward mining operations at
low cost. A PFS update is provided below:
Geotechnical drilling
Eight holes totalling 400m were drilled across Bekisopa’s southern, central and northern planned DSO pit
locations. Results indicated that drill and blast will not be required for the DSO weathered zone mining as
the material is of low competency and is amenable to ripping which simplifies the mining process, and
potentially reduces mining costs.
With the strength of the host rock identified, further geotechnical work was conducted on the detailed
mine design and pit shell wall angles.
Hydrogeological drilling
Four hydrogeology holes were drilled, two deep holes to a depth of 150m and two corresponding
observation holes to 70m. Initial site testing and water monitoring was conducted along with a wider
hydrogeology engineering assessment.
Preliminary data is very supportive of the planned DSO operations with ground water observed
between 30 and 555m in depth. Initial water draw down and recharge tests have indicated material
water recharge capacity. This in turn suggests that this sub surface water could be well suited to
supply the future DSO site operations.
Metallurgical testing
Crushing and screening tests were performed on 12 representative feed grade samples across
Bekisopa’s southern, central and northern zones.
Hardness test results ranged from 3 to 4.3 kWh/t, which gives a crushability classification of
“very easy”, and is well under industry norms. This indicates that less energy is required to break the
rocks, reducing potential operating and maintenance costs and reducing equipment size.
Abrasion test results ranged from 0.01 to 0.28 which fall in the range of non-abrasive to slightly abrasive.
Magnetite ores typically have a Bond Abrasion Index in the range of 0.20, suggesting that the Bekisopa
10
Akora Resources Limited Annual Report for the year ending 31 December 2024
DSO could result in lower wear on mining and processing equipment, likely reducing future maintenance
costs.
Overall, the results showed that from an average 62% iron feed grade the Lump product average grade
was 65% iron and was 29% of the product mass produced, while the Fines averaged 61% iron and was
71% of the product mass produced. This product mix is expected to maintain financial considerations
used in the PFS.
In February 2025, AKORA reported that metallurgical testing had demonstrated that the Bekisopa
mineralisation has intermediate grade material that can be upgraded to produce saleable products
through basic dry magnetic separation at coarse crush size post the screening stage. This intermediate
material is classified as having head grades between 40 to 58% iron and typically sits adjacent to and
underlying the existing Bekisopa DSO material.
With simple processing, and typically being adjacent to the existing DSO resource, this material could
offer incremental tonnage to increase the project life and economics. Further investigation is required.
Road engineering
AKORA has completed an engineering study of the proposed road route from Bekisopa to the national
highway RN7 which connects to the port at Toliara on Madagascar’s west coast. No existing roadway
exists for the first ~25km of this route. The proposed new road route is shorter than thought and the
Zomandoa River is amenable to a modest design causeway crossing; both findings lend to lower capital
cost solutions. Locations for road base materials have also been identified, if proven suitable and
available, will also contribute to more efficient road construction costs.
Figure 3. Proposed Bekisopa mine to port transport route.
11
Akora Resources Limited Annual Report for the year ending 31 December 2024
Satrokala Project
Ownership 100% | Madagascar
AKORA’s 100% owned Satrokala Project is located just 40km to the south-west of
our flagship Bekisopa Project and offers considerable upside advantage to our
development of the area.
10km Magnetic Strike
In March 2024, Satrokala has emerged as a significant prospect after a magnetic survey conducted in
2023 identified a major anomaly up to 10km long and 2km wide, making it up to 66% larger than the
Company’s more advanced Bekisopa Project.
The magnetic survey covered just 10km of a potential 30km zone of prospective iron mineralisation
previously identified in this project area. Four magnetometer units were used and a team of five
geologists walked the extent of the tenements under the supervision of Planetary Geophysics, Australia.
The Satrokala magnetic units are modelled as seven to eight continuous features along the 10kms of
strike length and trending north-northwest/south-southeast, to interpreted depths of +1,000m and with
combined widths of some ~450m in the north broadening to ~1,280m in the south.
Figure 4. Satrokala drill plan and the associated ground magnetic survey results.
12
Akora Resources Limited Annual Report for the year ending 31 December 2024
The survey results served to pinpoint 10 locations for exploratory maiden drilling at Satrokala in July. The
first five drill holes totalling 501.68m all returned intersections of low-grade iron mineralisation. Intercept
thicknesses ranged up to 51m and averaged 5.1% Fe. The continuous and wide iron intercepts were
extensive and explain the magnetic anomaly but grades were lower than expected. The Company will
reassess all the Satrokala geological information and determine if there are areas along the remaining
8km of strike that may contain higher grade magnetite mineralisation before any future drilling.
13
Akora Resources Limited Annual Report for the year ending 31 December 2024
Corporate
Capital raisings
On 17 April 2024, the Company announced it had completed an equity raising of $3.8 million through a
placement of fully paid ordinary shares to institutional and sophisticated investors (Placement) and a prorata non renounceable 1 for 5 entitlement offer of fully paid ordinary shares (New Shares) in AKORA to
eligible shareholders (Entitlement Offer) (together, the Equity Raising).
Harbury Advisors and PAC Partners acted as joint lead managers to the Equity Raising (Joint Lead
Managers).
AKORA Director Mr Paul Bibby participated in the Entitlement Offer.
On 20 November 2024, AKORA reported it had received firm commitments for a placement of New
Shares to existing and new wholesale investors at the issue price of A$0.13 per share to raise
A$600,000.
Strategic Investor Process
In February, the Company announced that, following the release of its Scoping Study for the Bekisopa
Project, there had been requests for further information on the project. Subsequently, the Company
opened an online Data Room for a Strategic Investor Process. Multiple parties were provided access to
the Data Room. Two non-binding indicative finance offers were received in April. One party conducted
site visits to the Bekisopa and Satrokala projects in May. The Company remains in discussion with
potential strategic investors. There remains a variety of funding structures and valuations being proposed
of which the Board is continuing to carefully consider and work through these options. The Board
remains encouraged by the proposals and discussions held to date.
Leadership changes
AKORA appointed former BHP Iron Ore President Mr Graeme Hunt as Chairman, effective from 1
February 2024. Mr Hunt started his 34-year career with BHP in the sinter plant at the Port Kembla steel
works, before performing General Management roles covering operations management, port operations,
and corporate strategy. Between 1999 to 2005, he was President BHP Iron Ore where his global
responsibilities included the expansion of BHP’s Pilbara operations and the development of strong
commercial relationships with Asian steel mills.
Mr Hunt served as Managing Director (MD) and Chief Executive Officer (CEO) of Lihir Gold Ltd during
which time he managed the company’s takeover by Newcrest Mining for A$9.5 billion. More recently, he
has held MD and CEO positions with both Broadspectrum (formerly Transfield Services) and Chairman
then MD and CEO of AGL Energy Ltd.
Mr Hunt’s commodity experience covers iron ore and steel, coal, manganese, aluminium, copper,
uranium, gold, electricity and gas while his management expertise spans steel production, exploration,
mining, logistics and port operations across Australia, South America, PNG and West and Southern
Africa.
14
Akora Resources Limited Annual Report for the year ending 31 December 2024
In January 2024, AKORA appointed mining operations and project developer Mr Jason Whittle as
General Manager - Development. Mr Whittle has an Honors degree in Mineral Processing and has
worked in operational leadership roles throughout the mining value chain, in mining and processing,
through to marketing, before progressing to project development and implementation roles on major
projects across Australia, Peru and Africa, working for Pasminco, Zinifex, OZ Minerals and MMG. He was
most recently General Manager – Projects at Podium Minerals covering resource development, study
management with internal and external resources, metallurgical testwork, financial modelling,
environmental and license planning and ESG.
Minister of Mines in Madagascar confirms Support for AKORA and the Bekisopa Iron Ore Project.
AKORA’s Chairman, Mr Graeme Hunt, and Managing Director, Mr Paul Bibby, had several encouraging
meetings with the Malagasy Minister of Mines, Dr Olivier Herindrainy Rakotomalala, and his delegation, in
early September at the Africa Down Under (“ADU”) conference in Perth.
At the ADU conference, the Minister of Mines presented the progress achieved to date by the Malagasy
Government on the updating of the Mining Code and their Implementation Procedures, along with the
significant mineral wealth, exploration and mining operations and associated investment occurring in
Madagascar. The Malagasy delegation also presented a Showcase Workshop for exploration companies
and investors on the recently implemented improvements to the Mining Code and the way forward for
exploration and mining companies in Madagascar.
Following those meetings, the Malagasy Minister of Mines invited Mr Bibby to visit Madagascar and
progress those discussions, as they consider Bekisopa to be a key project for Madagascar with near term
development potential.
During the last week of September, discussions with the Mines Ministry were held in Antananarivo, the
capital of Madagascar, and focused on what activities are required to progress Bekisopa towards a Final
Investment Decision. With the pending completion of the PFS, the main points of interest and discussion
related to the preparation and shipping of a trial / bulk representative iron ore sample for Value in Use
testing by major steelmakers, a necessary activity to validate Bekisopa DSO ore.
Also discussed were the necessary steps and timing for upgrading the current Bekisopa exploration
permits and granting the exploitation (mining) permit, the PE, for Bekisopa. The Malagasy Minister of
Mines is working with AKORA to deliver on these key items, as work on the PFS including the
environmental and community studies continue.
15
Akora Resources Limited Annual Report for the year ending 31 December 2024
Competent Persons’ Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist (Pr.Sci.Nat.
- 400155/13) with the South African Council for Natural Scientific Professions (SACNASP). Mr. Leeuwner
has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and the activity being undertaken to qualify as a Competent Person as defined in the Note
for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the 2012 Edition of the
‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC
Code). Mr. Leeuwner consents to the inclusion of the information in this release in the form and context in
which it appears.
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Director of AKORA Resources Limited (AKO), as such he is a shareholder in
AKORA Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its
processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and
mineral processing results.
The information in this report that relates to Mineral Resources for the South Bekisopa Iron Project is
based on information prepared by Mr Richard Ellis BSc, MSc, MCSM, FGS, CGeol, EurGeol and is a fulltime employee of Wardell Armstrong International. Mr Ellis is a Chartered Geologist of the Geological
Society of London and has sufficient experience relevant to the style of mineralisation, the type of deposit
under consideration and to the activity undertaken to qualify as a Competent Person as defined in the
2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Ellis consents to the inclusion of the information in the release in the form and context in
which they appear.
16
Akora Resources Limited Annual Report for the year ending 31 December 2024
Mineral Resources and Ore Reserves
AKORA’s Resource at 31 December 2024.
17
Akora Resources Limited Annual Report for the year ending 31 December 2024
Directors’ Report
18
The directors present their report, together with the financial statements of AKORA Resources Limited (ACN 139 847 555) and
the entities it controlled at the end of, or during, the year ended 31 December 2024 (hereafter referred to as the “Company”), for
the financial year ended 31 December 2024.
Principal Activities
The principal activities of the Company during the financial year were exploration for iron ore in Madagascar. There was no
significant change in the nature of these activities during the year.
Operating Results, Review of Operations for the Year and Significant Changes in State of Affairs
The net loss after tax attributable to shareholders of AKORA Resources Limited of $2,200,221 for the year ended 31 December
2024 (the net loss after tax for the previous financial year was A$1,594,970).
Dividends
No dividends were declared and paid during the year.
Events After Balance Date
On 20 January 2025, the Company issued 300,000 share