35% Increase in Bekisopa MRE Total Iron Ore Tonnes
Released
Released
Announcement PDF
Akora Resources Limited
PO Box 28
Ballarat Victoria 3350
Australia
info@akoravy.com
ACN 139 847 555
ASX: AKO
www.akoravy.com
Enriched
25 February 2025
ASX RELEASE
35% increase in Bekisopa Mineral Resource Estimate
total iron ore tonnes,
27% increase in Indicated Resource tonnes.
Highlights – Compared to the 2024 MRE
• 35% increase of Indicated and Inferred resource to 10.6 million tonnes (Mt) at 54.8%Fe.
Includes 2.1Mt of intermediate grade material grading 39.9%Fe and test work shows this
material upgrades to saleable product grades.
• 27% increase in Indicated DSO resource tonnes,
o 6.6Mt compared to 5.2Mt, both grading 59.7%Fe.
Highlights – Compared to the 2023 Scoping Study
• 93% increase in Indicated DSO and Intermediate Grade resource tonnes.
o
8.5 Mt at 55.4%Fe compared to 4.4 Mt at 60.9%Fe.
• This MRE is a significant step in the development of the Bekisopa Project and will form the
basis for the upcoming Pre-feasibility Study, due in March 2025.
AKORA Resources (ASX: AKO) (“AKORA” or “Company”) has increased the JORC compliant
Mineral Resource estimate at its flagship Bekisopa Iron Ore Project in Madagascar and importantly
increased the quantity of Indicated Resource to 8.5Mt which can therefore be used in the PreFeasibility Study (PFS), planned for release in March 2025. Table 1 shows the Indicated Resource
tonnes improvement from the 2023 Scoping Study through to the 2025 MRE update.
Indicated Resource
Classification
2023 Scoping Study
2024 MRE
2025 MRE
2025 MRE
2025 MRE
DSO
DSO
DSO
Intermediate Grade
DSO and Intermediate Grade
Tonnes (Mt)
%Fe
4.4
5.2
6.63
1.84
8.5
60.9
59.7
59.7
39.9
55.4
Table 1. Increase in Indicated Resource tonnes from the 2023 Scoping Study to the 2025 MRE.
AKORA Managing Director and CEO, Mr Paul Bibby said “the increase in Bekisopa’s Mineral
Resource Estimate, with 10.6 million Indicated and Inferred tonnes, will increase the start-up DSO mine
life and improve project economics. Importantly, the increase to 8.5 million tonnes of Indicated DSO
Resource will strengthen the upcoming Pre-Feasibility Study and is only from drilling along half of the
6km strike length, with future drilling expected to increase resource tonnes and add project mine life.”
This start-up Stage One DSO operation would produce a high-grade circa 60% Fe grade lump and
fines product for use by Blast Furnace-Basic Oxygen Furnace steelmakers and return strong cash
flows and operating cost margin1. This cash flow will then support the development of the potential
Stage 2 Green Steel zone2 to produce a low impurity premium grade +67%Fe iron concentrate.
1
2
ASX Release - Bekisopa Scoping Study, 14 November 2023.
ASX Release - Bekisopa Total Maiden Inferred Resource, 11 April 2022.
Iron ore for tomorrow’s steel making.
Summary – 2025 Mineral Resource update
The 2025 MRE has increased the DSO Indicated and Inferred Resource to 8.5Mt at 58.5%Fe
compared to 7.9Mt at 58.9%Fe in the June 2024 MRE3. Importantly, an increase of 27% in
Indicated DSO tonnes in the at surface weathered zone to 6.6Mt at 59.7%Fe. The 2025 MRE
is summarised in Table 2 and the complete MRE included in Appendix 1.
Mineral Resource Estimate for the Bekisopa Project,
Free Digging and Rippable Mineral Resource, 7 February 2025.
Classification
Tonnes
(Mt)
Fe
(%)
SiO2
(%)
Al2O3
(%)
DSO
Indicated
Inferred
Total Indicated & Inferred
6.6
1.9
8.5
59.7
54.2
58.5
6.6
9.5
7.2
3.9
4.0
3.9
Intermediate A Grade
Indicated
Inferred
Total Indicated & Inferred
1.8
0.3
2.1
39.9
39.5
39.9
23.3
23.3
23.3
7.9
6.8
7.8
Total
Indicated
Inferred
Indicated & Inferred
8.5
2.1
10.6
55.4
52.4
54.8
10.2
11.2
10.4
4.8
4.3
4.7
Table 2. Bekisopa 2025 MRE Direct Shipping Ore Resource, includes 10.6Mt of Indicated and
Inferred resource, from the DSO and Intermediate Grade A mineralisation. 8.5Mt in the Indicated
Resource category will be integrated in the upcoming PFS.
The 2025 MRE includes both DSO and Intermediate Grade DSO into the resource categories which
has increased the overall MRE to 10.6Mt, Indicated and Inferred, at 54.8%Fe compared to the 2024
MRE with only DSO, Indicated and Inferred, at 7.9Mt at 58.8%Fe. This MRE update includes 2.1Mt
of Intermediate Grade ‘A’ material, with a grade range from 30% to 58%Fe, which is located within
and adjacent to the ‘enriched’4 DSO material. Mineral processing studies5 have shown this
intermediate grade DSO readily upgrades using conventional dry coarse magnetic separation to
deliver saleable lump and fines iron ore products. This intermediate material is typically adjacent to
the DSO, within the at surface weathered zone, offering efficient additions to the mining areas.
Compared to the 2023 Bekisopa Scoping Study this MRE delivers a 93% increase in Indicated DSO
tonnes, from 4.4Mt to 8.5Mt, which will be incorporated into the PFS delivering increased mine life.
Background – Mineral Resource Estimate
AKORA Resources announced a Maiden Inferred Mineral Resource at Bekisopa of 194.7 million
tonnes (ASX Releases - 23 March 2022 and 11 April 2022). The Southern Zone Inferred Resource,
covering the surface weathered zone and the underlying extensive magnetite resource, was 110.2
Mt at 32% Fe including an estimated 4.2 Mt of DSO potential at a 57% iron grade. Drilling
campaigns in 2022, 2023 and 2024 were designed to add further DSO resource tonnes to form the
3
ASX Release - Bekisopa DSO MRE 2024 Update, 3 June 2024.
“Enriched DSO” is defined as the higher grade DSO material, within the weathered zone, with a minimum iron
grade of 58%, referred to as DSO or enriched DSO.
5
ASX Release - Bekisopa test work indicates increased saleable ore, 5 February 2025.
Page | 2
4
basis for a start-up DSO mining operation. Future exploration success, in areas yet to be drilled
along the 6km strike, are expected to add further DSO resource tonnes, see Figure 1.
Figure 1 - Bekisopa Project Area, Magnetic TMI Image with Drill Hole Collars (2020 to 2024 Drill
Programs). The areas between those already drilled are targets for future resource drilling campaigns.
The 2025 MRE increase follows a targeted DSO shallow drilling campaign completed at Bekisopa
in June 2024 with the aim of increasing resource confidence, more Indicated tonnes, and test the
extent of the Southern Zone resource boundaries. This follows four years and five focused drilling
campaigns at Bekisopa.
In October 2022 AKORA completed an infill drilling campaign across the Bekisopa Southern Zone
comprising 1,166.4m across 86 close-spaced drill holes at a 50m by 50m spacing to define
additional DSO tonnes and grade6.
All 2022 infill drilling assay results, and the previous 2020 and 2021 drilling results, were provided
to Wardell Armstrong International (WAI) to deliver an updated Southern Zone DSO Mineral
Resource Estimate7. The 2023 Southern Zone MRE update covered 123 shallow drill holes, for
4,817m drilled, with 3,738 drill intercepts assayed.
AKORA conducted a fourth diamond drilling campaign in 2023 and completed 74 drill holes at the
Bekisopa Project in late 20238 targeting the shallow high-grade DSO iron ore mineralisation.
6
ASX Release – 2022 Bekisopa Infill Drilling Results, 22 March 2022.
ASX Release – Bekisopa Southern Zone DSO Resource update, 11 July 2023.
8
ASX Release – Infill Drilling Campaign, 11 October 2023.
7
Page | 3
The 2023 infill DSO drilling increased the total DSO Resource to 5.5 mt at 60.3% Fe Indicated and
Inferred categories, within this is a 4.4 mt DSO Indicated Resource grading 60.9% Fe. These
resource numbers were incorporated into the November 2023 Scoping Study.
In 2024 AKORA conducted the fifth drilling campaign at Bekisopa. Another DSO targeted drilling
program of 61 holes with 508 metres of core drilled at a 50m by 50m spacing to provide infill data
to improve confidence in the known resource and also to place some holes at the perimeter of the
known resource to investigate resource extension possibilities9.
All drilling was diamond cored, either HQ or NTW, using either a man portable EP200 drilling rig or
a MP500 drilling rig (for holes greater than 100m in length).
Samples consisted of diamond drill core and were split in half using a core saw or splitter and
bagged prior to dispatch to the preparation laboratory in Antananarivo. Sample intervals were
nominally 1m down hole however samples would terminate at lithological and mineralisation
boundaries. The average drill core sample length was 0.87m. Samples generally weighed 1-7kg.
All sample preparation was undertaken at The Office of National Mining and Strategic Industries
(OMNIS) preparation lab in Antananarivo, Madagascar. The samples were sorted and weighed,
dried at 110°C-120°C, weighed again, crushed to 2mm, and riffle split twice. The sub-samples were
riffle split to collect 100g with >80% passing 2mm and pulverized to >85% passing 75 microns.
Samples from the 2024 drilling program were sent to ALS in Perth for assay. Analysis at ALS was
completed on 100g of pulverised sample with >85% passing 75 microns by ME-XRF21u (unnormalised) for total Fe% and multi element analysis including Al 2O3, SiO2, P, S, K2O, MgO, Mn,
Ni, Pb, Sn, Sr, TiO2, V, Zn and Zr. Quality Assurance & Quality Control samples consisted of blank
samples, field duplicates, pulp duplicates and certified reference materials (CRM) submitted both
by Akora and internally by ALS. CRM and blank samples were included every 20th sample with two
to four pulp duplicates included in every 100 samples.
Drilling was conducted in the prominent Southern zone of the deposit, adjacent to earlier resource
definition drilling. The drill holes were shallow, targeting the highly weathered DSO zone and
typically less than 20m in depth and typically using a 50m by 50m spacing pattern to support a high
level of geological confidence.
The 2024 drill hole information was provided to AKORA’s engineer Wardell Armstrong International
(WAI) to complete this updated Mineral Resource Estimate (MRE), building on the earlier MREs. A
3D block model was developed with wireframe analysis then being used to further define the
mineral resources areas. Mineralised areas were based on a nominal cut-off grade of 58% Fe for
DSO in the Southern and Northern zones, and 50% Fe for the Central zone. A nominal cut-off grade
of 35% Fe was used for the intermediate A material. A cut-off grade of 25% Fe was used to define
the geological model for the intermediate B material. Cut off grade analysis was reviewed using
histogram and log probability plots and contiguous length analysis to determine a ’natural’ cut off
grade to define the mineralised zone.
The 3D block modelling approach used Datamine Studio RM and Snowden Supervisor software
was used for the mineral resource estimation. Geological modelling and domaining was performed
in Seequent’s Leapfrog. Pit optimisation for the limitation of Mineral Resources was performed in
NPV Scheduler. The resource estimation technique used was Inverse Distance Weighting to power
2 (“IDW2”) as the principal estimation methodology. Nearest Neighbour estimates were carried out
9
ASX Release - 2024 Drilling Campaign identifies high-grade DSO, 26 November 2024.
Page | 4
for validation purposes. A block size of 20m (X) x 20m (Y) x 5m (Z) was used for grade estimation.
The smallest drill spacing at Bekisopa is 50m x 50m in the DSO zones. Grades and density values
were estimated into the block model using Datamine software.
Open pit mining of the at and near-surface DSO has been assumed and this updated 2025 MRE
has been constrained by an open pit optimisation based on technical and indicative mining and
processing costs and long-term product pricing parameters based on the Scoping Study and the
in-progress 2025 Pre-Feasibility Study. The DSO will be processed by crushing and screening to
produce conventional Lump and Fines products (Lump is -31.5+6.3mm, Fines is -6.3mm).
This 2025 updated Bekisopa DSO Mineral Resource Estimate, prepared by WAI, contains the
required JORC Table One Sections 1, 2 and 3, and details the sampling, drilling and assaying
methodology, geological interpretation and the resource estimation procedure and details, included
in Appendix 2.
Geological Setting
The local geology consists of a calc-silicate unit within schists and gneisses. The calc-silicate unit
appears to be a favourable host for deposition of iron mineralisation from metasomatic fluids derived
from either magmatic or metamorphic processes. Broad layers of massive magnetite–hematite are
traceable over the entire 6km extent of the overall Bekisopa tenements.
Mineralisation is interpreted as a series of parallel layers of predominantly massive magnetitehematite with thicknesses of a few metres up to 20-50m, within the magnetite bearing host rocks.
Disseminated mineralisation is also present and includes both coarse and disseminated types.
The mineralisation has the form of a tabular zone or zones and trends from steeply westerly dipping
in the north to moderately westerly dipping in the centre and moderately to flat dipping in the south.
Faulting is not apparent on a large scale but may be present on a smaller scale that has not been
identified with the current drill spacing. East-west faults, represented by small valleys separating
the three zones, are hypothesised and require further investigation.
Oxidation is variable, but generally complete oxidation is between 5m and 20m below surface.
There has been some iron enrichment in the oxidised zone due to removal of host rock material via
weathering, resulting in the presence of DSO in the upper, completely oxidised zone and in surficial
scree derived from this material. Transitional and primary mineralisation is found below the oxidised
zone. Iron mineralisation occurs dominantly as magnetite although some hematite is noted, in
particular near surface.
Iron mineralisation in the Northern zone is interpreted over a strike length of 700m, with widths of
between 30 and 100m. DSO thickness varies from 0.5m to 7.5m in thickness. Exploration remains
open to the north and south. A consequence of the more complex geology observed at depth in
the Northern zone is that it reduces the confidence in the continuity of the iron mineralisation and
therefore the likelihood of the MRE being categorised in the Indicated category.
Page | 5
Figure 2 - Bekisopa DSO (Red) and Intermediate (Orange) Mineralisation Domains contained in the
2025 MRE. There remains considerable areas for future drilling to expand the DSO resource.
Iron mineralisation in the central zone is interpreted over a strike of 780m with widths between 70
and 170m. DSO thickness varies from 0.5m to 5m in thickness. Mineralisation remains open to
the south.
Iron mineralisation in the southern zone covers an area 1,100m in length and up to ~1,200m in
width and the thickness of the DSO varies from 1m to 20m. Mineralisation is dipping to the west.
A western limb has been identified in the southern resource zone. This zone is 600m long and
250m in width.
Page | 6
Figure 3 - Section of the model vs Composite %Fe Grades at Bekisopa South (DSO only shown in the
inset). This section shows an expansive high-grade magnetite deposit, 34Mt inferred grading 45.3%Fe
directly below the DSO10 and suitable for upgrading to a clean premium grade 68.7%Fe Concentrate.
Figure 4 - Section of Model vs Composite %Fe Grades at Bekisopa North (DSO only shown in the
inset). Below the at surface DSO iron mineralisation is the expansive and continuous magnetite
inferred resource with average grade of 38%Fe defined down to 300m downhole11.
10
11
ASX Release - Bekisopa Southern Zone Mineral Resource, 11 July 2023.
ASX Release - Maiden Resource Northern and Central Zones, 23 March 2022.
Page | 7
Diggability and Rippability Surfaces
Bekisopa is characterised by high-grade, near-surface material that is highly weathered and thus
amenable to mining without drilling or blasting. This material is generally represented by completely
weathered to highly weathered material. A rippability assessment was undertaken as part of the
geotechnical study and concluded that the saprock lithologies can be mined by digging using shovel
excavators or ripping using bulldozers.
Diggability and rippability surfaces were constructed by WAI to define the maximum depth of
digging and below this the maximum depth of ripping. Below this depth drill and blast techniques
are considered necessary. The boundaries were defined based on the geotechnical study and by
analysing the drill core (both whole and half core) for every drillhole in the database, along with the
geotechnical and weathering logs. Where core appears to be completely weathered and highly
friable, this is deemed as “free dig” and will require no ripping. Core that is weathered and friable
and does not retain significant pieces (>10cm) when cut using a core saw, is deemed “rippable”.
The current MRE is based only on material that is free digging by excavator or rippable by bulldozer
and this material will form the basis of the PFS. The deeper mineralisation, requiring drilling and
blasting is not included in the current MRE.
Indicated Mineral Resource Classification.
The Mineral Resource classification was undertaken by WAI in accordance with the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves [JORC Code
(2012)]. WAI considers that parts of the Bekisopa deposit have been sufficiently explored to assign
an Indicated Resource and an Inferred Mineral Resource as defined by the JORC Code (2012).
The relatively close spaced drilling in areas of the Bekisopa deposit are enough, along with other
interpretations, for iron mineralisation continuity to be assumed.
There are no known mining, metallurgical, infrastructure, or other factors that materially affect this
MRE at this time.
Next Steps
AKORA will use this updated MRE as the basis of the Bekisopa Pre-Feasibility Study, scheduled
for release in March 2025. This will be developed using the increased 2025 MRE tonnes and will
include a detailed mine plan, production schedule and project financials.
Conclusion
AKORA commissioned WAI to produce an updated MRE for the Bekisopa deposit. The Bekisopa
Project comprises three zones – the Northern, Central and Southern zones. It is the goal of AKORA
to develop an open pit operation with an initial Stage One focusing on bringing into production the
at surface weathered iron material as DSO Lump and Fines products.
This MRE upgrade offers an overall increase in DSO resource tonnage when compared to the April
2024 MRE. Importantly, it delivers a 93% increase in Indicated Resource tonnes above the 2023
Scoping Study now 8.5Mt at 55.4%Fe compared to 4.4Mt at 60.9%Fe which will be incorporated in
the PFS. The addition of intermediate grade material grading from 30 to 58% Fe, that is adjacent
to the weathered zone DSO and easily upgraded to a saleable product, will offer the project
additional tonnage and life of mine in the upcoming PFS, being released in March 2025.
Page | 8
This announcement has been authorised by Akora Resources Limited’s Board of Directors.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Gareth Quinn
Investor Relations
Phone +61(0) 417 711 108
gareth@republicpr.com.au
Competent Persons Statements
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time employee
of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist (Pr.Sci.Nat. - 400155/13)
with the South African Council for Natural Scientific Professions (SACNASP). Mr. Leeuwner has sufficient
experience which is relevant to the style of mineralisation and type of deposits under consideration and the
activity being undertaken to qualify as a Competent Person as defined in the December 2012 Edition of the
‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code).
Mr. Leeuwner consents to the inclusion of the information in this release in the form and context in which it
appears.
The information in this document that relates to the Mineral Resource estimate of the Bekisopa project is
based on, and fairly represents information and supporting documentation compiled and reviewed by Mr.
Richard Ellis, a full-time employee of Wardell Armstrong International and independent of Akora Resources.
Mr. Ellis is a Chartered Geologist (CGeol) and Fellow of the Geological Society of London, and European
Geologist (EurGeol) of the European Federation of Geologists, and has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the December 2012 edition of the "Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" ('JORC Code'). Mr. Ellis
consents to the inclusion in the report of the matters based upon the information in the form and context in
which it appears.
Cautionary Statement
This release contains a series of forward-looking statements. Generally, the words "expect," “potential”,
"intend," "estimate," "will" and similar expressions identify forward-looking statements. By their very nature
forward-looking statements are subject to known and unknown risks and uncertainties that may cause our
actual results, performance or achievements, to differ materially from those expressed or implied in any of
our forward-looking statements, which are not guarantees of future performance. Statements in this release
regarding AKORA’s business or proposed business, which are not historical facts, are forward-looking
statements that involve risks and uncertainties, such as Mineral Resource estimates, market prices of iron
ore, capital and operating costs, changes in project parameters as plans continue to be evaluated, continued
availability of capital and financing and general economic, market or business conditions, and statements
that describe AKORA’s future plans, objectives or goals, including words to the effect that AKORA or
management expects a stated condition or result to occur. Forward-looking statements are necessarily based
on estimates and assumptions that, while considered reasonable by AKORA, are inherently subject to
significant technical, business, economic, competitive, political and social uncertainties and contingencies.
Since forward-looking statements address future events and conditions, by their very nature, they involve
inherent risks and uncertainties. Actual results in each case could differ materially from those currently
anticipated in such statements. Investors are cautioned not to place undue reliance on forward-looking
statements, which speak only as of the date they are made.
Page | 9
Iron ore for tomorrow’s steel making.
AKORA Resources Ltd (ASX: AKO) is an Australian resources company focused on the
development of four high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (Mt) at 32% iron
Inferred JORC Resource (ASX Announcement 11 April 2022) with very low impurities able to
produce a premium-priced +68% Fe concentrate. Direct Reduced Iron-Electric Arc Furnace (DRIEAF) technology which is used to make greener steel without coal and considerably less carbon
emissions requires iron ore grades of at least 67%.
To generate cash in the near-term, AKORA is advancing plans at Bekisopa to produce up to 2Mt
per annum over the first five years of a 60% Fe average grade direct shipping ore (DSO) (ASX
Announcement 14 November 2023) for shipping to Blast Furnace-Basic Oxygen Furnace
steelmakers.
The Company confirms that it is not aware of any new information or data that materially affects the above and that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed.
And further the Company confirms that all material assumptions underpinning the 2Mt per annum production target
continue to apply and have not materially changed.
Page | 10
Appendix 1. 2025 Mineral resource Estimate for the Bekisopa Project.
The tonnes and grades included in the 2025 Updated MRE are detailed in Appendix 1,Table 1.
Mineral Resource Estimate for the Bekisopa Project,
Free Digging and Rippable Mineral Resources, 7 February, 2025
Classification
Tonnes
(kt)
DSO
Indicated
5,724
Inferred
902
Intermediate A zone
Indicated
1,231
Inferred
105
Intermediate B zone
Indicated
260
Inferred
765
DSO
Indicated
560
Inferred
15
Intermediate A zone
Indicated
605
Inferred
42
Intermediate B zone
Indicated
59
Inferred
187
DSO
Indicated
349
Inferred
955
Intermediate A zone
Indicated
Inferred
111
Intermediate B zone
Indicated
Inferred
748
DSO
Indicated
6,633
Inferred
1,872
Intermediate A zone
Indicated
1,836
Inferred
258
Intermediate B zone
Indicated
319
Inferred
1,700
Density
(t/m3)
Fe
(%)
Al2O3
Mn
(%)
(%)
Bekisopa South
P
(%)
S
(%)
SiO2
(%)
TiO2
(%)
3.39
2.99
60.26
55.91
3.61
4.69
0.094
0.085
0.100
0.103
0.039
0.104
6.13
7.73
0.149
0.202
2.38
2.33
40.54
40.09
8.19
7.35
0.154
0.159
0.097
0.070
0.029
0.008
23.06
23.55
0.322
0.308
2.54
3.41
34.25
38.96
4.85
0.148
4.62
0.084
Bekisopa Central
0.153
0.133
0.083
0.175
29.31
24.68
0.184
0.165
3.19
3.07
54.85
53.45
6.12
6.35
0.159
0.161
0.060
0.060
0.005
0.005
11.07
11.95
0.289
0.307
2.65
2.65
38.65
38.86
7.41
7.60
0.195
0.183
0.111
0.110
0.004
0.014
23.67
23.11
0.295
0.293
2.75
3.20
31.17
38.11
4.17
0.164
2.56
0.126
Bekisopa North
0.180
0.117
0.015
0.519
27.73
17.62
0.171
0.114
3.11
3.49
58.54
52.60
5.46
3.36
0.121
0.128
0.086
0.213
0.007
0.027
7.53
11.26
0.231
0.121
2.52
39.26
5.91
0.172
0.125
0.003
23.23
0.194
2.71
32.82
3.70
0.132
Bekisopa Total
0.164
0.059
23.61
0.163
3.36
3.22
59.71
54.20
3.92
4.02
0.101
0.108
0.096
0.159
0.034
0.064
6.62
9.56
0.165
0.682
2.46
2.46
39.92
39.53
7.93
6.77
0.168
0.169
0.102
0.100
0.021
0.007
23.26
23.34
0.313
0.257
2.57
3.04
33.68
36.16
4.72
3.99
0.151
0.110
0.158
0.145
0.070
0.162
29.02
23.43
0.182
0.159
Table 1. Bekisopa 2025 MRE Direct Shipping Ore Resource, includes 10.6Mt of Indicated and
Inferred resource, from the DSO and Intermediate Grade A mineralisation, of which 8.5Mt are in the
Indicated category and will be integrated in the PFS. (Intermediate B iron mineralisation is included in
this MRE and at this stage has not been included in the overall Indicated and Inferred resource calculations).
Notes
Page | 11
1.
2.
3.
4.
5.
6.
7.
Mineral Resources of the weathered zones are reported within wireframe boundaries interpreted at nominal cut-off
grades of 58% Fe for Bekisopa South and North and 50% Fe for Bekisopa Central. Mineral Resources of the
Intermediate A Zones are reported within wireframe boundaries interpreted at a nominal cut-off grade of 35% Fe.
Mineral Resources of the Intermediate B Zones are reported at a cut-off grade of 30% Fe.
Mineral Resources are limited by an optimised open pit shell based on appropriate technical and economic
parameters.
Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a PreFeasibility Study or Feasibility Study.
Mineral Resources are reported inclusive of any Ore Reserves.
Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by Richard
Ellis, an independent Competent Person as defined by JORC.
The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title, taxation,
socio-political, marketing or any other relevant issues.
All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due to
rounding.
No material changes occurred to the 2023 MRE12 for the underlying Green Steel iron ore zone as
all post 2023 drilling targeted the shallow highly weathered DSO mineralisation. The Green Steel
MRE data is detailed in Table 2.
Table 2. Bekisopa MRE Green Steel Iron Ore Zone. This 45.3%Fe mineralisation readily upgrades to
produce a low impurity +67%Fe concentrate suitable for Direct Reduced Iron steel making feed.
Notes:
1. Mineral Resources are reported using a cut-off grade of 36% Fe.
2. Mineral Resources comprise moderately weathered and unweathered material.
3. Mineral Resources are limited by an optimised open pit shell based on appropriate economic and mining
parameters.
4. Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a PreFeasibility Study or Feasibility Study.
5. Mineral Resources are reported inclusive of any Ore Reserves.
6. Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by Richard
Ellis, an independent Competent Person as defined by JORC.
7. The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title, taxation,
socio-political, marketing or any other relevant issues.
8. All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due to
rounding.
12
ASX Release, Maiden Resource Northern and Central Zones, 23 March 2022
Page | 12
Appendix 2 – JORC TABLE 1.
Section 1 Sampling Techniques and Data
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
•
Nature and quality of
sampling (eg cut channels, random
chips, or specific specialised
industry standard measurement
tools appropriate to the minerals
under investigation, such as down
hole gamma sondes, or handheld
XRF instruments, etc). These
examples should not be taken as
limiting the broad meaning of
sampling.
•
Include reference to
measures taken to ensu
Share your feedback