ShareCafe Webinar Presentation
Released
Released
Announcement PDF
Premium Grade Iron Ore Future
with a DSO Start-up
1 April 2022 - ShareCafé Webinar
AKORA – High-Grade Iron Ore in Madagascan
Bekisopa
Outcrop – 66.7% iron ore
Future
Projects
Tratramarina
Ambodilafa
Morombe
Bekisopa
Low-cost
DSO start-up
focused on
High-Grade Outcrop
and
Weathered Zone Iron
Toliara
HG - Weathered Zone
BEKD17 - 2.2m at 66.1%Fe
2
Bekisopa – Drilling Success
Tenement
3757
➢ Completed 63 drill holes, totaling 6,200m drilled
➢ Confirms iron mineralisation continues;
➢ below high-grade outcrop
➢ at depth of 300m downdip
➢ along 6-kilometer strike
➢ across strike widths +750m
➢ true thickness 50 to 171m across and downdip
➢ Results indicate a significant iron ore body
➢ Drilled only 30% of the 6km strike length
➢ These outcomes are just on the main tenement
Tenement
10430
Bekisopa - Northern Zone Cross Section
300m
Downdip
Iron formation dipping to the west, open at depth
High-Grade ~64%Fe near surface assays - potentially DSO
BEKD01 6.9m @ 64.7%Fe, BEKD19 4.6m @ 63.9%Fe, BEKD24 3.9m @ 63.7%Fe,
Selectively mine the high-grade surface DSO
4
Bekisopa - Central Zone Cross Sections
True width
70m
Flatter westerly dipping iron formation, open at surface and depth
Ideal structure for a low strip ratio mining
5
First half - Bekisopa Maiden Mineral Resource
Maiden Mineral Resource* completed in 15 months post IPO
Bekisopa Zone
Tonnes
Mt
DTR
%
Head Grade
%Fe
Concentrate
Grade
%Fe
DTR
Tonnes
Mt
Northern
43.3
43.3
33.3
68.2
18.7
Central
41.2
36.3
30
67
15
Total (Inferred)
84.5
39.9
31.7
67.6
33.7
✓ Resource only for the Northern and Central Zones, using 25 of the 61 drill holes intercepting iron
✓ Yet to include the Southern Zone drilling and processing trial results
✓ Southern Zone Exploration Target estimate# is; 50 to 100Mt at comparable DTR and iron grade assays
Note * - Refer to AKO-ASX Announcement 23 March 2022 for complete Maiden Resource details and JORC Tables.
Cautionary Statement # – The Board of Directors wish to inform shareholders that an Exploration Target is conceptual in nature and accordingly, there has
6
not been sufficient information completed to estimate a Mineral resource and that further exploration will result in an estimate of a Mineral resource.
Next - Southern Zone Maiden Resource
North and Central Maiden
Mineral Resource
84.5 Million Tonnes
Southern Zone Resource
to be confirmed,
Exploration Target
50 to 100 Mt
~50 to
100Mt
43.3Mt
North
41.2Mt
Central
South
7
Bekisopa Mineralised Zones – Oblique View
Central
Zone
Northern
Zone
41.2Mt
43.3Mt
Southern Zone
Exploration Target
Estimated at
~50 to 100Mt
Southern Zone covers a large area, with substantial downhole cross sections of 150 to 162mt
Exploration Target estimated at 50 to 100 Mt, plus
significant upside in the undrilled areas along strike and to the west
8
Product Grade Trials
Drill Core – BEKD10
0 to 4m
59%Fe
16 to 20m
51%Fe
24 to 28m
54%Fe
High to Premium Iron Grades at Coarse sizing’s
Product trials performed on composites from surface to ~37m downhole – BEKD01, 04, 10 and 34
▪
▪
▪
Confirm upgradability at a 2mm crush and magnetic separation (wLIMS)
Confirm upgradability at a 75-micron size and magnetic separation (DTT)
Composites covers ~6 metres in length, typical mining bench height
Drill Core
Composite
Composite
Interval (~m)
Head Grade
(%Fe)
wLIMS
(%Fe)
DTT
(%Fe)
1
0– 6
59.2
68.5
69.3
2
6 – 12
47.0
63.0
69.4
3
12 – 19
41.8
63.8
69.8
4
19 – 26
43.9
64.2
70.0
5
26 – 32
42.0
63.1
70.2
6
32 - 37
39.9
63.1
69.4
45.6
64.3
69.7
Averages
32 to 36m
63%Fe
Magnetic Separation upgrades Bekisopa iron to outstanding grades at coarse sizing’s
wLIMS at 2mm delivers 64%Fe, 3.2%Silica, 1.3%Alumina, 0.046%P, 0.02%S at a 65%mass yield
DTT at 75-microns delivers 70%Fe, 0.7%Silica, 0.6%Alumina, 0.002%P, 0.005%S at a 54% mass yield
9
Anticipating a High-Grade DSO start-up at Bekisopa
BEKD16
BEKD31
1
67.8%Fe
66.2%Fe
68.5%
64.8%
68.5%
64%
69.3%
2
66.3%
2
Outcrop plus Very High-Grade Surface Zone
Focus for Start-Up – Selective Mining
Producing High-grade Lump and Fines
DSO ~65%Fe
10
Produce iron ore fines after a 2mm crush and dry magnetic separation
BEKD09
BEKD34
BEKD46
58%Fe
57.3%Fe
34.3%Fe
60%
43.9%
42.9%
59%
62.8%
30.8%
3
51%
At Surface
4
48.3%
At Depth
Surface Zone
~65%Fe Fines
Then
produce
high-grade
iron ore
fines
4
33.3%
At Depth
From Depth
~62%Fe Fines
11
Produce Premium Grade Iron at 75-microns and magnetic separation
Central Zone Drill Core BEKD04 Upgrades to
32%Fe
71% Iron
“Super” Premium Grade Iron Ore
30%
Concentrate at 75-micron
27%
22%
5
0.37% Silica, 0.01%Alumina,
0.002%P and 0.003%S
At 81%Fe Recovery and 31% Mass yield
Very high-grade iron feed, +67%Fe, with low impurities will be required by the
Iron and Steel industry to achieve reduced carbon emissions.
The demand for this high-quality Direct Reduced Iron feed will
increase as the steel industry tackles decarbonization.
AKORA looks well placed to feed Green Steel Future.
12
Bekisopa a Significant 84.5Mt Iron Resource with more to Prove
Confirmed Bekisopa Resource of 84.5Mt at 67.6%Fe product grade, next
✓ Report the Southern Zone Exploration Target estimated at 50 to 100Mt
✓ Further mineralisation and resource work
✓ Studies on transport logistics options, port, mining, processing and power
✓ Geological work on near by Bekisopa SW tenements, expand the Resource
✓ Understand the shift to +67%Fe DRI feed for Green Steel
13
AKORA Resources – Bekisopa Maiden Resource at 84.5Mt, includes
Iron Ore Price - USD/t
✓ 64%Fe potential DSO at surface
210
190
65%Fe
170
✓ 64%Fe high grade fines after magnetic separation
at 2mm crush size with low impurities
150
130
62%
110
90
58%
✓ 68%Fe premium grade after magnetic separation at
Jan
Feb
Mar 70
75-micron size with extremely low impurities
0.7%Silica, 0.6%Alumina, 0.002%P, 0.005*%S
✓ Potentially DRI grade suitable for the Green Steel future
Background
BEKD01 wLIMS
Composite 7
63%Fe
14
Disclaimer
Forward Looking and Competent Person Statement
This corporate presentation contains forward looking statements which constitute “forward looking information” within the meaning of securities legislation and “Forward Looking Statements”.
•
All statements included herein, other than statements of historical fact, are Forward Looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in
the Forward Looking Statements. The Forward Looking Statements in this corporate presentation may include, without limitation, statements about the company’s plans for its exploration projects and future exploration, evaluation and development including drilling
activities, quantification of mineral resources, feasibility studies, the construction and development of the Bekisopa Project, the company’s business strategy, plans and outlook; the merit of the company’s mineral properties; mineral exploration potential, timelines;
the future financial or operating performance of the company and cost guidance; expenditures; approvals and other matters.
•
Often, but not always, these Forward Looking Statements can be identified by the use of words such as “estimate”, “estimated”, “potential”, “planned”, “open”, “future”, “assumed”, “projected”, “calculated”, “used”, “detailed”, “has been”, “gain”, “upgraded”,
“expected”, “offset”, “limited”, “contained”,“reflecting”,“containing”,“conduct”,“increasing”,“remaining”,“to be”, “periodically”, or statements that events, “could” or“ should” occur or be achieved and similar expressions, including negative variations.
•
Forward Looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the company to be materially different from any results, performance or achievements expressed or
implied by the Forward Looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; changes in commodity prices; technological and operational hazards in mine development activities;
risks inherent in mineral exploration; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; construction delays, the timing and availability of financing; governmental and other approvals; political unrest or instability in
countries where IPR is active; labour relations issues; as well as those factors discussed under “Risk Factors” in the Company's Subscription Deed.
•
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward Looking Statements, there may be other factors that cause actions, events or results to differ
from those anticipated, estimated or intended. Forward Looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to estimates of future exploration success; expectations on
economic viability of any mineral resource identified; expectations regarding future construction costs; expected trends in mineral prices and currency exchange rates; that the company’s activities will be in accordance with the company’s public statements and
stated goals; that there will be no material adverse change affecting the company or its properties; that all required approvals will be obtained; that there will be no significant disruptions affecting operations, including the development and construction of the
Bekisopa Project or any other project the Company seeks to advance, and such other assumptions as set out herein.
•
Forward Looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward Looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can
be no assurance that Forward Looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward Looking
Statements. This corporate presentation also refers to non-IFRS financial measures, such as future guesstimate of cash cost per tonne of processed ore and guesstimates of operating cash flow. These measures do not have a standardized meaning or method of
calculation, even though the descriptions of such measures may be similar.
Competent Person Statement
•
The information in this report that relates to Exploration Targets, Exploration Results, and related scientific and technical information, is based on and fairly represents information compiled by Mr Anthony Truelove. Mr Truelove is a consulting geologist to Akora
Resources Limited (AKO). He is a shareholder in Akora Resources Limited, holding 4,545 shares he purchased in 2011, some 8 years prior to being engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of Mining and Metallurgy
(MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG). Mr Truelove has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the matters based on his information in the form and context in which it appears including sampling, analytical and test data underlying the results.
•
The information in this report that relates to Mineral Processing and related scientific and technical information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a Metallurgist and Managing Director of Akora Resources Limited
(AKO), as such he is a shareholder in Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its processing under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters based on his information in the form and context in which it appears including
analytical, test data and mineral processing results.
•
The data in this report that relates to Mineral Resource Estimates and Exploration Targets for the Bekisopa deposits is based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who
has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Tear is a Director of H&S Consultants Pty Ltd and he consents to the inclusion in the report of the Mineral Resource in the form and context in which they appear.
15
AKORA
Resources
Bekisopa
Project
DSO Start-up
and
High Grade
Iron Ore Future
ASX: AKO
Investor Presentation
March 2022
Share your feedback
Discover