NWR Virtual Conference - Presentation
Released
Released
Announcement PDF
Bekisopa Drill Hole 40
Central Area, ended in
Mineralisation at 103m
AKORA
Resources
26 August 2021
High Grade
Iron
Mineralisation
Targeting a
Maiden JORC
Resource at
Bekisopa
ASX: AKO
Investor Presentation
September 2021
Disclaimer
Forward Looking and Competent Person Statement
This corporate presentation contains forward looking statements which constitute “forward looking information” within the meaning of securities legislation and “Forward Looking Statements”.
•
All statements included herein, other than statements of historical fact, are Forward Looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from
those reflected in the Forward Looking Statements. The Forward Looking Statements in this corporate presentation may include, without limitation, statements about the company’s plans for its exploration projects and future exploration,
evaluation and development including drilling activities, quantification of mineral resources, feasibility studies, the construction and development of the Bekisopa Project, the company’s business strategy, plans and outlook; the merit of the
company’s mineral properties; mineral exploration potential, timelines; the future financial or operating performance of the company and cost guidance; expenditures; approvals and other matters.
•
Often, but not always, these Forward Looking Statements can be identified by the use of words such as “estimate”, “estimated”, “potential”, “planned”, “open”, “future”, “assumed”, “projected”, “calculated”, “used”, “detailed”, “has been”, “gain”,
“upgraded”, “expected”, “offset”, “limited”, “contained”,“reflecting”,“containing”,“conduct”,“increasing”,“remaining”,“to be”, “periodically”, or statements that events, “could” or“ should” occur or be achieved and similar expressions, including negative
variations.
•
Forward Looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the company to be materially different from any results, performance or
achievements expressed or implied by the Forward Looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; changes in commodity prices; technological and
operational hazards in mine development activities; risks inherent in mineral exploration; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; construction delays, the timing and availability of
financing; governmental and other approvals; political unrest or instability in countries where IPR is active; labour relations issues; as well as those factors discussed under “Risk Factors” in the Company's Subscription Deed.
•
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward Looking Statements, there may be other factors that cause actions, events or
results to differ from those anticipated, estimated or intended. Forward Looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to estimates of future
exploration success; expectations on economic viability of any mineral resource identified; expectations regarding future construction costs; expected trends in mineral prices and currency exchange rates; that the company’s activities will be in
accordance with the company’s public statements and stated goals; that there will be no material adverse change affecting the company or its properties; that all required approvals will be obtained; that there will be no significant disruptions
affecting operations, including the development and construction of the Bekisopa Project or any other project the Company seeks to advance, and such other assumptions as set out herein.
•
Forward Looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward Looking Statements, whether as a result of new information, future events or results or otherwise, except as required
by law. There can be no assurance that Forward Looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue
reliance on Forward Looking Statements. This corporate presentation also refers to non-IFRS financial measures, such as future guesstimate of cash cost per tonne of processed ore and guesstimates of operating cash flow. These measures do
not have a standardized meaning or method of calculation, even though the descriptions of such measures may be similar.
Competent Person Statement
•
The information in this report that relates to Exploration Targets, Exploration Results, and related scientific and technical information, is based on and fairly represents information compiled by Mr Anthony Truelove. Mr Truelove is a
consulting geologist to Akora Resources Limited (AKO). He is a shareholder in Akora Resources Limited, holding 4,545 shares he purchased in 2011, some 8 years prior to being engaged as a consultant. Mr Truelove is a Member of the
Australasian Institute of Mining and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG). Mr Truelove has sufficient experience which is relevant to the styles of mineralisation and types of deposits
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the matters based on his information in the form and
context in which it appears including sampling, analytical and test data underlying the results
2
AKORA Resources – Madagascan Iron Ore
Flagship Project
Bekisopa
100% AKORA owned
4 Permits - 93.5 km2
➢ Significant historical work
➢ High Grade outcropping iron ore
➢ 6 km strike
Trench 36 – Southern Area
➢ Drilling, ~3850m so far,
Tratramarina
Ambodilafa
confirms significant iron
mineralisation at surface and
depth, along 5kms of strike.
Bekisopa
➢ +62%Fe product grade fines in
initial processing trials
➢ ~250 kms to port of Toliara
Toliara
Outcrop of high-grade iron
3
Tratramarina and Ambodilafa future Project Opportunities
Tratramarina – low capex and opex potential
16 kms from coast and adjoins the Mangoro River
Ambodilafa – 45kms inland
• 421 rock chips averaged 44% Fe
• 7 drill holes, 2013, intersected banded iron
formation with near surface intersections of
54m @ 35.39% Fe and 42m @ 30.8% Fe and
12m @ 37.18% Fe at depth.
Strong Magnetic Anomaly
• Unknown before 2006, airborne survey highlighted
anomaly
• 305 Rock chips averaging 40.05% Fe
• 7 drill holes, 2011-12, intersected banded iron
formation magnetite iron ore; near surface
intersection - 6m at 42.5% Fe & 35m at 35.7% Fe.
Large magnetic
anomaly (red area)
over a 5km strike
length and
interpreted as
extending to a
depth of
+500m
• Strike length ~2.5km.
4
Bekisopa - Geological Findings - October 2019
Extensive outcropping iron along 6km strike length
The mineralisation is interpreted as being a series
of parallel layers of massive magnetite-hematite,
with host rock containing magnetite between those
high-grade layers.
Layers of magnetite-hematite are traceable over the
entire strike on the main tenements
Northern and central areas are relatively simple with
a few westerly dipping layers (50-70˚) which are
traceable over considerable distances
Southern area, may be more complex, with flat lying
and steeply dipping zones of iron mineralisation
Trench 39E, dug in ~1960, shows steep west
dipping massive iron mineralisation
below ground level
5
October 2019 – Ground Magnetic Survey & Geophysical Modelling
Results show a relatively consistent high
magnetic body extending over ~6km of
strike
Central Transverse Line
Northern transverse line
•
•
•
Models as a simple magnetic body dipping to the
west, red ellipsoid, with depth extent of at least
500m, possible width of ~150m
Matches observed outcrop and sub crop, suggests
excellent depth and a simple geometry for mining
Drilling confirming the geophysical modelling
• Model shows several magnetic bodies; one
a sphere, width ~150m, and a steeply west
dipping body with depth extent of at least
300m and possible width of 40m
• This matches the geological interpretation
of one or more parallel magnetic layers
dipping to the west.
• Drilling in the Central and Southern zones
confirms the geophysical modelling
6
Bekisopa 2020 drilling
➢ 2020 Exploratory Drilling designed to confirm
iron mineralisation at depth and along strike
➢ Completed 12 shallow holes, <100m, for
1095.5m (black dots)
➢ All intercepted iron mineralization at surface
and several at depth, with several holes
ending in mineralisation
Tenement
3757
2.5 by 2.5 kms
Tenement
10430
5 by 5 kms
Bekisopa 2021 drilling - completed
Tenement
3757
2.5 by 2.5 kms
Tenement
10430
5 by 5 kms
➢ 2021 Drilling Campaign designed to add volume
/ tonnes to the 2020 drilling intercepts
➢ Completed 30 shallow drill holes, <100m, to
define the eastern extent of the iron
mineralisation along the strike (blue dots)
Bekisopa 2021 drilling – to go
➢ 20 deeper drill holes, >100 to ~200m, to define
the mineralisation extent across strike and at
depth (green dots)
➢ In total ~4500m of diamond drilling to be
completed by late October
➢ Drill grids in the North, Central and Southern
areas for input into the JORC Resource.
Tenement
3757
2.5 by 2.5 kms
Tenement
10430
5 by 5 kms
Bekisopa 2020 Drilling Results - Summary
High-Grade Fe results,
at surface and depth.
Grades from 67.67%Fe
to typically +25% within
the mineralised zone.
Surface weathered zone
of 5 to +15m
Significant high-grade
intersects from surface
HIGHLIGHTS
✓ 6.9m @ 64.7%Fe at surface
✓ 13.6m @ 63.5%Fe,
✓ 25.2m @ 61.4%Fe,
✓ 70.5m @ 44.1%Fe continuous
iron mineralization from surface
✓ Significant iron mineralization
along 4km strike confirmed
INDICATES
Scope
for a major
iron resource
at Bekisopa,
initial
target ~150Mt.
✓ Iron mineralized zone up to
+200m combined true thickness
10
3 Types of Iron Mineralisation – Weathered Massive at Surface
Weathered Massive Iron Mineralisation
Bekisopa Drill Hole 1
Northern area of Tenement 10430
Surface to 6.5m
Grade - 63.98% Iron
Bekisopa Drill Hole 10
Southern area of Tenement 10430
Surface to 4m
Grade – 59% Iron
11
3 Types of Iron Mineralisation - Massive
Massive Iron Mineralisation
Bekisopa Drill Hole 9
Southern area of Tenement 10430
Depth - 42.6 to 46.4m
Grade – 61.2% Iron
Bekisopa Drill Hole 10
Southern area of Tenement 10430
Depth - 32.4 to 36.3m
Grade – 63.25% Iron
12
3 Types of Iron Mineralisation – Coarse Disseminated
Coarse Disseminated Iron Mineralisation
Bekisopa Drill Hole 1
Northern area of Tenement 10430
Depth - 56.7 to 60.5m
Grade – 44.6% Iron
Bekisopa Drill Hole 3
Central area of Tenement 10430
Depth - 34.4 to 37.3m
Grade – 42.3% Iron
13
2021 Drill Core shows similar Iron Mineralisation & Magnetic
Susceptibility readings
Weathered Massive Iron Mineralisation
Bekisopa 2021 Drill Hole 33
Southern area of Tenement 10430
Surface to 3.9m
Grade – TBC% Iron
Massive Iron Mineralisation
Bekisopa 2021 Drill Hole 38
Southern area of Tenement 10430
Depth - 50.8 to 54.5m
Grade – TBC% Iron
14
Bekisopa Drill Hole BEKD01 – Northern Zone
Cross Section – (Only vertical drill hole)
BEKD01 – Surface to 5m
Weathered Massive - 63.5%Fe
BEKD01 – 58 to 60m
70.5M CONTINUOUS IRON MINERALIZATION
FROM SURFACE, IDEAL OPEN PIT MINING,
Iron mineralization continues at depth
Coarse Disseminated - 49.8%Fe
15
Bekisopa Drill Holes BEKD09 to 43 – Southern Zone
Cross Section
High-grade weathered surface iron mineralisation, 135m continuous iron mineralisation down hole
Cross strike width of +650m
Low stripping ratio mining
16
Bekisopa Iron 2020 assay results – Weathered Massive Zone
Highest Iron Content
67.67%
BEKD11 Weathered Massive 0 to 18.9m
Surface to 6.9m
58.6%Fe
Surface Weathered Zone;
Averages across all 12 holes
Top 5m average 52.5%Fe
6.9 to 12.9m
58.6%Fe
5 to 10m average 44.7%Fe
Top 15m average 47.9%Fe
12.9 to 18.9m
63.6%Fe
17
Bekisopa Drill Core – 2020 Processing Test Results
Composites were crushed to 2mm and Processed using wLIMS – excellent results.
First Trials, No Optimisation!
Weathered Massive Mineralisation achieved:
Massive and Coarse Mineralisation achieved:
67%Fe product grade
62.8%Fe avg product grade
Head Grade = 60%Fe, Fe Recovery = 84%, Mass Yield = 75%
Head Grade = 58%Fe, Fe Recovery = 91%, Mass Yield = 79%
Clean Weathered
looking product
with low
0.04%Phos
2.7% Silica
1.2% Alumina
Clean Metallic
looking product
(averages)
66.9%Fe
66.5%Fe
Outstanding Quality – High-grade Fines products
18
Crush Trials show that a 3mm crush delivers Benchmark Grade
Bekisopa Iron Product Grade % V Crush Size mm
Product Grade - % Iron
68
67
Met20 - Iron
Met22 - Iron
Average - Iron
66
65
64
63
62
61
60
-3
-2
-1.5
-1
-0.5
Crush Size - (Minus X mm)
Crushing trials, from minus 3mm down to minus half a mm, show that the iron product grade increases
with a finer crush and impurity levels are reduced, as expected.
19
Bekisopa’s 2020 Drilling Results – Excellent
Drilling Results
Process Trials
Bekisopa Resource
✓Excellent assays;
Crushed minus 2mm and
wLIMS, Product Grades
Scope for a
significant resource
High-grade iron
✓Surface Zone;
7m at 65%Fe
✓Mineralisation at depth
+100m
✓Up to 68%Fe
✓67%Fe from Weathered
Initial Target ~150Mt Resource
Massive Iron
✓+62.8%Fe from Massive
& Coarse Disseminated Iron
✓Low impurity levels
✓Capable of readily
producing High-Grade
iron ore products.
20
Bekisopa’s 2021 Drilling Campaign - Exceptional
~4,500m of diamond drilling planned with 2,750m completed.
• Drilling commenced on June 13, plan to be finished by October 31st
• Intercepting iron mineralisation at surface and depth up to 185m, down hole
• Defining mineralisation widths of +650m and along 5kms of the main strike length
• Assaying commenced at ALS Iron Ore Technology Centre in Perth.
Objective to deliver an initial ~150mt resource estimate
reportable under JORC guidelines by the end of 2021, if no
interruptions to drilling, analysis and resource estimation.
21
Anticipating 3 Products from Bekisopa Iron Mineralisation
Outcrop
Lump and Fines
Hematite (~66%Fe) and
Magnetite (~68%Fe)
Surface Weathered Massive Iron
High-Grade +65%Fe Fines.
Massive and Coarse Disseminated
+62%Fe Fines.
66.9%Fe
63.4%Fe
22
AKORA Resources – Corporate (at 31 August 2021)
CORPORATE STRUCTURE
Current AKORA Ordinary Shares on Issue
Unlisted Options (strike price 30c, 15 months
to expiry)
Market Capitalisation (@ $0.25 per share)
Cash (as at 31 August)
Enterprise Value
61,036,722
10,832,016
$18,126,180
$2,867,000
$15,259,180
MAJOR SHAREHOLDERS
Evanachan Ltd
Baker Steel Resources Trust
Mackenzie Financial
Directors & Management
12.7%
8.3%
6.2%
5.9%
Top 20 Shareholders
60.7%
AKORA Resources – Board and Management
Michael Stirzaker – Non- Executive Chairman
▪ 30+ years commercial experience; most recently Partner with Pacific
Road Capital, Finance Director-Finders Resources Limited, Joint
Managing Director RFC Group Limited. Extensive experience in the
mining sector as investor, financial adviser and company director
▪ Current board positions include Firestone Diamonds PLC, Prodigy Gold
NL and Base Resources - Madagascan mineral sands development
John Madden - Chief Financial Officer
▪ 35+ years experience. 22 years across Rio Tinto Finance and Business
Analysis including Freeport (Irian Jaya), Morobe Consolidation Goldfields,
Indophil Resources NL, Ok Tedi Mining. Founding Director of Akora
Resources
Paul Bibby – Managing Director
▪ 35+ years experience. 24 years with Rio Tinto including senior roles at
Hamersley Iron and Kaltim Prima Coal Project (Indonesia). Other notable
experience includes Zinifex (General Manager), Nyrstar (Chief
Development Officer), OceanGold (CEO) and as CEO of ASX listed gold
and silver producers
Stephen Fabian - Non-Executive Director
▪ 25+ years of experience. Previous roles with County Natwest, Ferrous
Resources, South American Ferro Metals
▪ Chairman of Brazil Tungsten and adviser to Baker Steel Resources Trust
23
Average Grade 63.5% Iron
Management
VERT Capital
Paul Bibby
Managing Director
paul.bibby@akoravy.com
Petar Tomasevic
Director
petar@vertcapital.com.au
John Madden
Chief Financial Officer
john.madden@akoravy.com
VERT Capital
Level 2, 681 Murray Street
West Perth WA 6005
Harbury Advisors
AKORA Resources
211 McIllwraith Street
Princes Hill
Melbourne, Victoria 3054
ASX: AKO
Matthew Lindh
Director,
mlindh@harbury.com.au
Level 3, 175 Collins Street
Melbourne, Victoria 3000
www.akoravy.com
Competent Persons Statements
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related scientific and technical information, is based on,
and fairly represents information compiled by Mr Antony Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He
is a shareholder in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years prior to being engaged as a consultant.
Mr Truelove is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM) and a Member of the Australian Institute of
Geoscientists (MAIG). Mr Truelove has sufficient experience which is relevant to the styles of mineralisation and types of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Truelove consents
to the inclusion in this report of the matters based on his information in the form and context in which it appears including sampling, analytical and
test data underlying the results.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical information, is based on, and fairly represents
information compiled by Mr Paul Bibby. Mr Bibby is a Metallurgist and Managing Directors of Akora Resources Limited (AKO), as such he is a
shareholder in Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr Bibby has
sufficient experience which is relevant to the styles of mineralisation and its processing under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and mineral processing results.
25
Share your feedback
Discover