Change of Share Registry Address
Released
Released
Announcement PDF
Akora Resources Limited
PO Box 28
Ballarat Victoria 3350
Australia
info@akoravy.com
ACN 139 847 555
ASX: AKO
akoravy.com
14 April 2025
ASX RELEASE
Change of registry address notification
In accordance with ASX Listing Rule 3.15.1 and with effect from 14 April 2025, the Sydney office of our
registry, MUFG Corporate Markets (AU) Limited, is moving to:
MUFG Corporate Markets (AU) Limited
Liberty Place
Level 41
161 Castlereagh St
Sydney NSW 2000
Telephone numbers and postal address remain unchanged.
This announcement has been authorised by Akora Resources Limited’s Board of
Directors.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Gareth Quinn
Investor Relations
Phone +61(0) 417 711 108
gareth@republicpr.com.au
Iron ore for tomorrow’s steel making
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development of four
high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (Mt) Inferred JORC Resource
(ASX Announcement 11 April 2022) with very low impurities able to produce a premium-priced +68% Fe
concentrate. Direct Reduced Iron-Electric Arc Furnace technology which is used to make greener steel
without coal and considerably less carbon emissions requires iron ore grades of at least 67%.
(ASX Announcement – Bekisopa Scoping Study, 14 November 2023)
To generate cash in the near-term, AKORA is advancing plans at Bekisopa for a Stage1, 2Mt per annum
Mine with a six year life of mine, producing 61.6% Fe average grade lump and fine direct shipping ore
(DSO) for shipping to Blast Furnace steelmakers.
(ASX Announcement - Bekisopa Pre Feasibility Study, 31 March 2025)
The Company confirms that it is not aware of any new information or data that materially affects the above and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have
not materially changed.
And further the Company confirms that all material assumptions underpinning the 2Mt per annum production target continue to apply
and have not materially changed.
2
Share your feedback
Discover