BEKISOPA POTENTIAL DSO TONNAGE INCREASES WITH DRILLING
AKORA Resources (“AKORA” or “the Company”) (ASX Code: AKO) is pleased to provide
shareholders with the second 2021 assay report from resource drilling at Bekisopa. These
assays cover the next nine shallow BEKD30 to BEKD39, <100m, drill holes in the southwest,
very south, and central area on the main tenement PR10430. The results continue to show a
near surface high-grade weathered massive iron zone of potential Direct Ship Ore (DSO), and
significant iron mineralisation at depth.
Highlights:
➢ Very high-grade iron levels from surface, with low impurities:
8.2m at 68.2% iron, 1.4% silica, 1,6% alumina (BEKD31)
4.5m at 65.5% iron, 3.7% silica, 2.7% alumina (BEKD33)
9.2m at 64.5% iron, 3.3% silica, 1.0% alumina (BEKD32)
69.3% iron the highest 1m assay interval result.
➢ These very high-grade surface intercepts, greater than the
Benchmark 62%Fe grade, indicate potential for DSO
➢ Drilling and assay results continue to show the potential for mining
high-grade DSO lump and fines, +62% iron, initially from the outcrop
and then from within the expansive near surface very high-grade
weathered massive iron zone.
➢ 62% high-grade iron assays at depths to 80m downhole, BEKD38.
1|Page
Second Bekisopa 2021 Assay Results
The second phase of shallow drilling, <100m, in the 2021 drilling campaign was designed to
understand the iron mineralisation extent to the southwest in an area of high magnetic
intensity; in the very south; and in the central areas of the main Bekisopa tenement 10430.
The drill hole locations are shown in Appendix 1, Figure 1A. All 9 drill holes intercepted iron
mineralisation from surface, with 7 of the holes intercepting iron mineralisation to depths of 80
metres.
The following drill core sequences, Figures 1 to 5, show high to very high-grade weathered
massive iron zones at surface, with average iron grades of 62% to 67% reported. This highgrade weathered massive iron mineralisation, down to at least 10m has the potential to form
the first phase of mining activities due to its characteristics being equivalent to DSO with
average head grades across these drill holes being equal to or better than Benchmark 62%Fe
with low impurity levels averaging; 5.2% SiO2, 2.8% Al2O3, 0.11% P and 0.04% S.
67.8%Fe
68.5%
68.5%
69.3%
67.5%Fe
67.9%
67.2%
Figure 1.
69.3% iron intercept at 3.41 to 4.41m in drill hole BEKD31 in the southwest area part of a continuous 8metre weathered massive iron intercept from surface, averages 68.2%Fe, very high-grade iron ore.
2|Page
54.9%Fe
64.6%
64.1%
67.5%
Figure 2.
67.5% iron intercept from 2.6 to 3.5m in drill hole BEKD32 in the southwest, part of a continuous 5-metre
weathered massive iron intercept from surface, averages 62.8%Fe high-grade iron ore.
64.2%Fe
67.1%
66.1%
65.7%
Figure 3.
67.1% iron intercept from 0.9 to 1.8m in drill hole BEKD33 in the southwest part of a 5-metre weathered
massive iron intercept from surface, averages 65.5%Fe very high-grade iron ore.
61.8%Fe
61.2%
61.9%
Figure 4.
Drill hole BEKD36 in the south of the six-kilometer strike averages 62%Fe over a 10 metre interval
from surface, high-grade iron ore.
3|Page
Drill Hole BEKD34 From Surface
64.8%Fe
61.5%
64%
55.9%
55.2%Fe
64.8%
64.1%
61.4%
Drill Hole BEKD34 at Depth 23.5 to 27.2m
64%Fe
63.4%
59.8%
65%
64.8%
Figure 5.
Drill hole BEKD34 averages 60% iron from surface to 10m and then at depths of 15 to 33m averages 53%
iron with 24 to 29m averaging 63.4% iron, high-grade iron levels.
4|Page
62.9% Fe
55.6% Fe
61.2% Fe
55.5%Fe
54.6%
48%
30.4%
63.3%Fe
62.4%
64.5%
57.4%
50.7%Fe
51.8%
57%
60.4%
Figure 6.
56% iron average grade at depth from 24.6 to 38.9m in drill hole BEKD35 in the southwest.
Processing trials have shown this iron mineralisation type readily upgrades to ~65%Fe at a 2mm crush.
5|Page
50.7%Fe
60.6%
53.3%
59%
32.6%Fe
56%
56.1%
66%
61.3%Fe
61.6%
61.9%
Iron Mineralisation ends at 79.7m down hole.
Figure 7.
High-grade iron mineralisation at depth in drill hole BEKD38. 56% iron average grade at depth from 62 to
65.7m and then 53% iron from 73.5 to 79.7m when the iron mineralisation ends. Processing trials have
shown this iron mineralisation type readily upgrades to ~65%Fe at a 2mm crush.
The major iron interval results for dill holes BEKD35 and BEKD38 are reported in Appendix 1.
The assay results in Figures 6 and 7 show very encouraging near surface mineralisation with
head grades ranging from 35%Fe to 69%Fe, the higher grades near surface, across the
weathered zone. At depth, head grades within the expected iron mineralisation zones are as
high as 67.7%Fe, as seen in drill holes BEKD34, BEKD35 and BEKD38 in Figure 5, 6 and 7.
The 2021 assays set out in this and ASXAnnouncement, dated 19 October 2021, continue to
generate what the Company achieved with its 2020 exploration programme, with excellent
high to very high iron grades in assay results, particularly in the expansive weathered zone
along and across strike. The Company believes that the very high-grade near surface
mineralisation may not require processing and accordingly, could potentially achieve a
6|Page
+62%Fe product from simple crushing and screening. It is this +62%Fe product that may be
classified as DSO. Processing trials, at a 2mm crush and wLIMS, readily upgraded lower
grade weathered zone composites from 61%Fe to a 66.9%Fe fines product (see ASX
Announcement 27 April 2021).
Seven of these 9 shallow drill holes also intercepted iron mineralisation at depth, see Figures
5, 6 and 7, which shows massive iron mineralisation at a depth of 30, 40 and 80 metres
downhole. When compared to 2020 assay results and processing trials, on similar iron grades
and mineralisation, this iron mineralisation at depth would be expected to readily upgrade to
better than Benchmark grade 62% iron ore fines.
The following sequence of cross-sections combine the 2020 drill hole intercepts with these
2021 shallow drill hole intercepts and show developing widths across strike of high-grade near
surface iron mineralisation, in the northern and southern areas where drilling has been
undertaken.
Cross Section 8000N in the south of Tenement 10430
Figure 8.
2021 drill holes BEKD32 and BEKD33 showing very high-grade iron mineralisation at surface, in these
southwestern extent holes. Yet to receive the assay results for the other 2021 drill holes BEKD44 and
BEKD45, these holes show a +650 metre cross section across strike with potential for significant
resource tonnage and a potentially low strip mining operation.
7|Page
Figure 9.
2021 drill holes BEKD14, BEKD34 and BEKD35 showing high-grade iron mineralisation at surface and at
depth, these holes show a +650 metre cross section across strike with potential for significant resource
tonnage and a potentially low strip mining operation.
Figure 10.
2021 drill holes BEKD30 and BEKD31, in the southwestern area, showing very high-grade iron
mineralisation at surface BEKD31, 8.2m at 68.2%Fe. This near surface very high-grade iron
mineralisation is potentially DSO
Cross sections 8000N and 8150N, Figures 8 and 9 above, show that the iron mineralisation
forms a wide +650 metre, open synformal structure, with the eastern and western zones
forming the eastern and western ends of the synform. These two cross sections are in the
southern area of this broader drill grid, refer Figure 1A in Appendix 1, and extend over 150
8|Page
meters north south. This should provide considerable tonnage potential in the southern area
and a potentially low strip-mining operation.
As the drill grid in the southern area is completed, it will cover some 650 metres, east to west,
and 550 metres, north to south, it is considered likely that a substantial resource tonnage will
be defined at what look to be relatively high iron grades. From the cross sections above,
Figures 8 to 10, in the southern area there are high to very high-grade iron intercepts from
surface from east to west across strike that are potentially DSO. These high to very highgrade iron surface intercepts in this southern area include:
BEKD31 – 8.2m at 68.2%Fe
BEKD32 – 5.4m at 61.6%Fe
BEKD33 – 4.5m at 65.5%Fe
BEKD34 – 9.4m at 59.7%Fe
BEKD36 – 9.9m at 60.4%Fe
BEKD39 – 5.8m at 60.4%Fe, these represent potentially DSO lump and fines with low
impurities.
Conclusion
As at the date of this announcement, the Company has completed 27 shallow diamond drill
holes, with the first 18 drill hole assay results reported in the ASX Announcement on 19
October 2021 and 9 drill holes in this announcement. The assays show very high-grade iron
contents from 69.3% to 35% (higher grades generally closer to the surface) within the
weathered massive iron zone potential for significant tonnages of DSO.
Expectation is that this zone of very high-grade weathered iron at plus 62%Fe may be able to
be mined, crushed, and screened to produce high-grade lump and fines DSO products. This
in conjunction with the known outcropping iron ore, where rock chips showed an average iron
grade of 66.7%, could be the focus for an initial mining phase, with 10 years production at 3
to 5 million tonnes per year, producing high-grade lump and fines products.
As well as highlighting the weathered massive iron zone, several holes also intercepted iron
mineralisation at depth with excellent readily upgradable iron grades and therefore, confirm
potential for a significant iron resource. The interpreted broad open synform in the southern
area means that the southwestern and southeastern zones are continuous under shallow
cover and hence significant tonnage potential can be seen.
Bekisopa Drilling – October
Deep hole drilling is completed in the north which shows several holes intercepting iron
mineralisation beyond 200m. Drilling has recommenced in the southern area to complete
planned holes designed to extend that drill grid width and length adding tonnage to the
Bekisopa mineral resource estimate. Eleven deep holes have been completed with nine
remaining with some holes extending to 250m down hole into iron mineralisation.
9|Page
Drilling Progress Reporting and Communication
The cycle of drilling, logging, preparation then dispatch to ALS Perth is progressing leading to
a proposed JORC Resource estimation by years end; assuming the drilling equipment, sample
preparation, international logistics and resource estimation continues to plan.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About AKORA Resources
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa Project, the Tratramarina Project and the Ambodilafa Project,
iron ore projects in Madagascar, in all totaling some 308 km2 of tenements across these three
prospective exploration areas. Bekisopa Iron Ore Project is a high-grade magnetite iron ore
project of >4km strike and is the key focus of current exploration drilling and resource
modelling.
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related
scientific and technical information, is based on, and fairly represents information compiled by Mr
Antony Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He is a
shareholder in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years
prior to being engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of Mining
and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG). Mr
Truelove has sufficient experience which is relevant to the styles of mineralisation and types of deposits
under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the matters based
on his information in the form and context in which it appears including sampling, analytical and test
data underlying the results.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Directors of Akora Resources Limited (AKO), as such he is a shareholder in
Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its
processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and
mineral processing results.
Authorisation
This announcement has been authorised by the AKORA Resources Board of Directors on 2
November 2021.
10 | P a g e
Appendix 1
Figure 1A.
The location of the nine shallow drill holes of the 2021 drilling campaign reported in this Announcement,
each labelled above on the main Bekisopa tenements.
Significant Iron Intercepts
Assay results drillholes BEKD31 to BEKD39 from the 2021 drilling campaign have now been
received and compiled and show the following significant iron intercepts:
Note: Bold text represents overall intercepts, normal text sub-intercepts; blue text intercepts averaging over 50% Fe.
Hole
Number
From
(m)
To (m)
Interval
(m)
Fe
(%)
SiO2
(%)
Al2O3
(%)
P (%)
S
(%)
Comments
BEKD31 0.0
incl. 0.0
10.45
8.19
10.45
8.19
58.7
68.2
8.9
1.4
5.3
1.6
0.06
0.06
0.01
0.01
Weathered Massive Iron
BEKD32
incl.
and
and
0.0
0.0
10.25
23.22
21.13
5.41
19.41
25.1
21.13
5.41
9.16
1.12
54.9
61.6
64.5
59.1
5.1
7.1
3.4
4.3
1.6
3.1
1.1
1.1
0.01
0.04
0.16
0.21
0.02
0.00
0.04
0.07
Weathered Massive Iron
BEKD33
0.00
25.28
25.28
55.2
8.9
2.0
0.13
0.05
Weathered Massive and
incl.
0.00
4.50
4.5
65.5
3.7
2.7
.05
0.00
Weathered Massive Iron
Weathered Massive Iron
Massive Iron Mineralisation
Massive Iron Mineralisation
Massive Iron Mineralisation
11 | P a g e
Weathered Massive Iron
and
8.30
16.25
7.95
63.4
5.8
1.2
0.12
0.00
Massive Iron Mineralisation
BEKD34
0.00
34.80
34.80
53.0
7.9
1.6
0.19
0.25
Weathered Massive and
incl.
0.00
9.43
9.43
59.7
7.0
2.3
0.31
0.00
Weathered Massive Iron
BEKD35
and
incl.
0.00
12.08
30.89
2.00
44.26
34.70
2.00
32.18
3.81
33.0
37.7
63.7
30.7
17.3
1.3
11.5
2.4
1.6
0.05
0.13
0.22
0.00
0.11
0.14
Weathered Massive Iron
BEKD36
0.00
18.77
18.77
42.7
19.9
6.4
0.10
0.12
Weathered Massive and
incl.
1.00
10.90
9.90
59.3
2.9
2.0
0.13
0.18
Weathered Massive Iron
BEKD37
and
0.00
28.86
14.05
37.45
14.05
8.59
28.7
34.6
28.3
18.3
5.4
3.2
0.06
0.08
0.01
0.58
Weathered Massive Iron
BEKD38
0.00
10.00
10.00
20.6
41.1
6.7
0.03
0.02
Weathered Coarse
Disseminated Iron
and
and
incl.
25.09
50.49
75.90
40.62
79.7
79.70
15.53
29.21
3.80
17.4
48.8
64.1
32.9
10.1
2.2
4.2
1.7
0.9
0.10
0.13
0.04
0.02
2.85
2.26
Coarse Disseminated Iron
Massive Iron Mineralisation
Massive Iron Mineralisation
BEKD39
0.00
19.70
19.70
41.8
20.5
4.4
0.06
0.00
Weathered Massive and
incl.
and
and
0.00
48.78
75.57
5.76
62.85
81.76
5.76
14.07
6.19
60.4
29.7
38.2
7.5
22.1
16.8
4.6
2.1
2.8
0.03
0.11
0.10
0.00
1.90
2.61
Massive Iron Mineralisation
Coarse Disseminated Iron
Massive Iron Mineralisation
Coarse Disseminated Iron
Coarse Disseminated Iron
Coarse Disseminated Iron
Weathered Massive Iron
Massive Iron Mineralisation
Coarse Disseminated Iron
(Note: Bold represents overall intercepts, sub-intercepts normal text; blue text highlights intercepts averaging
over 50% Fe)
12 | P a g e
JORC Code
Table 1 Section 1 Sampling Techniques and Data
BEKISOPA PROJECT
Criteria
Sampling
techniques
Drilling
techniques
13 | P a g e
JORC Code explanation
• Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g., ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (e.g., core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g., core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit, or
other type, whether core is oriented and if so, by
what method, etc).
Commentary
• Diamond core (HQ or NTW) is split in half using a core saw or splitter (if clayey or
rubbly). A consistent half of the core is broken with a hammer and bagged prior to
dispatch to the preparation laboratory in Antananarivo. Sample interval is
nominally 1m down hole but with samples terminated at lithological boundaries.
• All drilling is diamond core drilling using either NTW (64.2mm inner diameter) or
HQ (77.8mm inner diameter) coring equipment. The holes are generally collared
using HQ and changed to NTW between 3m and 25m downhole. Core is not
orientated. All drillholes are surveyed every 10m using a Reflex EZ-Gyro
gyroscopic multi-shot camera. No surveys to date have varied more than 5° from
the collar survey in either azimuth or declination.
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
14 | P a g e
JORC Code explanation
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Commentary
• Average core recovery is 97% but may be lower in the rubbly part of the
weathered zone. Several one metre intervals returned low recoveries due to
rubbly material. All other intervals gave good recovery, with close to 100% in
fresh rock.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality, and
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• All core was fitted together so that a consistent half core could be collected,
marked up with a “top” line (line perpendicular to dip and strike, or main foliation),
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• During drilling, checks and verifications of the accurate measurement of
penetration depth of drill hole cores were made and observations and recording of
the colour of the water / mud rising from the drill hole were made.
• All drill core was logged quantitatively using industry standard practice on site in
enough detail to allow mineral resource estimates as required.
• Logging included: core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally magnetite or
hematite), mineralisation style, mineralisation %, structure, magnetic susceptibility
(see below), pXRF readings (see below), notes (longhand).
• All core was photographed both wet and dry and as both whole and half core.
• All core was geotechnically logged and RQD’s calculated for every sample
interval.
• All drill-holes were logged using a magnetic susceptibility meter to enable
accurate distinction of iron (magnetite) rich units and to potentially differentiate
between magnetite and hematite rich mineralisation.
• Density measurements were made using both the Archimedes method (mainly
fresh rock) and the Caliper Vernier (mainly regolith) methods.
Criteria
JORC Code explanation
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
15 | P a g e
Commentary
sample intervals decided and marked up and the core subsequently split in half
using a core saw, separating samples into the marked-up intervals. If the core
was clayey or rubbly, it was split in half using a hammer and chisel. The intervals
were nominally 1m, but smaller intervals were marked if a change in geology
occurred within the 1m interval.
• The half core sample intervals were put into polythene bags along with a paper
sample tag. This was then sealed using a cable tie and placed into a second
polythene bag with a second paper tag and this was sealed using staples.
• The samples were subsequently transferred at regular intervals to the sample
preparation facility in Antananarivo (OMNIS) where they will undergo the following
preparation:
o Sorting and weighing of samples
o Drying at 110-120°C until totally dry
o Weighing after drying
o Jaw crushing to 2mm
o Riffle split and keep half as a reference sample
o Collect a 100g sub-sample of 80% passing 2mm material and store
this
o Pulverise to minus 75 micrometres
o Clean ring mill using air and silica chips
o Riffle split and sub-sample 2 sets of 100g pulps
o Store reject pulp
o Conduct a pXRF reading on the minus 75 micrometre pulp
o Weigh each of the sub-samples (minus 2mm, 2 x minus 75
micrometres) and store in separate boxes for ready recovery as
needed
• All assays have been undertaken by ALS in Perth, Australia, using their standard
iron suite. QAQC includes standards, blanks, and duplicates. These are all within
tolerance limits.
Criteria
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
16 | P a g e
JORC Code explanation
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing, and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Commentary
• As this is the first drilling into the project, no twinning is necessary. All data is
entered on site and checked by consultants Vato Consulting before being entered
into an Excel database and sent to Akora.
•
All drill hole collars have been provisionally located using a hand-held GPS (+/-5m
accuracy). Final collars will be picked up at completion of the drilling program.
• All 2020 and 2021 drillholes have been surveyed using DGPS.
• The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
• Topographic control is country wide data only. An accurate topographic survey
will be undertaken prior to any resource estimation.
• Data spacing is planned to be at 200m x 50m drill spacing which is considered
reasonable for the style of mineralisation being intersected. In several areas with
significant surficial mineralisation, drill-hole density has been closed up to 100m x
50m.
• All samples are assayed as individual, less than 1m long intervals. Composites of
selected intervals will be tested using wet and dry, low intensity magnetic
separation (LIMS).
• The ironstone unit has a strong north-south trend and drilling is generally oriented
to the east. The outcrops, trenches and magnetics all show a steep to shallow
westerly dip and hence the drill direction is considered to be optimal. The drilling
in the south was interpreted as being synclinal in nature with tonnage potential
limited to the keel of the syncline. However, it has been found that the structure is
an orocline and that mineralisation continues at depth in this area. Mineralisation
in the SW zone appears to be sheet-like at present but additional drilling is
required to confirm the true morphology in this location. A single hole oriented to
Criteria
JORC Code explanation
Commentary
the west in the far south of the tenement suggests the sequence is dipping to the
east here, suggesting an anticlinal structure in this area.
• No sample bias is evident.
Sample
security
• The measures taken to ensure sample security.
• Chain of Custody procedures are implemented to document the possession of the
samples from collection through to storage, customs, export, analysis, and
reporting of results. Chain of custody forms are a permanent records of sample
handling and off-site dispatch.
• The on-site Geologist is responsible for the care and security of the samples from
the sample collection to the export stage. Samples prepared during the day are
stored in the preparation facility in labelled sealed plastic bags.
• The Chain of Custody form contains the following information:
• Sample identification numbers;
• Type of sample;
• Date of sampling;
• List of analyses required;
• Customs approval;
• Waybill number;
• Name and signature of sampling personnel;
• Transfer of custody acknowledgement.
• Samples are delivered to the analytical laboratory by courier. A copy of the Chain
of Custody form is signed and dated and placed in a sealable plastic bag taped on
top of the lid of the sample box. Each sample batch is accompanied by a Chain of
Custody form.
• One box of samples was incorrectly sent to ALS Ireland and one to ALS Perth
rather than the other way around. The laboratory subsequently sent the one box
from Ireland to Perth and the box incorrectly sent to Perth was assayed in Perth.
No tampering of either of these boxes was observed.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• No audit has been conducted.
17 | P a g e
JORC Code
Table 1 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Mineral
tenement
and land
tenure
status
JORC Code explanation
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Commentary
• The Company completed the acquisition of the minority interest in Iron Ore Corporation of
Madagascar sarl held by Cline Mining Corporation on 5 August 2020.
• The Company holds through Iron Ore Corporation of Madagascar sarl, Universal Exploration
Madagascar sarl and a Farm-in Agreement 12 exploration permits in three geographically
distinct areas. All administration fees due and payable to the Bureau du Cadastre Minier de
Madagascar (BCMM) have been and accordingly, all tenements are in good standing w
Share your feedback
Discover