31 December 2025 Quarterly Activities & Cashflow Report
Released
Released
Announcement PDF
1
For the quarter ended 31 December 2025
Quarterly
Report
For the quarter ended
31 December 2025
AKORA Resources Ltd
ABN 90 139 847 555
ASX Code: AKO
www.akoravy.com
AKORA is advancing its Stage 1
high-grade Direct Shipping Iron
Ore (DSO) project in
Madagascar, where studies
indicate strong margins with low
upfront capital and operating
costs.
Future plans see the potential
development of a premium priced
high grade iron concentrate to
support the Green Steel (low
carbon emissions) initiatives.
• Bekisopa high-grade iron ore project
exploration trenching program successfully
completed.
• Bekisopa Mining Permit Application submitted
for its Stage One Direct Shipping Ore (DSO)
project.
• New Madagascar Leadership Recognises the
Importance of the Bekisopa Project.
Highlights
2
For the quarter ended 31 December 2025
Key Activities and Highlights for the Quarter
At the Bekisopa high-grade iron ore Project.
Exploration trenching Program successfully completed
AKORA has now completed its most recent round of exploration at the Bekisopa high-grade direct shipping
ore (DSO) project (ASX Announcement 12 November 2025). Work included surface mapping and the
excavation of 339 metres of trenching in areas that showed positive signs of surface iron mineralisation.
The mapping of one historical trench and some pits across the Bekisopa tenement areas 1 and 2 have
also been completed (Figure 1). These historical excavations were completed by the French Geological
Society in the 1950’s and 1960’s. While some non-compliant assay results exist for these locations,
AKORA undertook to verify the locations, clear and inspect the visual mineralisation and take up-to-date
GPS coordinates for future reference. Further to this work, surface outcrop mapping of likely DSO has
been completed to add further detail to the site geological model and to support future exploration and
mining activities.
The exploration program focused on the zone between the Southern and Central resource zones. This
area, of approximately 1.5 kilometres strike length, has a significant number of historical exploration pits.
Areas 1 and 2, as per Figure 1 below, were selected for the trenching program based on surface magnetic
mapping and the surface visual indications of likely outcropping high-grade DSO.
Figure 1 - Bekisopa Exploration Plan Areas 1 and 2
3
For the quarter ended 31 December 2025
Figure 2 - Surface Magnetic Map Showing Areas 1 and 2
Surface mapping was completed over two areas identified north of the Southern Zone at Bekisopa and a
total of 0.31 sq km were mapped. Within Area 1, several magnetite-hematite outcrop zones were identified.
Trenching
The trenching program was designed as a low cost opportunity to explore some of the potential surface
outcropping iron mineralisation that is evident across the Bekisopa tenement and that currently sits outside
of the JORC defined resource areas. Depending on the results of the trenching program, it is possible
that some resource extension may be possible from this exploration program. At a minimum, defining
4
For the quarter ended 31 December 2025
areas of potential mineralisation across the surface of the tenement will provide valuable information for
any future exploration programs and future operations.
Trenching was completed within the two areas as detailed in Figure 4 and Figure 5. A total of eight trenches
were completed and 338.7 metres were manually excavated to a maximum of 2 metres depth. Within Area
1 seven trenches (BEKT001, BEKT002, BEKT003, BEKT004, BEKT006, BEKT007 and BEKT008) were
completed and within Area 2 one trench (BEKT005) was completed. These figures also show the location
of the historical trenches and pits that were identified and the surface geological profile.
Trenching coordinates are detailed as follows:
Trench_ID Utm38sX Utm38sY Elev_m Length_m Azm_deg Inc_deg
BEKT001 586,868 7,609,122 870 36.00 42 0
BEKT002 586,796 7,609,269 855 87.40 79 0
BEKT003 586,837 7,609,186 865 20.10 90 0
BEKT004 586,905 7,609,085 870 30.00 90 0
BEKT005 586,613 7,608,652 848 42.70 81 0
BEKT006 586,898 7,609,268 860 30.00 90 0
BEKT007 586,930 7,609,167 869 31.50 90 0
BEKT008 586,899 7,609,023 866 61.00 83 0
All trenches intersected iron mineralisation with lithologies comprising massive magnetite-hematite,
saprock of magnetite-hematite and saprock of magnetite-bearing gneisses. This lithology is important for
Direct Shipping Iron Ore (DSO).
Figure 3 (LHS) Massive Magnetite/Hematite at Trench BEKT006 (4.5 to 11.5m)
(RHS) Massive Magnetite/Hematite at Trench BEKT007 (6.0 to 18.5m)
5
For the quarter ended 31 December 2025
Figure 4 - Area 1 Trenching Layout
6
For the quarter ended 31 December 2025
Figure 5 - Area 2 Trenching Layout
Trench geological logging identified the following lithological details from the exploration program.
Trench ID
From
(metres)
To
(metres)
Interval
(metres)
Lithology Magnetic Susceptibility 10-3SI
BEKT001 0.00 3.00 3.00 Saprock Hematite-Magnetite 90-758
3.00 5.00 2.00 Massive Hematite-Magnetite 109-729
5.00 12.50 7.50 Saprock Hematite-Magnetite 61-560
12.50 14.50 2.00 Massive Hematite-Magnetite 165-757
14.50 16.80 2.30 Saprock Magnetite-Hematite 486-1000>
16.80 17.70 0.90 Massive Magnetite-Hematite 901-1000>
17.70 36.00 18.30 Saprock Magnetite-Hematite 508-1000>
BEKT002 0.00 5.50 5.50 Saprock Magnetite-Hematite 197-751
5.50 13.70 8.20 Saprock Magnetite-Gneiss 588-1000>
13.70 19.00 5.30 Saprock Magnetite-Hematite 647-1000>
19.00 21.00 2.00 Saprock Magnetite-Gneiss 448-830
21.00 28.00 7.00 Saprock Magnetite-Hematite 448-1000>
28.00 40.60 12.60 Saprock Magnetite-Gneiss 239-823
40.60 42.00 1.40 Saprock Magnetite-Hematite 321-887
42.00 51.80 9.80 Saprock Magnetite-Gneiss 129-877
51.80 57.00 5.20 Saprock Magnetite-Hematite 236-1000>
57.00 59.00 2.00 Massive Magnetite-Hematite 511-1000>
59.00 60.20 1.20 Saprock Magnetite-Hematite 475-803
60.20 61.00 0.80 Massive Magnetite-Hematite 503-1000>
7
For the quarter ended 31 December 2025
61.00 71.50 10.50 Saprock Magnetite-Hematite 592-1000>
71.50 72.20 0.70 Massive Magnetite-Hematite 634-1000>
72.20 86.00 13.80 Saprock Magnetite-Hematite 619-1000>
86.00 87.40 1.40 Saprock Magnetite-Gneiss 124-544
BEKT003 0.00 2.15 2.15 Saprock Magnetite-Gneiss 155-259
2.15 3.75 1.60 Saprock Hematite-Magnetite 133-299
3.75 9.50 5.75 Saprock Magnetite-Gneiss 89-459
9.50 15.90 6.40 Saprock Hematite-Magnetite 113-906
15.90 20.10 4.20 Saprock Magnetite-Gneiss 38-386
BEKT004 0.00 9.70 9.70 Saprock Hematite-Magnetite 11-733
9.70 20.70 11.00 Saprock Magnetite-Gneiss 230-742
20.70 28.50 7.80 Saprock Hematite-Magnetite 9-485
28.50 30.10 1.60 Saprock Magnetite-Gneiss 99-193
BEKT005 0.00 3.53 3.53 Ferruginous Zone 358-675
3.53 42.70 39.17 Saprock Magnetite-Gneiss 22-988
BEKT006 0.00 4.50 4.50 Saprock Magnetite-Gneiss 45-331
4.50 11.50 7.00 Massive Magnetite-Hematite 163-1000>
11.50 23.30 11.80 Saprock Magnetite-Hematite 26-961
23.30 25.40 2.10 Saprock Magnetite-Gneiss 15-209
25.40 26.70 1.30 Saprock Calc-Silicate 2-14
26.70 30.00 3.30 Saprock Gneiss 2-22
BEKT007 0.00 4.00 4.00 Ferruginous Zone 68-230
4.00 6.00 2.00 Saprock Magnetite-Gneiss 21-259
6.00 18.50 12.50 Saprock Hematite-Magnetite 15-675
18.50 20.70 2.20 Saprock Magnetite-Gneiss 10-52
20.70 21.70 1.00 Saprock Hematite-Magnetite 113-282
21.70 31.50 9.80 Saprock Magnetite-Gneiss 9-135
BEKT008 0.00 1.00 1.00 Saprock Magnetite-Gneiss 133-315
1.00 3.80 2.80 Saprock Magnetite-Hematite 204-1000>
3.80 11.20 7.40 Saprock Magnetite-Gneiss 75-281
11.20 13.40 2.20 Saprock Magnetite-Hematite 85-694
13.40 16.50 3.10 Saprock Magnetite-Gneiss 118-191
16.50 18.00 1.50 Massive Magnetite-Hematite 134-775
18.00 19.75 1.75 Saprock Magnetite-Gneiss 245-570
19.75 20.50 0.75 Saprock Magnetite-Hematite 568-1000>
20.50 38.40 17.90 Saprock Magnetite-Gneiss 99-273
38.40 39.40 1.00 Saprock Magnetite-Hematite 384-493
39.40 61.00 21.60 Saprock Magnetite-Gneiss 45-456
A total of 332 continuous horizontal channel samples were collected across the trenches, and another 33
vertical channel samples within the trenches were selected additionally. A total of 365 samples will be sent
to the OMNIS laboratory in Antananarivo for preparation, after which pulps will be sent to ALS, an
accredited laboratory, in Perth, Western Australia for determination of total iron and a standard “iron suite”
of elements by XRF analyses.
AKORA has used geological mapping and magnetic susceptibility readings to support the identification of
potential DSO mineralisation. No samples have as yet been submitted for assays.
8
For the quarter ended 31 December 2025
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory
analyses where concentrations or grades are the factor of principal economic interest. Visual estimates
also potentially provide no information regarding impurities or deleterious physical properties relevant to
valuations.
Results are expected early 2026.
Mining Licence Submitted
Following the introduction of a new international level mining code in August 2023, Madagascar has moved
forward in developing its new mining regulatory framework. The tenement management process has been
reinvigorated with AKORA’s Bekisopa high-grade iron ore project receiving the first tenement renewal,
issued by the Ministry in early 2025. The application process for transforming exploration tenements to
mining licences had been on hold for some years, holding back development across the country.
The Mining Ministry, through the new administration, has opened the way forward for mining licence
applications to be submitted, with strong support from the new national political leadership. All applications
need to meet pre-requisites in accordance with the Mining Code and recently released administrative
guidelines. The following key pre-requisites to be satisfied are:
- The Exploration Permit is held in good standing, with financial commitments up to date and annual
exploration/development activities statements lodged;
- The proposed project is to have a clearly defined funding and development plan, as per the
Corporate requirements;
- Ownership and management requirements;
- Environmental authorisations;
- JORC Compliant Resource; and
- Project development engineering and design, at a minimum standard of pre-feasibility study.
AKORA has satisfied these pre-requisites and is the first mining licence application to the Ministry of Mines
under this new leadership (ASX Announcement 26 November 2025).
New Madagascar Leadership Recognises the Importance of the Bekisopa high-grade iron ore
Project
Following the lodgement of AKORA’s required documentation for the Bekisopa Mining Licence application,
better known as the Permis d’Exploitation (“PE”), Managing Director, Peter Bird travelled to Madagascar
during the quarter to meet with key government officials, including His Excellency Colonel Lucien
Rabearimanana, High Advisor for the Reform in charge of Strategic Resources, and also met with the
Minister of Mines, Mr Carl Andriamparany. The strategic importance and the contribution to the economy
of the high-grade iron ore Bekisopa Project was validated at this meeting (ASX Announcement 11
December 2025).
Following years of licencing delays, the Ministry of Mines has reopened the pathway for new mining licence
applications, with strong support from the new national political leadership. This is a significant positive
step by the new administration.
Securing the Mining Licence for Bekisopa will be a pivotal milestone for the Company, unlocking the next
phase of value creation. It will enable the advancement of strategic investment and financing discussions,
the progress of detailed development planning including a Feasibility Study and the continuation of
9
For the quarter ended 31 December 2025
meaningful community engagement. This places AKORA in a strong position to accelerate delivery of
long term value for all stakeholders.
Bekisopa High-Grade Iron Ore Project
Ownership 100% | Madagascar, Africa
AKORA is advancing plans at Bekisopa to produce up to 2 million tonnes per annum (Mtpa) of a
61% Fe average grade Direct Shipping Ore (DSO) for export to Blast Furnace-Basic Oxygen
Furnace (BF-BOF) steelmakers. Bekisopa’s high-grade iron ore may also be upgraded to a +67%
Fe concentrate at 75 microns for shipping to Direct Reduced Iron-Electric Arc Furnace (DRI-EAF)
steelmakers to make greener steel, produced without using coal and generating considerably
less carbon emissions.
Completed by Wardell Armstrong International (now a part of the global SLR Consulting group), a Pre-
Feasibility Study (PFS) released in March 2025 confirmed Bekisopa’s planned Stage One Direct
Shipping Ore (DSO) operation could produce 2 million tonnes per annum (Mtpa) of blended grade lump
and fines iron ore products at a 61.6% Fe average for blast furnace steelmakers1
.
The significant scale and particular mineralisation characteristics of Bekisopa’s iron ore resource
presents the Company with a staged development program:
1. Stage 1: Produce ~61.6% Fe average grade direct shipping iron ore (DSO): Mine, crush and screen
the at surface ‘weathered zone’ iron ore to produce a LOM average blended grade of 61.6%Fe across
the lump and fines product for shipping to Blast Furnace-Basic Oxygen Furnace (BF-BOF) steelmakers
via a port at Toliara. A Fines product could be delivered at an average LOM grade of 61.4% Fe and a
Lump product at an average LOM grade of 61.8% Fe.
2. Stage 2: Produce +67% Fe grade Direct Reduced iron concentrate: Using cash generated from the
DSO start-up production, mining the underlying fresh mineralisation and adding grinding and magnetic
separation circuits to upgrade ore to a +67% Fe low impurity concentrate at 75 microns for shipping to
Direct Reduced Iron-Electric Arc Furnace (DRI-EAF) steelmakers via a port of Toliara. The DRI-EAF
process is used to manufacture greener steel with considerably less carbon emissions.
The PFS for Stage 1 considers using contract mining and mobile processing equipment (crushing, screen,
and with magnetic separation after Year 3), and conveying, contract truck hauling of the product, as well
as operating barges and a floating crane at the existing Toliara port.
Satrokala Project
Ownership 100% | Madagascar
AKORA’s Satrokala Iron Ore Project has emerged as a significant prospect after a recent
magnetic survey2
identified a major anomaly up to 10km long and 2km wide, making it some 66%
larger than the Company’s more advanced Bekisopa Iron Ore Project.
In 2024, a maiden drilling program targeting the magnetic anomaly was completed at Satrokala, which
returned substantial intersections of low-grade iron mineralisation across all five holes of the sighter
1 Refer ASX release dated 31 March 2025 Bekisopa high-grade iron ore project PFS confirms a robust 2Mtpa DSO Operation
with an 86% IRR.
2 Refer ASX Release dated 20 March 2024 – Satrokala Magnetic Survey Results
10
For the quarter ended 31 December 2025
exploratory drilling program over 500m. This is a positive sign that the mineralised systems is continuous
and supports a broader, near surface iron formation extending across the Satrokala anomaly.
No activities were completed at Satrokala during the quarter while the Company focused on delivering
key milestones for its flagship Bekisopa Project.
Figure 6. Satrokala drill plan and the associated ground magnetic survey results.
11
For the quarter ended 31 December 2025
Corporate
Cash Position
AKORA Resources Limited held cash reserves at the end of quarter of approximately $1.1 million.
Markets and Outlook
Iron Ore demonstrated significant price resilience throughout the quarter, closing at US$106/t on 31
December 2025. While longer term consensus forecasts are around US$90–95/t range, the current
market remains buoyed by steady demand and disciplined supply, positioning the sector favourably
heading into 2026.
Shareholder Information
As at 31 December 2025, the Company had 705 shareholders and 172,815,416 ordinary fully paid
shares on issue with the top 20 shareholders holding 55.88% of the total issued capital.
ASX Additional Information
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter was
$396,987. Full details of exploration activity during the quarter are set out in this report.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and development
activities during the quarter.
ASX Listing Rule 5.3.5: Payment to related parties of the Company during the quarter was $135,701 in
cash. A description of and explanation for payments to related parties and their associates per Section
6.1 of the Appendix 5B following this Quarterly Activities Report is set out in the table below:
Director Remuneration Current Quarter
Managing Director fees 87,501
Non-Executive Director fees 35,000
Superannuation 13,200
Total 135,701
Board and Senior Management
Graeme Hunt Non-executive Chairman
Peter Bird Managing Director & Chief Executive Officer
Matthew Gill Non-executive Director
Shane Turner Chief Financial Officer & Company Secretary
Jason Whittle General Manager – Development
James Deo Senior Advisor – Corporate Development
ASX Announcements during the quarter
The following material announcements were lodged on the ASX Market Announcements Platform during
the quarter:
12
For the quarter ended 31 December 2025
Date Description
8 October 2025 30 September 2025 Quarterly Activities & Cashflow Report
12 November 2025 Bekisopa Trenching Program Successfully Completed
26 November 2025 Bekisopa Mining Permit Application Submitted
11 December 2025 New Madagascar Leadership Endorse Bekisopa Project
These announcements are available for viewing on the Company’s website www.akoravy.com.
Other details
Head Office
12 Anderson Street West
Ballarat Vic 3350
Phone: +61 438 871 995
Website: www.AKORAvy.com
This announcement is authorised by the Board.
For further information contact:
Peter Bird
Managing Director
AKORA Resources
info@akoravy.com
13
For the quarter ended 31 December 2025
Competent Persons’ Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist
(Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific Professions (SACNASP).
Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and the activity being undertaken to qualify as a Competent Person as
defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the
2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the information in this release in the
form and context in which it appears.
The information in this document that relates to the Mineral Resource estimate of the Bekisopa project is
based on, and fairly represents information and supporting documentation compiled and reviewed by
Mr. Richard Ellis, a full-time employee of Wardell Armstrong International and independent of Akora
Resources. Mr. Ellis is a Chartered Geologist (CGeol) and Fellow of the Geological Society of London,
and European Geologist (EurGeol) of the European Federation of Geologists, and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012
edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves" ('JORC Code'). Mr. Ellis consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
The information in this document that relates to the Ore Reserve estimate for the Bekisopa project, is
based on and fairly represents information and supporting documentation compiled and reviewed by Mr.
Colin Davies, a full-time employee of Wardell Armstrong International and independent of Akora
Resources. Mr. Davies is a Chartered Mining Engineer (CEng), a Member of the Institute of Materials,
Minerals and Mining UK (MIMMM), and Qualified for Minerals Reporting (QMR). Mr. Davies has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves" ('JORC Code'). Mr. Davies consents to the inclusion in the report of the
matters based upon the information in the form and context in which it appears.
14
For the quarter ended 31 December 2025
Tenement Interests
As at 31 December 2025, the company had interests in the following tenements (as required by Listing
Rule 5.3.3). There were no changes in the company’s interests in tenements during the quarter.
Project Location
Tenement
Number
Blocks Current Interest
Bekisopa PR Madagascar, Africa 10430 64 100%
Bekisopa PR Madagascar, Africa 27211 128 100%
Bekisopa PR Madagascar, Africa 35827 32 100%
Bekisopa PRE Madagascar, Africa 3757 16 100%
Samelahy PR Madagascar, Africa 6595 98 100%
Samelahy PR Madagascar, Africa 13011 33 100%
Samelahy PR Madagascar, Africa 21910 3 100%
Tratramarina East PR Madagascar, Africa 16635 144 100%
Tratramarina East PR Madagascar, Africa 16637 48 100%
Tratramarina East PR Madagascar, Africa 17245 160 100%
Tratramarina West PRE Madagascar, Africa 18379 16 100%
Tratramarina West PRE Madagascar, Africa 18891 48 100%
15
For the quarter ended 31 December 2025
Mineral Resources and Ore Reserves
Table 1. Bekisopa Mineral Resource Estimate (Inferred Resource) as at 30 September 2025
Table 2. Bekisopa 2025 Ore Reserve Estimate
Notes:
1. The effective date of the Ore Reserve estimate is 07 February 2025.
2. The Ore Reserves estimate is reported in accordance with the guidelines of the JORC Code (2012). 3. Variable cut-off
grades have been applied to meet product requirements, of Enriched >60% Fe, Intermediate A 40-60% Fe, and Intermediate B
30-40% Fe.
4. The Ore Reserve estimate is based on optimisation parameters including a selling price of $110/t for 62% Fe concentrate and
takes into account Modifying Factors related to mine design, geotechnical parameters, mining and processing costs, processing
recoveries, G&A, ESG and royalty costs. Mining dilution varies by domain between 1-3% based on diggability and rippability
considerations. Mining recovery varies between 97-99% by domain.
5. Quantities are in dry metric tonnes as transported to the ROM. Figures have been rounded to an appropriate level of
precision. Due to rounding some totals may not compute exactly as shown.
16
For the quarter ended 31 December 2025
Table 3. Bekisopa MRE Direct Shipping Ore Zone
Mineral Resource Estimate for the Bekisopa Project
Free Digging and Rippable Mineral Resources, 7 February, 2025
Classification Tonnes (Kt) Density (t/m3
) Fe (%) SiO2 (%) Al2O3 (%) P (%)
Bekisopa South
Enriched DSO
Indicated 5,724 3.39 60.3 6.1 3.6 0.10
Inferred 902 2.99 55.9 7.7 4.7 0.10
Intermediate A
Indicated 1,231 2.38 40.5 23.1 8.2 0.10
Inferred 105 2.33 40.1 23.6 7.4 0.07
Intermediate B
Indicated 260 2.54 34.3 29.3 4.9 0.15
Inferred 765 3.41 39.0 24.7 4.6 0.13
Bekisopa Central
Enriched DSO
Indicated 560 3.19 54.9 11.1 6.1 0.06
Inferred 15 3.07 53.5 12.0 6.4 0.06
Intermediate A
Indicated 605 2.65 38.7 23.7 7.4 0.11
Inferred 42 2.65 38.9 23.1 7.6 0.11
Intermediate B
Indicated 59 2.75 31.2 2.7 4.2 0.18
Inferred 187 3.2 38.1 17.6 2.6 0.12
Bekisopa North
Enriched DSO
Indicated 349 3.11 58.5 7.5 5.46 0.09
Inferred 955 3.49 52.6 11.3 3.4 0.21
Intermediate A
Indicated - - - - - -
Inferred 111 2.52 39.3 23.2 5.9 0.13
Intermediate B
Indicated - - - - - -
Inferred 748 2.71 32.8 23.6 3.7 0.16
Bekisopa Total
Classification Tonnes (Kt) Density (t/m3
) Fe (%) SiO2 (%) Al2O3 (%) P (%)
Enriched DSO
Indicated 6,633 3.36 59.7 6.6 3.9 0.10
Inferred 1,872 3.22 54.2 9.6 4.0 0.16
Intermediate A
Indicated 1,836 2.46 39.9 23.3 7.9 0.10
Inferred 258 2.46 39.5 23.3 6.8 0.10
Intermediate B
Indicated 319 2.57 33.7 29.0 4.7 0.16
Inferred 1700 3.04 36.2 23.4 4.0 0.15
17
For the quarter ended 31 December 2025
Notes
1. Mineral Resources of the Enriched zones are reported within wireframe boundaries interpreted at nominal
cut-off grades of 58% Fe for Bekisopa South and North and 50% Fe for Bekisopa Central. Mineral
Resources of the Intermediate A zones are reported within wireframe boundaries interpreted at a nominal
cut-off grade of 35% Fe. Mineral Resources of the Intermediate B zones are reported at a cut-off grade of
30% Fe.
2. Mineral Resources are limited by an optimised open pit shell based on appropriate technical and economic
parameters.
3. Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a Pre-
Feasibility Study or Feasibility Study.
4. Mineral Resources are reported inclusive of any Ore Reserves.
5. Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by
Richard Ellis, an independent Competent Person as defined by JORC.
6. The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title,
taxation, socio-political, marketing or any other relevant issues.
7. All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due
to rounding.
18
For the quarter ended 31 December 2025
Company Profile
Cleaner iron ore for greener steel
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development of four high-grade
iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (Mt) Inferred JORC Resource (ASX
Announcement 11 April 2022) with very low impurities able to produce a premium-priced +67% Fe concentrate. Direct
Reduced Iron-Electric Arc Furnace technology, which is used to make greener steel without coal and considerably
less carbon emissions, requires iron ore grades of at least 67%.
(ASX Announcement – Bekisopa Scoping Study, 14 November 2023)
To generate cash in the near-term, AKORA is advancing plans at Bekisopa for a Stage 1, 2Mt per annum Mine with
a six-year life of mine, producing 61.6% Fe average grade lump and fine direct shipping ore (DSO) for shipping to
Blast Furnace steelmakers.
(ASX Announcement - Bekisopa Pre Feasibility Study, 31 March 2025)
The Company confirms that it is not aware of any new information or data that materially affects the above and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
And further the Company confirms that all material assumptions underpinning the 2Mt per annum production target continue to apply and have
not materially changed.
19
For the quarter ended 31 December 2025
20
For the quarter ended 31 December 2025
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AKORA Resources Limited
ABN Quarter ended (“current quarter”)
90 139 847 555 31 December 2025
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12-months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs (196) (595)
(e) administration and corporate costs (301) (1,355)
1.3 Dividends received (see note 3)
1.4 Interest received 1 5
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other
1.9 Net cash from / (used in) operating
activities
(496) (1,945)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation (397) (1,433)
(e) investments
(f) other non-current assets
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
21
For the quarter ended 31 December 2025
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12-months)
$A’000
2.5 Other
2.6 Net cash from / (used in) investing
activities
(397) (1,433)
3. Cash flows from financing activities
376 4,044
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(20) (216)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing
activities
356 3,828
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,636 649
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(496) (1,945)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(397) (1,433)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
356 3,828
4.5 Effect of movement in exchange rates on
cash held
4.6 Cash and cash equivalents at end of
period
1,099 1,099
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in
the consolidated statement of cash
flows) to the related items in the
accounts
Current quarter