Annual Report to shareholders
Released
Released
Announcement PDF
akoravy.com
1
Akora Resources Limited Annual Report for the year ending 31 December 2023
Contents
04
06
Corporate
Directory
Chairman’s and
Managing
Director’s Letter
Review of
Operations
17
18
19
20
Company Profile
Directors’ Report
03
15
Corporate
Competent
Persons’
Statement
Mineral Resources
and Ore Reserves
30
36
37
37
Auditor’s
Independence
Declaration
Consolidated
Financial
Statements
Consolidated Statement
of Profit or Loss and
other Comprehensive
Income
38
39
41
Consolidated
Statement of
Financial Position
Consolidated
Statement of
Changes in Equity
40
69
70
75
Independent
Auditor’s Report
ASX Information
Remuneration
Report
Directors’
Declaration
Consolidated
Statement of Cash
Flows
Notes the
Consolidated
Financial Statements
2
Akora Resources Limited Annual Report for the year ending 31 December 2023
AKORA is developing a high-grade Direct
Shipping Ore (DSO) iron ore mine in Madagascar.
The project will be further developed to serve the steel industry’s
accelerating focus on reducing carbon dioxide (greenhouse gas)
emissions through decarbonisation and the production of “Green
Steel”. Our high grade, low impurity iron ore upgrades to a +68%
iron (Fe) concentrate at a 75 microns particle size making it ideal
for green steel processes without burning coal.
Corporate Directory
Directors
Stock Exchange Listing
Mike Stirzaker – Non-Executive Chairman
(Resigned 1 February 2024)
Australian Securities Exchange Limited
ASX Code: AKO
Graeme Hunt – Non-Executive Chairman
(Appointed 1 February 2024)
Australian Company Number
Paul Bibby – Managing Director
139 847 555
Matthew Gill – Non-Executive Director
(Appointed 2 August 2023)
Company Secretary
John Madden
(Resigned 19 February 2024)
Shane Turner
(Appointed 19 December 2023)
Head Office and Registered Office
12 Anderson Street West, Ballarat
Victoria, Australia 3350
PO Box 28 Ballarat
Victoria, Australia 3353
Phone +61 (0) 419 449 833
Website
www.akoravy.com
Share Registry
Link Market Services
Tower 4, 727 Collins Street
Melbourne Victoria Australia 6000
Phone 1300 554 474
Solicitor
CBW Partners
Level 1, 159 Dorcas Street
South Melbourne Victoria 3205
Corporate Advisors
Harbury Advisors Pty Ltd
Level 5, 157 Collins Street
Melbourne Victoria 3000
PAC Partners Securities Pty Ltd
Level 29, 360 Collins Street
Melbourne Victoria Australia
Auditor
Hall Chadwick WA Audit Pty Ltd
283 Rokeby Rd
Subiaco Western Australia, 6008
ABN 33 121 222 802
hallchadwick.com.au
3
Akora Resources Limited Annual Report for the year ending 31 December 2023
Chairman’s and Managing Director’s Letter
Dear Shareholders,
2023 confirmed the growing significance of our high-grade Bekisopa Project
as an iron ore resource with both direct ship ore (DSO) potential and a future
delivering clean very high-grade direct reduction iron ore (DRI) concentrate
into a decarbonising green steel future.
Near surface bulk sample assay results showed lump and fines ore at +64% iron which correlates well
with weathered zone drill assays along Bekisopa’s 6-kilometre strike length. The Bekisopa Southern Zone
DSO infill drilling assays delivered a 5.5 million tonnes (Mt) of Indicated and Inferred DSO JORC resource
with 4.4Mt in the Indicated category grading 61% iron. This DSO resource formed the basis of the
updated Scoping Study.
The updated Scoping Study was released in November and was well received by shareholders and
brought AKORA to the attention of potential strategic investors. The low capital entry case at US$55M is
seen as a practical approach to generate healthy cash flows and build the production and logistics
pathway for Bekisopa. Production is planned to ramp up to deliver 2Mtpa of lump and fines product that
Wardell Armstrong International consultants confirms is economically viable, generating a pre-tax cash
flow of US$270M over an initial 5 year mine life, resulting in a US$125 million NPV(10%) and a 64% IRR.
The AKORA Board sees this low capital case as a practical pathway into production, as it assists to
mitigate project delivery risk, enables investment to improve the production and logistics processes, and
enables arising cash flow to progress production of the premium quality DRI concentrate. As a result, the
Board supported moving directly into a Pre-Feasibility Study (PFS) for Bekisopa.
The Company’s fourth drilling campaign was conducted between July and October with 65 holes on a
50m-by-50m grid completed in the North and Central Zones at Bekisopa. The information obtained is
expected to add further DSO production years to the PFS.
Beneath the DSO weathered zone is a significant high grade fresh magnetite rock resource which in the
Southern Zone averages 45% iron. This is a prospective start-up area for the production of a high grade
+68% iron clean low impurity concentrate for DRI pellets – a very attractive feed for “Green Steel”
production.
AKORA completed a ground magnetic survey at the nearby larger Satrokala tenement prospect in
October 2023. This geophysical survey covered a ten kilometres strike length of identified iron
mineralisation where previous rock chips samples graded 64% iron were obtained. Further exploratory
drilling will determine the extent of further iron mineralisation potential along a strike length 60% greater
than known at Bekisopa.
In late 2023 a revised Mining Code, was passed by both Houses of the Madagascan Parliament, together
with a commitment to processing tenement renewals. Further progress should occur there once the
Implementation Plans are finalised in 2024.
4
Akora Resources Limited Annual Report for the year ending 31 December 2023
The Company welcomed Matt Gill onto the AKORA Board in August 2023, a mining engineer with
considerable operations and mining project development experience. Founding Director John Madden
retired from the Board and then stepped down as CFO and Company Secretary at years end. John’s
experience and resolve ensured AKORA is in excellent shape with a strong future. Graeme Hunt, a
former President of BHP iron ore, was appointed Chairman on 1 February 2024 following on from
AKORA’s inaugural Chairman Mike Stirzaker.
Thank you for your continued support.
Graeme Hunt
Non-Executive Chairman
Paul Bibby
Managing Director
5
Akora Resources Limited Annual Report for the year ending 31 December 2023
Review of Operations
6
Akora Resources Limited Annual Report for the year ending 31 December 2023
Bekisopa Iron Ore Project
Ownership 100% | Madagascar
The Company’s flagship Bekisopa Iron Ore Project in central Madagascar has a 194.7 million tonne
(Mt) Inferred JORC Resource with very low impurities, and able to produce a premium-priced
+68% Fe concentrate. Direct Reduced Iron-Electric Arc Furnace (DRI-EAF) technology which is
used to make green steel without burning coal and considerably lower carbon emissions requires
iron ore grades of at least 67%.
It is anticipated that Stage 1 of this Project’s development is the initial production of high-grade Lump and
Fines direct shipping ore (“DSO”) – this stage being the subject of the positive Scoping Study released in
November 2023.
Project Overview
The significant scale and particular mineralisation characteristics of Bekisopa’s iron ore resource
presents the Company with several staged development options over time:
1. Produce a 61% Fe average grade Direct Shipping Ore (DSO): Mine, crush and screen iron ore to produce a
61% Fe average grade lump and fines product for shipping to Blast Furnace-Basic Oxygen Furnace (BFBOF) steelmakers.
2. Produce a +62% Fe grade DSO fines: Mine, crush and screen ore to produce a +62% Fe grade fines
product for shipping to BF-BOF steelmakers.
3.
Produce a premium-priced +68% Fe grade concentrate: Using cash generated from Stages 1 and/or 2, add
grinding and magnetic separation circuits to upgrade the ore to a +68% Fe concentrate at 75 microns for
shipping to DRI-EAF steelmakers, where the use of coal is substituted for electricity and so making steel
with significant reductions in carbon emissions – what has been termed “green steel”.
Figure 1. Bekisopa Iron Ore Project location with northern, central and southern zones delineated. The Satrokala
Project is located around 20km to the south-west of Bekisopa.
7
Akora Resources Limited Annual Report for the year ending 31 December 2023
Figure 2. Low CAPEX Case highlights taken from the Bekisopa Scoping Study (November 2023).
In Bekisopa’s southern zone, 4.4Mt of Indicated DSO tonnes have been defined according to JORC
standards within the overall total project resource of 194.7Mt.
Released in late 2023, an updated Scoping Study prepared by Wardell Armstrong International (WAI)
focused on a Low CAPEX option on this DSO resource and presented two scenarios for comparison:
1.
A minimum capital ‘Low CAPEX Case’ DSO open pit mining operation which contemplates using
contractor labour, contractor mining equipment (trucks and loaders) and mobile processing
equipment (crushing, screen and conveying) suitable for processing the iron ore into a 61% Fe
average grade lump and fines product. Contractors would also be used for truck hauling the
products to a stockpiling location and for ship loading.
2.
A DSO open pit “Low OPEX Case” mining operation which contemplates using contract mining fleet
and labour and AKORA labour, as well as fixed equipment (crushing, screening and conveying)
suitable for processing the iron ore into a 61% Fe average grade lump and fines product. AKORA
would also own and operate the on-road truck hauling fleet and to develop, own and operate a
dedicated port facility with ship loading infrastructure.
For both the Low CAPEX and Low OPEX cases examined in the Scoping Study, the production schedule
ramps up from 0.5 million tonnes per annum (Mtpa) to 2Mtpa over the initial five years of mine life.
This ramp-up profile is to ensure that management and employees are progressively and appropriately
trained to reliably mine and process product of consistent quality, safely drive haul trucks, and manage
capital, project delivery and operational scale-up risks.
In the ’Low CAPEX Case’ open pit mining operation, the Study found that Bekisopa could deliver an
estimated initial five-year Mine Life with revenues of US$545 million for a C1 operating cost of US$45 per
wet metric tonne (wmt) weighted average over the initial five years (US$42/wmt at full production rate).
8
Akora Resources Limited Annual Report for the year ending 31 December 2023
This case would generate a pre-tax operating cash flow of US$270 million and an IRR of 64%. The
upfront capital cost was estimated to be US$55.3 million.
A DSO lump and fines start-up operation using at-surface, weathered iron mineralisation would need
much less time, resources and capital to deliver saleable product to market. Positive cash flows could be
generated more quickly to repay the initial capital expenditure, fund further drilling and resource
development, and processing improvements to produce higher grade higher priced, products.
Significant resource growth potential
Notably, the Scoping Study did not include any upside potential DSO tonnes from the remaining 80% of
the under-drilled Bekisopa mineralised strike length, or the Company’s nearby and larger Satrokala
Project where around 30km of prospective strike length of iron ore mineralisation exists. Exploration
success at either Satrokala or Bekisopa, where only 20% of the 6km strike length of identified
mineralisation has been shallow drilled for inclusion in this Study, would significantly add to this initial
five-year DSO Start-Up Plan and result in significantly improved Study financial outcomes.
In 2022, a rock chip program on the Satrokala tenements, produced encouraging assay results. 102 rock
chips showed an average of 58.8% Fe and a subset of 66 rock chips had an average grade of 64.5% Fe
after excluding rocks at less than 58% Fe.
Pre-feasibility Study to start for Direct Shipping High-Grade Iron Ore
In December, AKORA announced it had advanced plans to develop the Bekisopa DSO startup project by
starting a Pre-Feasibility Study (PFS) for the project, including building the team to complete these
projects.
To be conducted by WAI, the PFS will focus on the best operational and financial combination from the
“low CAPEX” and “Low OPEX” options. The first modules of work will focus on defining the port options
and delivering an updated Mineral Resource Estimate which will include the recent 2023 infill DSO
drilling across Bekisopa’s northern and central zones.
2023 infill drilling campaign completed
The Company reported significant iron mineralisation intercepts at Bekisopa after completing a fourth
drilling campaign of 904.9m across 65 holes in August 2023. Drilling on a 50m-by-50m grid across the
project’s northern and central zones, iron ore mineralisation intercepts averaged around 18.0m in the
north, and 9.2m in the central tenement.
Nine additional shallow drill holes were included below outcropping iron ore rock formations in the
southern zone in an area to the east of the 2022 drilling campaign to test for a possible mineralisation
extension in that area.
All geological field logging has now been completed, and the iron ore mineralisation interval samples
were delivered to the OMNIS Laboratory in Antananarivo for preparation into assay pulps. The assay
pulps were then delivered to the ALS Iron Ore Technical Centre in Perth in three batches starting in
December. The expectation is that all the assay results and an updated Mineral Resource Estimate will be
reported during the first half 2024.
9
Akora Resources Limited Annual Report for the year ending 31 December 2023
Figure 3. Bekisopa infill drill locations 2023 which targeted a 6km strike zone of major magnetic anomalies.
Direct Shipping Ore (DSO) Resource Upgrade
In July, AKORA announced it had increased Bekisopa’s total DSO resource (Inferred and Indicated) to
9.1Mt (which excludes the high-grade outcrop) after all of the 2022 infill drilling assay results, and the
previous 2020 and 2021 drilling results, were provided to WAI.
5.5Mt DSO tonnes (Inferred and Indicated) at 60.3% Fe were added along Bekisopa’s 6km strike in the
project’s southern zone, representing a 34% increase. As mentioned earlier in this report, within this
resource is a 4.4Mt Indicated DSO Resource grading 60.9% Fe.
Bekisopa has an overall Inferred Resource of 194.7Mt and which has the potential to produce a 67.6%
concentrate grade at 75 micron grind size. Within this resource, the Company has now defined a 34Mt
high-grade, “Green Steel” Inferred Resource in the project’s southern zone which grades 45.3% Fe (58%
Davis Tube Recovery) and could deliver 21.1Mt of 68.7% Fe concentrate at 75 microns.
This “Green Steel Resource” can be readily mined from an optimised open pit shell after selectively
mining the DSO during a start-up first phase operation. Only 1.7 mined tonnes would be required to
produce 1 tonne of 68.7% Fe concentrate, compared to 2.6 mined tonnes previously expected. This
offers significant opportunities to lower capital and operating costs, during the “Green Steel” second
phase.
10
Akora Resources Limited Annual Report for the year ending 31 December 2023
Figure 4. Bekisopa has an overall Inferred Resource of 194.7Mt which has the potential to produce a 67.6%
concentrate grade at 75 micron grind size.
11
Akora Resources Limited Annual Report for the year ending 31 December 2023
Community consultation
AKORA Managing Director Mr Paul Bibby and Director Mr Matt Gill visited Bekisopa to host community
meetings at the Tanamarina and Bekisopa villages in late 2023. Early feedback was supportive and
encouraging.
Following a request from the local Tanamarina medical facility, AKORA provided a selection of medical
supplies to ensure better medical outcomes for the local village communities. As the new school year
commenced in September, AKORA provided educational supplies, as requested by the teacher, for the
teacher and the students. Providing these items was very well received by the local community and
continues to build on the good relationship between the company and the various local village
communities.
On returning to Antananarivo, the capital of Madagascar, positive meetings were held with the Mining
Ministry, engineering firms and associates.
Figure 5. AKORA provided medical supplies to the local Tanamarina medical facility.
An environmental and community survey was also performed across the Bekisopa tenement area to
establish a reference point for future studies.
12
Akora Resources Limited Annual Report for the year ending 31 December 2023
A weather monitoring station has been installed in the local Tanamarina village around 25km from the
Bekisopa tenements to continuously capture temperature, wind and rainfall data over the next 12 plus
months for incorporation into the PFS.
Figure 6. Weather monitoring station with the local village’s fresh water installation in the background
13
Akora Resources Limited Annual Report for the year ending 31 December 2023
Satrokala Project
Ownership 100% | Madagascar
Our 100% owned Satrokala Project is located just 40km to the south-west of our flagship Bekisopa
Project and offers considerable upside advantage to our development of the area.
Magnetic Survey
A magnetic survey was conducted at Satrokala during the reporting period using the same equipment
and approach as employed at Bekisopa in October 2019. Three magnetometer units were used and a
team of seven geologists walked a section of the tenements under the supervision of Planetary
Geophysics, Australia. The survey data is now being assessed in Australia.
The survey covered just 10km of the potential 30km of prospective iron mineralisation strike length
previously identified at the project. The target area was traversed on foot in 25m or 50m lines and in total
traversing over ~610km. The results are due early 2024 and will assist in pinpointing exploratory
drillholes for a maiden drilling program proposed in Q2 2024.
Figure 7. AKORA geologist team preparing for the Satrokala magnetic survey and walking across the tenements
and the rich red iron ground.
14
Akora Resources Limited Annual Report for the year ending 31 December 2023
Corporate
Capital raising
On 1 May 2023, the Company advised shareholders that it had undertaken a Share Placement that
raised $793,000 through the issue of 4,956,250 fully paid ordinary shares at 16 cents per ordinary share
with 2,478,125 accompanying free-attaching options over ordinary shares at an exercise price of 25
cents and expiry date being 25 May 2026.
The Company simultaneously announced an Entitlement and Shortfall Offer which closed on the 25 May
2023. Under the Entitlement and Shortfall Offer the Company issued 14,442,197 fully paid ordinary
shares at 16 cents per fully paid ordinary share with proceeds of $2,310,751. Under the Entitlement and
Shortfall Offer, the Company issued 7,221,088 free-attaching options over ordinary shares at an exercise
price of 25 cents and expiry date being 25 May 2026.
The Company also announced on 25 May 2023, a Share Placement which raised $475,182 through the
placement of 3,394,157 fully paid ordinary shares at 14 cents per fully paid ordinary share.
In total, the Company raised $3,578,933 and issued 22,792,604 fully paid ordinary shares and 9,699,213
options over ordinary shares at an exercise price of 25 cents per option over ordinary shares with an
expiry date of 25 May 2023.
New Mining Code
During the reporting period, the Company announced (see ASX Announcement, dated 4 April 2023) that
the Council of Ministers had approved a new Mining Code and on 9 June 2023 the new Mining Code was
approved by the Malagasy Legislature. Following a review for Constitutional and Legal implications of the
Mining Code, the President of Madagascar declared the Mining Code approved on 27 July 2023.
The replacement Mining Code has taken some years to be revised and as a result, there is a significant
backlog of tenement renewals and transformations to be processed as well as consideration of new
applications.
The Extractive Industries Transparency Initiative (EITI) in Madagascar has also been upgraded under the
technical supervision of the Ministry of Mines and Strategic Resources and financial supervision of the
Ministry of Economics and Finance.
The Company holds twelve tenements. It has ensured throughout the period that the BCMM
(Madagascar’s mining tenements department) did not process tenement renewals and transformations
that all annual administration fees were paid. Accordingly, all the tenements held by the Company are in
good standing which the government has determined to be a precondition for the process of renewals.
The Implementation Rules will now be prepared and these Rules will enable exploration and mining
companies to understand how to progress against the Revised Mining Code. When these Implementation
Rules become available the company will provide commentary on how they influence AKORA.
The Revised Mining Code includes a mining royalty increase from 2 to 5% of the sale price this compares
to a 7.5% royalty for Direct Ship Iron Ore in Western Australia. The revised Mining Code states that when
15
Akora Resources Limited Annual Report for the year ending 31 December 2023
transformation / upgrading of the mined product occurs, within Madagascar, then the royalty reduces
from 5% to ~3.5%. Our present understanding of ‘Transformation’ of a mineral substance means all
processes that give the mineral substances a different appearance than the original, or that modify their
chemical or mineralogical composition, in order to valorise them. The degree of transformation will need
to be confirmed once the particular Implementation Rule is announced. For comparison, the royalty in
Western Australia for upgrading iron ore to a higher grade concentrate is 5%. The corporate income tax
rate in Madagascar is 20%.
Leadership changes
In early August, AKORA announced that Mr Matthew Gill, a mining engineer with over 40 years’
experience, was appointed as an Independent Non-Executive Director to the AKORA Resources Board.
He has held various key management and executive roles in both national and international jurisdictions.
Mr Gill’s technical studies, exploration and operational and corporate experiences in the minerals
industry will add a broad range of skills for advancing AKORA in the next phase of the Company’s
progression.
On 28 August 2023, the Company announced that Mr John Madden had elected to resign as a director
of the Company on 25 August 2023. The Company acknowledges and thanks John for his contribution
and guidance since establishing the company in 2009.
In December 2023, the Company announced it had appointed experienced mining company executive
Mr Shane Turner as Chief Financial Officer and Company Secretary, effective from 1 January 2024.
As a Chartered Accountant with over 35 years accounting and financial experience, Mr Turner has
served as a Non-Executive Director, Company Secretary and Chief Financial Officer with Mozambiquefocused heavy mineral sands company MRG Metals Ltd (ASX:MRQ) since 2011, and as Company
Secretary and Chief Financial Officer for White Rock Minerals Ltd (ASX:WRM) since 2016.
In January 2024, subsequent to the end of the reporting year, AKORA appointed mining operations and
project developer Mr Jason Whittle as General Manager - Development, effective from 15 January 2024.
Jason has an Honours degree in Mineral Processing and has worked in operational leadership roles
throughout the mining value chain, in mining and processing, through to marketing, before progressing to
project development and implementation roles on major projects across Australia, Peru and Africa,
working for Pasminco, Zinifex, OZ Minerals and MMG. Jason was most recently General Manager –
Projects at Podium Minerals covering resource development, study management with internal and
external resources, metallurgical testwork, financial modelling, environmental and license planning and
ESG.
Additionally, AKORA appointed former BHP Iron Ore President Mr Graeme Hunt as Chairman, effective
from 1 February 2024. Mr Hunt started his 34-year career with BHP in the sinter plant at the Port Kembla
steel works, before performing General Management roles covering operations management, port
operations, and corporate strategy. Between 1999 to 2005, he was President BHP Iron Ore where his
global responsibilities included the expansion of BHP’s Pilbara operations and the development of strong
commercial relationships with Asian steel mills.
Mr Hunt served as Managing Director (MD) and Chief Executive Officer (CEO) of Lihir Gold Ltd during
which time he managed the company’s takeover by Newcrest Mining for A$9.5 billion. More recently, he
has held MD and CEO positions with both Broadspectrum (formerly Transfield Services) and Chairman
then MD and CEO of AGL Energy Ltd.
16
Akora Resources Limited Annual Report for the year ending 31 December 2023
Mr Hunt’s commodity experience covers iron ore and steel, coal, manganese, aluminium, copper,
uranium, gold, electricity and gas while his management expertise spans steel production, exploration,
mining, logistics and port operations across Australia, South America, PNG and West and Southern
Africa.
Competent Persons’ Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist (Pr.Sci.Nat.
- 400155/13) with the South African Council for Natural Scientific Professions (SACNASP). Mr. Leeuwner
has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and the activity being undertaken to qualify as a Competent Person as defined in the Note
for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the 2012 Edition of the
‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC
Code). Mr. Leeuwner consents to the inclusion of the information in this release in the form and context in
which it appears.
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Director of AKORA Resources Limited (AKO), as such he is a shareholder in
AKORA Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its
processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and
mineral processing results.
The information in this report that relates to Mineral Resources for the South Bekisopa Iron Project is
based on information prepared by Mr Richard Ellis BSc, MSc, MCSM, FGS, CGeol, EurGeol and is a fulltime employee of Wardell Armstrong International. Mr Ellis is a Chartered Geologist of the Geological
Society of London and has sufficient experience relevant to the style of mineralisation, the type of deposit
under consideration and to the activity undertaken to qualify as a Competent Person as defined in the
2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Ellis consents to the inclusion of the information in the release in the form and context in
which they appear.
17
Akora Resources Limited Annual Report for the year ending 31 December 2023
Mineral Resources and Ore Reserves
AKORA’s Resource at 31 December 2023.
Refer ASX Announcements on 23 March 2022 and 11 April 2022.
The 11 April 2022 Maiden Resource Estimate for the Bekisopa Southern Zone reported 4.2 mt DSO at
57% Fe within a 110.2 mt Inferred Resource. The recent infill DSO drilling has increased the total DSO
resource to 5.54 mt at 60.35% Fe, within this is a 4.42 mt DSO Indicated Resource grading 60.86%
Fe.
Tonnes (Mt)
Fe (%)
SiO2 (%)
Al2O3 (%)
Density (t/m3)
Indicated
1.63
60.15
7.01
2.65
3.68
Inferred
0.33
58.83
6.37
2.54
3.74
Indicated
2.80
61.28
4.80
3.38
3.21
Inferred
0.79
58.13
6.04
4.23
2.92
Indicated
4.42
60.86
5.61
3.11
3.37
Inferred
1.12
58.34
6.14
3.73
3.13
Indicated and Inferred
5.54
60.35
5.72
3.24
3.32
Classification
Western DSO Zone
Eastern DSO Zone
TOTAL DSO
TOTAL DSO
Refer ASX Announcement on 11 July 2023.
18
Akora Resources Limited Annual Report for the year ending 31 December 2023
Company Profile
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development of four
high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (mt) Inferred JORC
Resource with very low impurities able to produce a premium-priced +68% Fe concentrate. Direct
Reduced Iron-Electric Arc Furnace (DRI-EAF) technology which is used to make greener steel without
burning coal and considerably less carbon emissions requires iron ore grades of at least 67%.
To generate cash in the near-term, AKORA is advancing plans at Bekisopa to produce up to 2Mt per
annum over the first five years of a 61% Fe average grade direct shipping ore (DSO) for shipping to Blast
Furnace-Basic Oxygen Furnace (BF-BOF) steelmakers.
Figure 8. Location of Projects.
19
Akora Resources Limited Annual Report for the year ending 31 December 2023
Directors Report
20
Th