Bekisopa Assay Results Identify DSO Potential
Released
Released
Announcement PDF
ASX Release
19 October 2021
BEKISOPA ASSAY RESULTS IDENTIFY DSO POTENTIAL
AKORA Resources (“AKORA” or “the Company”) (ASX Code: AKO) is pleased to provide
shareholders with the first 2021 assay report from resource drilling at Bekisopa. These assays
cover the first 18 shallow, <100m, diamond drill holes designed to primarily determine the
eastern extent of the iron mineralisation along strike. These results continue to show a near
surface high-grade weathered massive iron zone and iron mineralisation at depth.
Highlights:
➢ Very high-grade iron levels from surface, with low impurities;
6m at 67% iron, 2.1% silica, 2.0% alumina (BEKD29)
7m at 66% iron, 2.4% silica, 2.9% alumina (BEKD16)
15m at 65% iron, 1.9% silica, 1.5% alumina (BEKD13)
5m at 64% iron, 3.9% silica, 3.7% alumina (BEKD19)
68.3% iron the highest assay interval result.
➢ These very high-grade surface intercepts, greater than the
Benchmark 62%Fe grade, indicate potential for Direct Ship Ore
(DSO) tonnes.
➢ Drill hole BEKD14 finished in iron mineralisation at 107 metres,
grade 43%Fe, open at depth.
➢ Assays averaged 60%Fe within the weathered massive iron zone
down to depths of 15-20m from surface, along and across the main
strike.
➢ Potential for mining high-grade DSO lump and fines, +62% iron,
from outcrop and from within the expansive near surface
weathered massive iron zone.
1|Page
First Bekisopa 2021 Assay Results
The first phase of shallow drilling, <100m, in the 2021 drilling campaign was designed to define
the eastern extent of the iron mineralisation along strike and to the south-western side of the
broad southern magnetic anomaly. Hole locations are shown in Appendix 1, Figure 1A. Of
these first 18 drill holes, 16 have intercepted iron mineralisation from surface. Drill hole
BEKD14, in the south, also intercepted iron at depth finishing in iron mineralisation at 107
metres downhole (see ASX Announcements 20 July and 17 August 2021).
The following drill core sequences, Figures 1 to 4, show very high-grade weathered massive
iron zones at surface, by intercept, with average iron grades of 67% to 64% reported across
these intervals. This high-grade weathered massive iron mineralisation has the potential to
form the first phase of mining activities due to its characteristics being equivalent to direct
ship ore (DSO) with average head grades better than Benchmark 62%Fe and low impurity
levels averaging; 2.6% SiO2, 2.1% Al2O3, 0.08% P and 0.03% S.
67.8% Fe
68.3% Fe
67.5% Fe
66.9% Fe
65.8% Fe
66.1% Fe
64.8% Fe
Figure 1.
68.3% iron intercept at 0.8 to 1.7m was recorded in drill hole BEKD29 in the southwest area, on Tenement
10430, a part of a continuous 6.5-metre weathered massive iron intercept from surface with average
iron grade of 66.8%, very high-grade iron ore.
2|Page
66.2% Fe
64.8% Fe
63.9% Fe
66.3% Fe
66.3% Fe
63.8% Fe
67.1% Fe
Figure 2.
67.1% iron intercept from 6 to 6.9m was recorded in drill hole BEKD16 in the south, on Tenement 10430,
which is a part of a continuous 7-metre weathered massive iron intercept from surface with average
grade of 65.5%, very high-grade iron ore.
63.8% Fe
65.2% Fe
67.1% Fe
65.9% Fe
3|Page
60.7% Fe
64.9% Fe
64.9% Fe
65.2% Fe
66.3% Fe
67.6% Fe
64.3% Fe
65.1% Fe
Figure 3.
67.2% iron intercept from 2.5 to 3.5m and a 67.6% iron from 9 to 9.9m were recorded in drill hole BEKD13
in the south, on Tenement 10430, which are part of a continuous 15-metre weathered massive iron
intercept from surface with average iron grade of 65%, high-grade iron ore.
64.2% Fe
65.4% Fe
61.1% Fe
64.5% Fe
Figure 4.
64% iron average grade from surface to 4.5m in drill hole BEKD19 in the north, high-grade iron ore.
The major iron interval results for all drill holes are reported in Appendix 1. The assay results
show very encouraging near surface mineralisation to 15-20 metres with head grades ranging
from 40%Fe to 68%Fe and averaging 60%Fe, across the weathered zone. At depth, head
grades are as high as 65%Fe and average 34.4%Fe.
4|Page
The 2021 assays set out in this announcement continue to generate what the Company
achieved with its 2020 exploration programme, with excellent high to very high iron grades in
assay results, particularly in the expansive weathered zone along and across strike.
Processing trials, at a 2mm crush and wLIMS, readily upgraded composites from 61%Fe to a
66.9%Fe fines product (see ASX Announcement 27 April 2021). The Company believes that
the very high-grade near surface mineralisation may not require processing and accordingly,
achieve a +62%Fe product from simple crushing and screening. It is this +62%Fe product
that may be classified as Direct Ship Ore (DSO).
Seven of these first 18 shallow drill holes also intercepted iron mineralisation at depth,
BEKD14, see Figure 5, shows coarse disseminated iron mineralisation at a depth of 63 metres
to 107 metres downhole, with drilling finishing in iron mineralisation. When compared to 2020
assay results and processing trials, on similar iron grades and mineralisation, this iron
mineralisation at depth would be expected to readily upgrade to Benchmark grade 62% iron
ore fines.
48.3% Fe
42.1% Fe
45.3% Fe
57.7%Fe
Figure 5.
48% iron average grade from 80 to 84 metres in drill hole BEKD14 in the south, this drill hole ended in
iron mineralisation at 107m downhole.
The following sequence of cross-sections combine the 2020 drill hole intercepts with these
first 2021 shallow drill hole intercepts and show developing widths of high-grade near surface
iron mineralisation, so far, in the northern and southern areas where drilled.
5|Page
Cross Section 11900N in the north of Tenement 10430
Figure 6.
2021 drill holes BEKD23 and BEKD24 showing high-grade surface intercepts and westerly dipping iron
mineralisation from surface to depth.
Cross Section 11700N in the north of Tenement 10430
Figure 7.
2021 drill holes BEKD25, BEKD26 and BEKD27 showing steeply dipping iron mineralisation from surface
to depth with solid iron mineralisation intercepts.
6|Page
Cross Section 8000N in the south of Tenement 10430
Figure 8.
2021 drill holes BEKD15 and BEKD16 showing very high-grade iron mineralisation at surface, in these
eastern extent holes. Yet to receive the assay results for the other 2021 drill holes BEKD44, BEKD45,
BEKD32 and BEKD33, these holes show a +650 metre cross section across strike with potential for
significant resource tonnage and a low strip mining operation.
Cross Section 8150N in the south of Tenement 10430
Figure 9.
2021 drill holes BEKD13 showing very high-grade iron mineralisation at surface, 14.7m at 64.8%Fe, in this
eastern extent hole. Yet to receive the assay results for the other 2021 drill holes, BEKD14, BEKD43,
BEKD34 and BEKD35, these holes show a +650 metre cross section across strike with potential for
significant resource tonnage and a low strip mining operation.
7|Page
Cross Section 7800N in Tenement 10430
Figure 10.
2021 drill holes BEKD28 and BEKD29, in the south-western area, showing very high-grade iron
mineralisation at surface BEKD29, 6.2m at 66.8%Fe. This near surface high-grade iron mineralisation is
potentially direct ship ore (DSO).
Cross sections 8000N and 8150N, Figures 8 and 9 above, show that the iron mineralisation
forms a wide +650 metre, open synformal structure, with the eastern and western zones
forming the eastern and western ends of the synform. These two cross sections are the
southern area of this broader drill grid, refer Figure 1A in Appendix 1, and extend over 200
meters north south. This should provide considerable tonnage potential in the southern area
and a low strip-mining operation.
As the drill grid in the southern area is completed, the drill grid covers some 650 metres, east
to west, and 550 metres, north to south, it is highly likely that considerable resource tonnage
will be defined. From the cross sections above, Figures 8 to 10, in the southern area there
are high to very high-grade iron intercepts from surface that are potentially direct ship ore
(DSO). These high to very high-grade iron surface intercepts in this southern area are;
BEKD13 - 14.7m at 64.8Fe
BEKD11 - 4.4m at 62.4%Fe
BEKD1 - 25.2m at 61.4%Fe
BEKD10 - 3.2 m at 61.3%Fe
BEKD16 - 6.9m at 65.4%Fe
BEKD29 - 6.2m at 66.8%Fe, potentially DSO lump and fines with low impurities.
8|Page
Conclusion
As at the date of this announcement, the Company has completed 30 shallow diamond drill
holes, with the first 18 drill hole assay results reported in this announcement. The assays
show very high-grade iron contents from 68.3% to 40% (higher grades closer to the surface)
within the weathered massive iron zone where mineralisation averages 60%Fe to depths of
20m confirming potential for significant tonnages of Direct Ship Iron Ore (DSO).
Expectation is that this zone of very high-grade weathered iron at plus 62%Fe may be able to
be mined, crushed, and screened to produce high-grade lump and fines DSO products. This
in conjunction with the known outcropping iron ore, where rock chips showed an average iron
grade of 66.7%, could be the focus for an initial mining phase producing the high-grade lump
and fines products, see Figure 11. In the drill core there appears to be rocks of iron cemented
in the iron mineralisation, see the white arrows in Figure 11.
62.1%Fe
62.1%Fe
65.6%Fe
65.2%Fe
Figure 11.
63.8%Fe average grade from surface to 4.5m in drill hole BEKD24 in the north, on Tenement 10430,
high-grade iron ore.
As well as highlighting the weathered massive iron zone, several holes also intercepted iron
mineralisation at depth continuing to confirm potential for a significant iron resource. The
interpreted broad open synform in the southern area means that the southwestern and
southeastern zones are continuous under shallow cover and hence significant tonnage
potential can be seen.
Bekisopa Drilling – October
Drilling continues in the north on a series of deep holes to confirm depth potential beyond
100m. Drilling then moves back to the southern area to complete planned holes designed to
extend that drill grid width and length adding tonnage to the Bekisopa mineral resource
estimate. Ten deep holes have been completed with ten remaining, with some holes extending
to 220m into iron mineralisation.
Drilling Progress Reporting and Communication
Reporting on the next sequence of drill holes, BEKD31 to BEKD42, which are being assayed
at ALS Perth is expected around the week ending 5th of November. The cycle of drilling,
logging, preparation then dispatch to ALS Perth is progressing leading to a proposed JORC
Resource estimation by years end; assuming the drilling equipment, sample preparation,
international logistics and resource estimation continues to plan.
9|Page
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About AKORA Resources
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa Project, the Tratramarina Project and the Ambodilafa Project,
iron ore projects in Madagascar, in all totaling some 308 km2 of tenements across these three
prospective exploration areas. Bekisopa Iron Ore Project is a high-grade magnetite iron ore
project of >4km strike and is the key focus of current exploration drilling and resource
modelling.
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related
scientific and technical information, is based on, and fairly represents information compiled by Mr
Antony Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He is a
shareholder in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years
prior to being engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of Mining
and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG). Mr
Truelove has sufficient experience which is relevant to the styles of mineralisation and types of deposits
under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the matters based
on his information in the form and context in which it appears including sampling, analytical and test
data underlying the results.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Directors of Akora Resources Limited (AKO), as such he is a shareholder in
Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its
processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and
mineral processing results.
Authorisation
This announcement has been authorised by the AKORA Resources Board of Directors on
19 October 2021.
10 | P a g e
Appendix 1
Figure 1A.
The location of the first 18 shallow drill holes of the 2021 drilling campaign shown as marked blue dots
on the main Bekisopa tenements. These first holes are positioned to determine the eastern edge of the
mineralisation along strike and an area of high magnetic intensity on the southwestern side.
Significant Iron Intercepts
Assay results from the first 18 shallow drillholes from the 2021 drilling campaign have now
been received and compiled and show the following significant iron intercepts:
Note: Bold text represents overall intercepts, normal text sub-intercepts; blue text intercepts averaging over 50% Fe.
Hole
Number
BEKD13
From
(m)
0.0
BEKD14
and
14.65
Interval
(m)
14.65
Fe
(%)
64.8
SiO2
(%)
1.9
Al2O3
(%)
1.5
0.09
S
(%)
0.07
80.5
97.55
17.05
39.9
16.6
2.2
0.06
0.79
104.3
107.3
3
30.9
23.9
2.7
0.14
0.06
BEKD15
incl.
0.0
0.0
7.41
3
7.41
3
35.5
59.6
21.9
5.4
18.0
4.6
0.06
0.09
0.04
0.05
Weathered Massive Iron
Weathered Massive Iron
BEKD16
incl.
0.0
0.0
12.7
6.85
12.7
6.85
54.9
65.4
11.4
2.5
5.7
3.0
0.08
0.07
0.02
0.01
Weathered Massive Iron
Weathered Massive Iron
11 | P a g e
To (m)
P (%)
Comments
Weathered Massive Iron
Coarse Disseminated
iron
Coarse Disseminated
iron
BEKD17
incl.
0.0
0.0
5.21
2.71
5.21
2.71
36.2
66.1
22.0
1.4
17.0
1.1
0.08
0.13
0.04
0.06
Weathered Massive Iron
Weathered Massive Iron
BEKD18
incl.
0.0
0.0
4.95
1.43
4.95
1.43
28.3
60.7
33.0
6.7
17.3
2.6
0.06
0.09
0.03
0.08
Weathered Massive Iron
Weathered Massive Iron
BEKD19
incl.
0.0
0.0
35.32
4.59
35.32
4.95
42.6
63.9
17.5
4.0
3.5
3.8
0.13
0.06
0.00
0.00
Weathered Massive Iron
Weathered Massive Iron
BEKD20
0.0
44.67
44.67
34.7
23.2
3.6
0.14
0.19
0
9.95
9.95
43.2
19.1
3.8
0.13
0.01
Weather then Coarse
Disseminated Iron
Weather then Coarse
Disseminated Iron
incl.
BEKD21
No significant
mineralisation
BEKD22
No significant
mineralisation
BEKD23
and
and
0.0
10.0
24.03
2.23
17.09
37.92
2.23
7.09
13.65
59.5
26.4
30.8
6.6
30.7
23.3
5.4
4.1
3.1
0.05
0.21
0.10
0.00
0.00
0.00
Weathered Massive Iron
Fine Disseminated Iron
Coarse Disseminated
Iron
BEKD24
0.0
32.72
32.72
38.8
19.8
4.5
0.21
0.14
incl.
plus
0.0
49.2
3.90
70.91
3.90
21.69
63.7
22.1
3.9
31.4
3.9
3.8
0.04
0.15
0.00
0.01
Weathered Massive then
Coarse Disseminated
Iron
Weathered Massive Iron
Coarse and Fine
Disseminated Iron
BEKD25
0.0
13.81
13.81
43.8
17.7
5.8
0.10
0.01
incl.
4.2
13.81
9.61
54.8
10.2
2.7
0.12
0.01
plus
36.3
48.15
11.83
29.0
24.7
3.2
0.11
0.14
BEKD26
and
0.0
7.7
1.87
10.45
1.87
2.75
40.3
27.9
29.8
25.3
7.6
4.8
0.03
0.08
0.01
0.00
19.98
38.98
19.00
21.3
28.6
4.6
0.10
0.01
BEKD27
0.0
12.55
12.55
29.1
29.3
7.6
0.06
0.02
incl.
0.0
3.51
3.51
40.9
23.1
7.3
0.02
0.00
BEKD28
0.0
4.13
4.13
30.2
37.9
11.9
0.03
0.00
incl.
0.0
2.72
2.72
38.3
28.0
11.4
0.03
0.00
Weathered Massive then
Fine Disseminated Iron
Weathered Massive Iron
BEKD29
incl.
0.0
0.0
9.72
6.24
9.72
6.24
51.1
66.8
14.8
2.1
8.3
2.0
0.04
0.06
0.00
0.00
Weathered Massive Iron
Weathered Massive Iron
BEKD30
incl.
0.0
1
5.0
4.23
5.0
3.23
50.0
57.0
18.4
11.2
6.4
4.5
0.04
0.05
0.01
0.01
Weathered Massive Iron
Weathered Massive Iron
and
Weathered Massive then
Coarse Disseminated
Iron
Weathered Massive then
Coarse Disseminated
Iron
Coarse Disseminated
Iron
Weather Massive Iron
Weathered Fine
Disseminated Iron
Fine Disseminated Iron
Weathered Massive then
Fine Disseminated Iron
Weathered Massive Iron
(Note: Bold represents overall intercepts, sub-intercepts normal text; blue text highlights intercepts averaging
over 50% Fe)
12 | P a g e
JORC Code
Table 1 Section 1 Sampling Techniques and Data
BEKISOPA PROJECT
Criteria
Sampling
techniques
Drilling
techniques
13 | P a g e
JORC Code explanation
• Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g., ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (e.g., core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g., core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit, or
other type, whether core is oriented and if so, by
what method, etc).
Commentary
• Diamond core (HQ or NTW) is split in half using a core saw or splitter (if clayey or
rubbly). A consistent half of the core is broken with a hammer and bagged prior to
dispatch to the preparation laboratory in Antananarivo. Sample interval is
nominally 1m down hole but with samples terminated at lithological boundaries.
• All drilling is diamond core drilling using either NTW (64.2mm inner diameter) or
HQ (77.8mm inner diameter) coring equipment. The holes are generally collared
using HQ and changed to NTW between 3m and 25m downhole. Core is not
orientated. All drillholes are surveyed every 10m using a Reflex EZ-Gyro
gyroscopic multi-shot camera. No surveys to date have varied more than 5° from
the collar survey in either azimuth or declination.
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
14 | P a g e
JORC Code explanation
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Commentary
• Average core recovery is 97% but may be lower in the rubbly part of the
weathered zone. Several one metre intervals returned low recoveries due to
rubbly material. All other intervals gave good recovery, with close to 100% in
fresh rock.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality, and
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• All core was fitted together so that a consistent half core could be collected,
marked up with a “top” line (line perpendicular to dip and strike, or main foliation),
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• During drilling, checks and verifications of the accurate measurement of
penetration depth of drill hole cores were made and observations and recording of
the colour of the water / mud rising from the drill hole were made.
• All drill core was logged quantitatively using industry standard practice on site in
enough detail to allow mineral resource estimates as required.
• Logging included: core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally magnetite or
hematite), mineralisation style, mineralisation %, structure, magnetic susceptibility
(see below), pXRF readings (see below), notes (longhand).
• All core was photographed both wet and dry and as both whole and half core.
• All core was geotechnically logged and RQD’s calculated for every sample
interval.
• All drill-holes were logged using a magnetic susceptibility meter to enable
accurate distinction of iron (magnetite) rich units and to potentially differentiate
between magnetite and hematite rich mineralisation.
• Density measurements were made using both the Archimedes method (mainly
fresh rock) and the Caliper Vernier (mainly regolith) methods.
Criteria
JORC Code explanation
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
15 | P a g e
Commentary
sample intervals decided and marked up and the core subsequently split in half
using a core saw, separating samples into the marked-up intervals. If the core
was clayey or rubbly, it was split in half using a hammer and chisel. The intervals
were nominally 1m, but smaller intervals were marked if a change in geology
occurred within the 1m interval.
• The half core sample intervals were put into polythene bags along with a paper
sample tag. This was then sealed using a cable tie and placed into a second
polythene bag with a second paper tag and this was sealed using staples.
• The samples were subsequently transferred at regular intervals to the sample
preparation facility in Antananarivo (OMNIS) where they will undergo the following
preparation:
o Sorting and weighing of samples
o Drying at 110-120°C until totally dry
o Weighing after drying
o Jaw crushing to 2mm
o Riffle split and keep half as a reference sample
o Collect a 100g sub-sample of 80% passing 2mm material and store
this
o Pulverise to minus 75 micrometres
o Clean ring mill using air and silica chips
o Riffle split and sub-sample 2 sets of 100g pulps
o Store reject pulp
o Conduct a pXRF reading on the minus 75 micrometre pulp
o Weigh each of the sub-samples (minus 2mm, 2 x minus 75
micrometres) and store in separate boxes for ready recovery as
needed
• All assays have been undertaken by ALS in Perth, Australia, using their standard
iron suite. QAQC includes standards, blanks, and duplicates. These are all within
tolerance limits.
Criteria
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
16 | P a g e
JORC Code explanation
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing, and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Commentary
• As this is the first drilling into the project, no twinning is necessary. All data is
entered on site and checked by consultants Vato Consulting before being entered
into an Excel database and sent to Akora.
•
All drill hole collars have been provisionally located using a hand-held GPS (+/-5m
accuracy). Final collars will be picked up at completion of the drilling program.
• All 2020 drillholes have been surveyed using DGPS.
• The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
• Topographic control is country wide data only. An accurate topographic survey
will be undertaken prior to any resource estimation.
• Data spacing is planned to be at 200m x 50m drill spacing which is considered
reasonable for the style of mineralisation being intersected. In several areas with
significant surficial mineralisation, drill-hole density has been closed up to 100m x
50m.
• All samples are assayed as individual, less than 1m long intervals. Composites of
selected intervals will be tested using wet and dry, low intensity magnetic
separation (LIMS).
• The ironstone unit has a strong north-south trend and drilling is generally oriented
to the east. The outcrops, trenches and magnetics all show a steep to shallow
westerly dip and hence the drill direction is considered to be optimal. The drilling
in the south was interpreted as being synclinal in nature with tonnage potential
limited to the keel of the syncline. However, it has been found that the structure is
an orocline and that mineralisation continues at depth in this area. Mineralisation
in the SW zone appears to be sheet-like at present but additional drilling is
required to confirm the true morphology in this location. A single hole oriented to
Criteria
JORC Code explanation
Commentary
the west in the far south of the tenement suggests the sequence is dipping to the
east here, suggesting an anticlinal structure in this area.
• No sample bias is evident.
Sample
security
• The measures taken to ensure sample security.
• Chain of Custody procedures are implemented to document the possession of the
samples from collection through to storage, customs, export, analysis, and
reporting of results. Chain of custody forms are a permanent records of sample
handling and off-site dispatch.
• The on-site Geologist is responsible for the care and security of the samples from
the sample collection to the export stage. Samples prepared during the day are
stored in the preparation facility in labelled sealed plastic bags.
• The Chain of Custody form contains the following information:
• Sample identification numbers;
• Type of sample;
• Date of sampling;
• List of analyses required;
• Customs approval;
• Waybill number;
• Name and signature of sampling personnel;
• Transfer of custody acknowledgement.
• Samples are delivered to the analytical laboratory by courier. A copy of the Chain
of Custody form is signed and dated and placed in a sealable plastic bag taped on
top of the lid of the sample box. Each sample batch is accompanied by a Chain of
Custody form.
• One box of samples was incorrectly sent to ALS Ireland and one to ALS Perth
rather than the other way around. The laboratory subsequently sent the one box
from Ireland to Perth and the box incorrectly sent to Perth was assayed in Perth.
No tampering of either of these boxes was observed.
Audits or
reviews
• The results of any audits or reviews of sampl
Share your feedback
Discover