For the quarter ended 30 September 2025
Quarterly
Report
For the quarter ended
30 September 2025
AKORA Resources Ltd
ABN 90 139 847 555
ASX Code: AKO
www.akoravy.com
AKORA is advancing its Stage 1
high-grade Direct Shipping Iron
Ore (DSO) mine in Madagascar,
where studies indicate strong
margins with low upfront capital
and operating costs.
Future plans see the potential
development of a premium priced
high grade iron concentrate to
support the Green Steel (low
carbon emissions) initiatives.
• Placement of $0.83 million and Entitlement
Offer of $2.08 million successfully completed.
• Site visits confirm strong endorsement from
local Communities and Government.
• Commencement of a surface trenching
exploration program at the Bekisopa Project
aimed at expanding the resource footprint of
the near surface Direct Shipping Ore.
Highlights
2
For the quarter ended 30 September 2025
Bekisopa Iron Ore Project
Ownership 100% | Madagascar, Africa
AKORA is advancing plans at Bekisopa to produce up to 2 million tonnes per annum (Mtpa) of a
60% Fe average grade Direct Shipping Ore (DSO) for export to Blast Furnace-Basic Oxygen
Furnace (BF-BOF) steelmakers. Bekisopa’s high-grade iron ore may also be upgraded to a +67%
Fe concentrate at 75 microns for shipping to Direct Reduced Iron-Electric Arc Furnace (DRI-EAF)
steelmakers to make greener steel, produced without using coal and generating considerably
less carbon emissions.
Completed by Wardell Armstrong International (now a part of the global SLR Consulting group), a Pre-
Feasibility Study (PFS) released in March 2025 confirmed Bekisopa’s planned Stage One Direct
Shipping Ore (DSO) operation could produce 2 million tonnes per annum (Mtpa) of blended grade lump
and fines iron ore products at a 61.6% Fe average for blast furnace steelmakers1.
The significant scale and particular mineralisation characteristics of Bekisopa’s iron ore resource
presents the Company with a staged development program:
1. Stage 1: Produce ~61.6% Fe average grade direct shipping iron ore (DSO): Mine, crush and screen
the at surface ‘weathered zone’ iron ore to produce a LOM average blended grade of 61.6%Fe across
the lump and fines product for shipping to Blast Furnace-Basic Oxygen Furnace (BF-BOF) steelmakers
via a port at Toliara. A Fines product could be delivered at an average LOM grade of 61.4% Fe and a
Lump product at an average LOM grade of 61.8% Fe.
2. Stage 2: Produce +67% Fe grade Direct Reduced iron concentrate: Using cash generated from the
DSO start-up production, mining the underlying fresh mineralisation and adding grinding and magnetic
separation circuits to upgrade ore to a +67% Fe low impurity concentrate at 75 microns for shipping to
Direct Reduced Iron-Electric Arc Furnace (DRI-EAF) steelmakers via a port of Toliara. The DRI-EAF
process is used to manufacture greener steel with considerably less carbon emissions.
The PFS for Stage 1 considers using contract mining and mobile processing equipment (crushing,
screen, and with magnetic separation after Year 3), and conveying, contract truck hauling of the product,
as well as operating barges and a floating crane at the existing Toliara port.
Placement and Entitlement Offer
During the quarter, AKORA raised $832,830 via a Placement. In addition, an Entitlement Offer of
$2,085,229 was fully subscribed. AKORA received $1,657,436 during the quarter and will receive
$427,793 in the December quarter.
The funds raised under the Placement and Entitlement Offer will be used by the Company for the
following:
(a) Bekisopa Project Development Works:
(i). Progression of the Memorandum of Understanding (MoU) with the government of
Madagascar;
(ii). Commencement of the Feasibility Study;
1
Refer ASX release dated 31 March 2025 Bekisopa high-grade iron ore project PFS confirms a robust 2Mtpa DSO Operation
with an 86% IRR.
3
For the quarter ended 30 September 2025
(iii). Continuation of the Environment Impact Assessment; and
(iv). Permitting and licencing activities, including progression to the grant of a Mining Licence for
the Bekisopa Project;
(b) Ongoing advancement of the strategic investor process;
(c) Continued community engagement initiatives;
(d) Tenement maintenance; and
(e) General working capital requirements.
Figure 1. AKORA has two tenements covering the Bekisopa Project, with the main PR10430 covering
25km2.
The PFS shows that most of the exploration drilling and importantly the start-up mining areas are all
contained within the main tenement PR10430.
All AKORA tenements in Madagascar remain in good standing. Tenement PR10430 was renewed
during the June 2025 quarter, with PRE3757, located on the northern zone of the Bekisopa Project area,
to be renewed in the forthcoming Government licence renewal cycle. The Company’s other tenements
have been submitted for renewal during the quarter, with processing expected later this year.
4
For the quarter ended 30 September 2025
Bekisopa Project receives strong endorsement from local communities and government.
Bekisopa has been identified as a Government Project of Significance which has the support of the
National Government2. The local communities at Tanamarina and Bekisopa are supportive of the
Company and its plans to develop an iron ore mining operation, viewing it as a significant opportunity for
investment into the local communities and providing education, health, training and employment
opportunities. Local villagers have gained employment opportunities and played a key role in supporting
the Company throughout the PFS process. During the quarter visits with regional representatives from
the Ministry of Mines and local community reaffirmed strong support for the Bekisopa Project.
AKORA will continue to work proactively with all stakeholders and continue to prioritise its local
Communities in the areas that it works.
Figure 2. Mining Ministry and community leaders inspecting the Bekisopa Project site.
Bekisopa 2025 iron ore mineral resource expansion program gets underway
To date, some 40% of the Bekisopa magnetic anomaly has been drilled, leaving significant exploration
potential along the 6 kilometre strike length (Figure 3). Five drilling campaigns have been conducted since
2021 with the latest program in 2024. This has resulted in a maiden Mineral Resource Estimate3 in April
2022 of 194.7Mt of inferred mineralisation grading 32% Iron, and a series of updated Mineral Resource
Estimates for the surface DSO culminating in the latest update in February 20254 with a resource of 10.6Mt
at 54.8%Fe.
AKORA is leveraging historical exploration undertaken by the French Geological Survey group from their
exploration in the 1950’s and 60’s, together with its own surface magnetics results to develop a trenching
program aimed at expanding the site’s DSO resource. The historical pits and trenches across the
Bekisopa Project area have been located, cleaned and mapped providing critical datasets for DSO
identification and refinement of the geological model. Once mapping has been completed a plan to
excavate some 240 to 300 metres of trenches will be established.
These trenches will be excavated to a depth of not greater than 2 metres and will be located in the regions
outside of the known resource footprint. The Company is undertaking a trenching program in place of
2
Refer ASX release dated 8 October 2024 Mines Minister supports Bekisopa Project
3
ASX Announcement – Bekisopa Maiden Inferred Resource April 11, 2022
4
ASX Announcement – Bekisopa MRE Increase February 25, 2025
5
For the quarter ended 30 September 2025
drilling, capitalising on the resource’s surface outcrop. This approach provides a highly cost effective
means of evaluating and expanding the mineral resource prior to committing to deeper drilling.
Figure 3. Bekisopa Project Area – Surface Magnetics overlayed with exploration drill hole locations
showing targeted exploration area.
The site trenching program will focus on the region between the southern and central mining pits
(highlighted in red box in the figure above). A number of priority areas have been identified based on
potential surface outcrops, underlying magnetic anomaly and further supported by the presence of
historical pits and trenches. The exploration program will conclude by the end of October 2025, with results
due back from laboratories in early 2026.
6
For the quarter ended 30 September 2025
Figure 4. Bekisopa Project Area – High Magnetic Anomaly with historical pits and trenches identified.
Figure 5. Bekisopa Trenching – 2025 program in progress
7
For the quarter ended 30 September 2025
Satrokala Project
Ownership 100% | Madagascar
AKORA’s Satrokala Iron Ore Project has emerged as a significant prospect after a recent
magnetic survey5
identified a major anomaly up to 10km long and 2km wide, making it some 66%
larger than the Company’s more advanced Bekisopa Iron Ore Project.
In 2024, a maiden drilling program targeting the magnetic anomaly was completed at Satrokala, which
returned substantial intersections of low-grade iron mineralisation across all five holes of the sighter
exploratory drilling program over 500m. This is a positive sign that the mineralised systems is continuous
and supports a broader, near surface iron formation extending across the Satrokala anomaly.
No activities were completed at Satrokala during the quarter while the Company focused on delivering
key milestones for its flagship Bekisopa Project.
Figure 6. Satrokala drill plan and the associated ground magnetic survey results.
5
Refer ASX Release dated 20 March 2024 – Satrokala Magnetic Survey Results
8
For the quarter ended 30 September 2025
Corporate
Cash Position
AKORA Resources Limited held cash reserves at the end of quarter of approximately $1.64 million.
Proceeds from the entitlement offer of $0.4 million will be received in the December 2025 quarter,
providing additional liquidity to support ongoing operations and growth initiatives.
Markets and Outlook
The iron ore price saw a significant surge during the quarter surpassing the $100/t mark during July,
primarily due to expectations of demand recovery and macroeconomic factors. The iron ore price
remained around $105/t at the end of the quarter, 30 September 2025. The global iron ore inventories
showed stability during the quarter as the market faced uncertainties due to geopolitical tensions and
evolving supply side demand dynamics.
Shareholder Information
As at 30 September 2025, the Company had 700 shareholders and 168,391,886 ordinary fully paid
shares on issue with the top 20 shareholders holding 55.76% of the total issued capital.
ASX Additional Information
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter was
$362,001. Full details of exploration activity during the quarter are set out in this report.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and development
activities during the quarter.
ASX Listing Rule 5.3.5: Payment to related parties of the Company during the quarter was $125,090 in
cash. A description of and explanation for payments to related parties and their associates per Section
6.1 of the Appendix 5B following this Quarterly Activities Report is set out in the table below:
Director Remuneration Current Quarter
Managing Director fees 87,501
Non-Executive Director fees 35,000
Superannuation 2,589
Total 125,090
Board and Senior Management
Graeme Hunt Non-executive Chairman
Peter Bird Managing Director & Chief Executive Officer
Matthew Gill Non-executive Director
Shane Turner Chief Financial Officer & Company Secretary
Jason Whittle General Manager – Development
James Deo Senior Advisor – Corporate Development
ASX Announcements during the quarter
9
For the quarter ended 30 September 2025
The following material announcements were lodged on the ASX Market Announcements Platform during
the quarter:
Date Description
24 July 2025 Bekisopa Receives Strong Support from Communities & Governments
31 July 2025 30 June 2025 Quarterly Activities & Cashflow Report
5 August 2025 Equity Raise comprising of Placement and Entitlement Offer
11 September 2025 Half Yearly Report and Accounts
22 September 2025 Shortfall of Entitlement Offer Placed
These announcements are available for viewing on the Company’s website www.akoravy.com.
Other details
Head Office
12 Anderson Street West
Ballarat Vic 3350
Phone: +61 438 871 995
Website: www.AKORAvy.com
This announcement is authorised by the Board.
For further information contact:
Peter Bird
Managing Director
AKORA Resources
info@akoravy.com
10
For the quarter ended 30 September 2025
Competent Persons’ Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist
(Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific Professions (SACNASP).
Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and the activity being undertaken to qualify as a Competent Person as
defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the
2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the information in this release in the
form and context in which it appears.
The information in this document that relates to the Mineral Resource estimate of the Bekisopa project is
based on, and fairly represents information and supporting documentation compiled and reviewed by
Mr. Richard Ellis, a full-time employee of Wardell Armstrong International and independent of Akora
Resources. Mr. Ellis is a Chartered Geologist (CGeol) and Fellow of the Geological Society of London,
and European Geologist (EurGeol) of the European Federation of Geologists, and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012
edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves" ('JORC Code'). Mr. Ellis consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
The information in this document that relates to the Ore Reserve estimate for the Bekisopa project, is
based on and fairly represents information and supporting documentation compiled and reviewed by Mr.
Colin Davies, a full-time employee of Wardell Armstrong International and independent of Akora
Resources. Mr. Davies is a Chartered Mining Engineer (CEng), a Member of the Institute of Materials,
Minerals and Mining UK (MIMMM), and Qualified for Minerals Reporting (QMR). Mr. Davies has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves" ('JORC Code'). Mr. Davies consents to the inclusion in the report of the
matters based upon the information in the form and context in which it appears.
11
For the quarter ended 30 September 2025
Tenement Interests
As at 30 September 2025, the company had interests in the following tenements (as required by Listing
Rule 5.3.3). There were no changes in the company’s interests in tenements during the quarter.
Project Location
Tenement
Number
Blocks Current Interest
Bekisopa PR Madagascar, Africa 10430 64 100%
Bekisopa PR Madagascar, Africa 27211 128 100%
Bekisopa PR Madagascar, Africa 35827 32 100%
Bekisopa PRE Madagascar, Africa 3757 16 100%
Samelahy PR Madagascar, Africa 6595 98 100%
Samelahy PR Madagascar, Africa 13011 33 100%
Samelahy PR Madagascar, Africa 21910 3 100%
Tratramarina East PR Madagascar, Africa 16635 144 100%
Tratramarina East PR Madagascar, Africa 16637 48 100%
Tratramarina East PR Madagascar, Africa 17245 160 100%
Tratramarina West PRE Madagascar, Africa 18379 16 100%
Tratramarina West PRE Madagascar, Africa 18891 48 100%
12
For the quarter ended 30 September 2025
Mineral Resources and Ore Reserves
Table 1. Bekisopa Mineral Resource Estimate (Inferred Resource) at 30 September 2025
Table 2. Bekisopa 2025 Ore Reserve Estimate
Notes:
1. The effective date of the Ore Reserve estimate is 07 February 2025.
2. The Ore Reserves estimate is reported in accordance with the guidelines of the JORC Code (2012). 3. Variable cut-off
grades have been applied to meet product requirements, of Enriched >60% Fe, Intermediate A 40-60% Fe, and Intermediate B
30-40% Fe.
4. The Ore Reserve estimate is based on optimisation parameters including a selling price of $110/t for 62% Fe concentrate and
takes into account Modifying Factors related to mine design, geotechnical parameters, mining and processing costs, processing
recoveries, G&A, ESG and royalty costs. Mining dilution varies by domain between 1-3% based on diggability and rippability
considerations. Mining recovery varies between 97-99% by domain.
5. Quantities are in dry metric tonnes as transported to the ROM. Figures have been rounded to an appropriate level of
precision. Due to rounding some totals may not compute exactly as shown.
13
For the quarter ended 30 September 2025
Table 3. Bekisopa MRE Direct Shipping Ore Zone
Mineral Resource Estimate for the Bekisopa Project
Free Digging and Rippable Mineral Resources, 7 February, 2025
Classification Tonnes (Kt) Density (t/m3
) Fe (%) SiO2 (%) Al2O3 (%) P (%)
Bekisopa South
Enriched DSO
Indicated 5,724 3.39 60.3 6.1 3.6 0.10
Inferred 902 2.99 55.9 7.7 4.7 0.10
Intermediate A
Indicated 1,231 2.38 40.5 23.1 8.2 0.10
Inferred 105 2.33 40.1 23.6 7.4 0.07
Intermediate B
Indicated 260 2.54 34.3 29.3 4.9 0.15
Inferred 765 3.41 39.0 24.7 4.6 0.13
Bekisopa Central
Enriched DSO
Indicated 560 3.19 54.9 11.1 6.1 0.06
Inferred 15 3.07 53.5 12.0 6.4 0.06
Intermediate A
Indicated 605 2.65 38.7 23.7 7.4 0.11
Inferred 42 2.65 38.9 23.1 7.6 0.11
Intermediate B
Indicated 59 2.75 31.2 2.7 4.2 0.18
Inferred 187 3.2 38.1 17.6 2.6 0.12
Bekisopa North
Enriched DSO
Indicated 349 3.11 58.5 7.5 5.46 0.09
Inferred 955 3.49 52.6 11.3 3.4 0.21
Intermediate A
Indicated - - - - - -
Inferred 111 2.52 39.3 23.2 5.9 0.13
Intermediate B
Indicated - - - - - -
Inferred 748 2.71 32.8 23.6 3.7 0.16
Bekisopa Total
Classification Tonnes (Kt) Density (t/m3
) Fe (%) SiO2 (%) Al2O3 (%) P (%)
Enriched DSO
Indicated 6,633 3.36 59.7 6.6 3.9 0.10
Inferred 1,872 3.22 54.2 9.6 4.0 0.16
Intermediate A
Indicated 1,836 2.46 39.9 23.3 7.9 0.10
Inferred 258 2.46 39.5 23.3 6.8 0.10
Intermediate B
Indicated 319 2.57 33.7 29.0 4.7 0.16
Inferred 1700 3.04 36.2 23.4 4.0 0.15
14
For the quarter ended 30 September 2025
Notes
1. Mineral Resources of the Enriched zones are reported within wireframe boundaries interpreted at nominal
cut-off grades of 58% Fe for Bekisopa South and North and 50% Fe for Bekisopa Central. Mineral
Resources of the Intermediate A zones are reported within wireframe boundaries interpreted at a nominal
cut-off grade of 35% Fe. Mineral Resources of the Intermediate B zones are reported at a cut-off grade of
30% Fe.
2. Mineral Resources are limited by an optimised open pit shell based on appropriate technical and economic
parameters.
3. Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a Pre-
Feasibility Study or Feasibility Study.
4. Mineral Resources are reported inclusive of any Ore Reserves.
5. Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by
Richard Ellis, an independent Competent Person as defined by JORC.
6. The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title,
taxation, socio-political, marketing or any other relevant issues.
7. All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due
to rounding.
15
For the quarter ended 30 September 2025
Company Profile
Cleaner iron ore for greener steel
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development
of four high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (Mt) Inferred JORC Resource (ASX
Announcement 11 April 2022) with very low impurities able to produce a premium-priced +68% Fe concentrate.
Direct Reduced Iron-Electric Arc Furnace technology which is used to make greener steel without coal and
considerably less carbon emissions requires iron ore grades of at least 67%.
(ASX Announcement – Bekisopa Scoping Study, 14 November 2023)
To generate cash in the near-term, AKORA is advancing plans at Bekisopa for a Stage1, 2Mt per annum Mine with
a six year life of mine, producing 61.6% Fe average grade lump and fine direct shipping ore (DSO) for shipping to
Blast Furnace steelmakers.
(ASX Announcement - Bekisopa Pre Feasibility Study, 31 March 2025)
The Company confirms that it is not aware of any new information or data that materially affects the above and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
And further the Company confirms that all material assumptions underpinning the 2Mt per annum production target continue to apply and have
not materially changed.
16
For the quarter ended 30 September 2025
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AKORA Resources Limited
ABN Quarter ended (“current quarter”)
90 139 847 555 30 September 2025
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9-months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs (217) (399)
(e) administration and corporate costs (462) (1,054)
1.3 Dividends received (see note 3)
1.4 Interest received 1 4
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other
(Cash Boost from Commonwealth
Government)
1.9 Net cash from / (used in) operating
activities
(678) (1,449)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation (362) (1,036)
(e) investments
(f) other non-current assets
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
17
For the quarter ended 30 September 2025
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9-months)
$A’000
2.5 Other
2.6 Net cash from / (used in) investing
activities
(362) (1,036)
3. Cash flows from financing activities
2,490 3,668
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(144) (196)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing
activities
2,346 3,472
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
330 649
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(678) (1,449)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(362) (1,036)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
2,346 3,472
4.5 Effect of movement in exchange rates on
cash held
4.6 Cash and cash equivalents at end of
period
1,636 1,636
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in
the consolidated statement of cash
flows) to the related items in the
accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 137 1
5.2 Call deposits 1,495 325
5.3 Bank overdrafts
5.4 Other US dollar accounts 4 4
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,636 330
18
For the quarter ended 30 September 2025
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
125
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: Salaries and superannuation for directors.
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Add notes as necessary for an understanding of
the sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities
7.2 Credit standby arrangements
7.3 Other (Convertible Notes)
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
$A’000
8.1 Net cash from / (used in) operating activities (item 1.9) 678
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
362
8.3 Total relevant outgoings (item 8.1 + item 8.2) 1,040
8.4 Cash and cash equivalents at quarter end (item 4.6) 1,636
8.5 Unused finance facilities available at quarter end (item 7.5)
8.6 Total available funding (item 8.4 + item 8.5) 1,636
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.57
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A.”
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating cash
flows for the time being and, if not, why not?
No. Unused Annual Leave and Long Service Leave payment to former Managing Director of
$85K paid during September quarter.
19
For the quarter ended 30 September 2025
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to
fund its operations and, if so, what are those steps and how likely does it believe that they
will be successful?
Yes. $427K of Entitlement Offer Shortfall to be received in December 2025 quarter.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Yes. See answers to 8.8.1 and 8.8.2.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing
Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 8 October 2025
Authorised by: Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the
past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information
over and above the minimum required under the Listing Rules is encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB
6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent
standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the
accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board.” If it has been authorised
for release to the market by a committee of your board of directors, you can insert here: “By the [name of board committee – e.g. Audit and Risk
Committee].” If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee.”
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with
recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the board should have
received a declaration from its CEO and CFO that, in their o