High Grade Iron Mineralisation Extended at Bekiopa Project
Released
Released
Announcement PDF
25 February 2026
ASX RELEASE
High Grade Iron Mineralisation Extended at the Bekisopa
Project, Madagascar.
Highlights
• 339 metres of trenching delivers further easily accessible Direct Shipping (DSO) high-
grade iron ore between the existing JORC South and Central resource zones1
.
• All 8 trenches intersect iron mineralisation.
• Best high-grade iron Direct Shipping Ore (DSO) trenching intercepts:
Trench Number Trench length (metres)
Average Iron Grade
(%Fe)
BEKT001 36 63.8
including 14.5 66.3
BEKT002 87 60.5
including 33.2 64.4
• Results reinforce strong upside to expand the Indicated DSO Resource footprint of the
Bekisopa tenement.
AKORA Resources Limited’s (ASX: AKO) (AKORA or Company) released the Pre-Feasibility
Study for the Bekisopa DSO Iron Ore Project1
in south central Madagascar in March 2025. As
AKORA works towards detailed feasibility study activities, it continues to make progress with
exploration activities.
Assays from the Company’s sixth exploration campaign at Bekisopa2
completed in October 2025,
have returned multiple high-grade iron intersections of DSO style mineralisation in a region not
previously drilled between the known Southern and Central Resource zones. The surface
trenching program consisted of 8 exploration trenches totalling 339 metres in length to typically a
maximum depth of 2 metres, with some deeper.
AKORA Managing Director and CEO, Mr Peter Bird said, “We are very encouraged by the latest
trenching results to test the northern extensions of Bekisopa’s high-grade iron ore Southern Zone.
The trenching of the high-grade DSO mineralisation from surface is a strong validation of the
geological continuity between our existing southern and central resource zones. Importantly, all
eight trenches intersected iron mineralisation, highlighting consistency and scale potential of the
system.
1
ASX Announcement Bekisopa PFS, 31 March 2025
2
ASX Announcement Bekisopa Trenching Exploration Update, 11 November 2025
info@akoravy.com
ACN 139 847 555
ASX: AKO
www.akoravy.com
AKORA Resources Limited
PO Box 28
Ballarat Victoria 3350
Australia
2
The results reinforce our confidence in the significant upside potential to expand the Indicated
DSO Resource footprint across the Bekisopa tenement. Identifying easily accessible, high-
grade DSO mineralisation between resource zones improves the potential for more mine life
and strengthens our development pathway and supports our strategy of progressing Bekisopa
as a robust, staged iron ore project.”
Some 50% of the Bekisopa tenement remains unexplored. Magnetic surveys show significant
magnetic anomalies along the 6 kilometre strike that has yet to be drilled. The trenching
program, used as a low-cost exploration technique, has targeted areas of known magnetic
anomalies (Figure 1) and areas with visible outcropping iron mineralisation (Figure 2), outside
of the known mineral resource.
3
Figure 1. Map showing drill holes, historical pit locations, magnetic results and the mapping
and trenching areas at Bekisopa (Areas 1, 2 & 3)
4
Figure 2. Satellite Imagery of the tenement, exploration drill holes and areas 1,2 & 3. Imagery
shows zones of red soil out cropping in between southern and central resource areas.
5
Trenching Program
The Bekisopa mapping and trenching program has confirmed extensions of high-grade iron
mineralisation and Direct Shipping Ore (DSO) material from surface and within the regolith
(weathered/oxidation zone). In total, 1.5 square kilometres were mapped and 8 trenches were
completed and 338.7m excavated (Table 1).
Table 1 – Bekisopa trench collars summary:
Trench_ID Utm38sX Utm38sY Elev_m Length_m Azm_deg Inc_deg
BEKT001 586,868 7,609,122 870 36.00 42 0
BEKT002 586,796 7,609,269 855 87.40 79 0
BEKT003 586,837 7,609,186 865 20.10 90 0
BEKT004 586,905 7,609,085 870 30.00 90 0
BEKT005 586,613 7,608,652 848 42.70 81 0
BEKT006 586,898 7,609,268 860 30.00 90 0
BEKT007 586,930 7,609,167 869 31.50 90 0
BEKT008 586,899 7,609,023 866 61.00 83 0
A total of eight trenches were completed within two areas with 338.70 metres manually
excavated to a maximum of 2 metre depth where possible. Within Area 1, seven trenches
(BEKT001, BEKT002, BEKT003, BEKT004, BEKT006, BEKT007 and BEKT008) were
completed, and within Area 2 one trench (BEKT005) was completed (Figure 3 and Figure 4).
Figure 3 - Area 2 Trenching Map
6
Figure 4 - Map showing Area 1 trenching north of Southern Zone prospect
A total of 332 horizontal samples and 33 vertical samples were sent for analysis (Appendix 1).
Density and magnetic susceptibility analysis was also completed. All trenches intersected iron
mineralisation and lithologies included massive magnetite-hematite, saprock of magnetite-
hematite and saprock of magnetite-bearing gneisses. Trench cross sections with weighted Fe
7
averages are detailed in Appendix 2. Trench profiles showing lithologies with magnetic
susceptibility and iron (Fe) assay results are detailed in Appendix 3.
Weighted averages for Al2O3, Fe, P, S and SiO2 were calculated for the iron mineralisation and
higher-grade DSO intersections (Table 2 and Table 3).
Highlighted results for the horizontal DSO interceptions include:
• BEKT001 - 36m @ 63.77% Fe including 14.5m @ 66.30% Fe
• BEKT002 - 87.4m @ 60.51% Fe including 33.2m @ 64.36% Fe
• BEKT003 - 20.1m @ 48.20% Fe, including 6.4m @ 57.06% Fe
• BEKT004 - 30.1m @ 52.62% Fe, including 7.7m @ 60.25% Fe
• BEKT006 - 25.4m @ 52.86% Fe, including 18.2m @ 61.32% Fe
• BEKT007 - 31.5m @ 39.00% Fe, including 12.5m @ 61.22%Fe
• BEKT008 - 61m @ 41.11% Fe, including 4m @ 52.31% Fe
Highlighted results for the vertical DSO interceptions include:
• BEKT001_01 - 2.9m @ 58.43% Fe including 2m @ 60.65% Fe
• BEKT001_08 - 4m @ 50.85% Fe, including 2.4m @ 59.62% Fe
• BEKT001_18 - 2.6m @ 66.85% Fe
• BEKT002_20 - 4.1m @ 63.47% Fe
• BEKT002_41 - 4m @ 43.96%Fe, including 1.7m @ 59.27% Fe
• BEKT002_81 - 4m @ 41.80%Fe, including 1.4m @ 62.99% Fe
8
Table 2 - Horizontal weighted assay results.
Table 3 - Vertical weighted assays results.
Trench_ID From_m To_m Interval_m Al2O3_pct Fe_pct P_pct S_pct SiO2_pct Mineralisation_Weathering
BEKT001_01 0.00 2.90 2.90 2.40 58.43 0.344 0.093 3.14 Iron mineralisation
incl. 0.00 2.00 2.00 1.11 60.65 0.352 0.114 1.77 Weathered (oxidised) DSO
BEKT001_08 0.00 4.00 4.00 6.77 50.85 0.249 0.050 10.64 Iron mineralisation
incl. 0.00 2.40 2.40 2.19 59.62 0.327 0.076 2.40 Weathered (oxidised)
BEKT001_18.
5
0.00 2.60 2.60 1.26 66.85 0.083 0.040 1.41 Iron mineralisation
incl. 0.00 2.60 2.60 1.26 66.85 0.083 0.040 1.41 Weathered (oxidised) DSO
BEKT002_01 0.00 4.00 4.00 4.62 59.82 0.136 0.012 5.89 Iron mineralisation
incl. 0.00 2.00 2.00 3.54 62.11 0.120 0.016 4.56 Weathered (oxidised) DSO
BEKT002_20 0.00 4.10 4.10 3.13 63.47 0.192 0.027 3.29 Iron mineralisation
incl. 0.00 4.10 4.10 3.13 63.47 0.192 0.027 3.29 Weathered (oxidised) DSO
BEKT002_41 0.00 4.00 4.00 6.36 43.96 0.085 0.013 21.00 Iron mineralisation
incl. 0.00 1.70 1.70 4.78 59.27 0.102 0.019 6.04 Weathered (oxidised)
Trench_ID From_m To_m Interval_m Al2O3_pct Fe_pct P_pct S_pct SiO2_pct Mineralisation_Weathering
BEKT001 0.00 36.00 36.00 1.72 63.77 0.178 0.054 2.12 Iron mineralisation
incl. 0.00 36.00 36.00 1.72 63.77 0.178 0.054 2.12 Weathered (oxidised) DSO
incl. 13.50 28.00 14.50 1.47 66.30 0.095 0.037 1.70 Weathered (oxidised) DSO
BEKT002 0.00 87.40 87.40 4.19 60.51 0.145 0.025 5.17 Iron mineralisation
incl. 3.00 5.50 2.50 2.52 63.52 0.164 0.033 2.80 Weathered (oxidised) DSO
incl. 17.00 19.00 2.00 2.59 63.42 0.244 0.028 2.53 Weathered (oxidised) DSO
incl. 21.00 26.00 5.00 2.38 64.41 0.215 0.069 1.67 Weathered (oxidised) DSO
incl. 40.60 42.00 1.40 2.61 64.49 0.144 0.031 2.22 Weathered (oxidised) DSO
incl. 51.80 85.00 33.20 2.51 64.36 0.149 0.031 2.77 Weathered (oxidised) DSO
BEKT003 0.00 20.10 20.10 5.60 48.20 0.304 0.042 15.79 Iron mineralisation
incl. 2.15 5.75 3.60 5.10 55.27 0.237 0.053 8.46 Weathered (oxidised)
incl. 9.50 15.90 6.40 3.14 57.06 0.557 0.083 4.87 Weathered (oxidised)
BEKT004 0.00 30.10 30.10 5.36 52.62 0.268 0.051 10.96 Iron mineralisation
incl. 0.00 7.70 7.70 2.65 60.25 0.296 0.062 4.13 Weathered (oxidised) DSO
incl. 15.80 18.80 3.00 5.40 55.91 0.316 0.019 8.21 Weathered (oxidised)
incl. 22.70 28.50 5.80 3.40 56.28 0.203 0.107 6.28 Weathered (oxidised)
BEKT005 0.00 42.70 42.70 6.21 41.26 0.037 0.004 23.21 Iron mineralisation
incl. 1.75 12.40 10.65 6.61 52.94 0.025 0.005 12.46 Weathered (oxidised)
BEKT006 0.00 25.40 25.40 5.58 52.86 0.102 0.049 11.08 Iron mineralisation
incl. 4.50 22.70 18.20 2.80 61.32 0.128 0.064 3.72 Weathered (oxidised) DSO
BEKT007 0.00 31.50 31.50 10.08 39.00 0.079 0.058 23.53 Iron mineralisation
incl. 6.00 18.50 12.50 0.96 61.22 0.142 0.128 3.37 Weathered (oxidised) DSO
BEKT008 0.00 61.00 61.00 9.99 41.11 0.131 0.018 22.15 Iron mineralisation
incl. 1.00 3.80 2.80 3.46 58.80 0.208 0.053 6.11 Weathered (oxidised)
incl. 11.20 13.40 2.20 3.75 57.67 0.298 0.078 5.54 Weathered (oxidised)
incl. 16.50 20.50 4.00 6.63 52.31 0.193 0.052 11.14 Weathered (oxidised)
9
BEKT002_81.
5
0.00 4.00 4.00 8.83 41.80 0.067 0.008 22.98 Iron mineralisation
incl. 0.00 1.40 1.40 3.13 62.99 0.107 0.012 4.59 Weathered (oxidised) DSO
Density Results
A total of 55 density measurements were completed on samples selected from mineralisation
material in the weathered zone during this program. The Archimedes method (mainly fresh
competent rock) was used. Calculated densities for DSO material varied from 3.02 g/cm3
to 4.49
g/cm3
, with an average of 3.69 g/cm3
.
The DSO material consists of several lithologies with specific densities as summarised below;
• Saprock-massive magnetite-hematite with Fe grades between 49.4% and 65.0%
→ Average density of 3.63 g/cm3
• Massive magnetite-hematite with Fe grades between 59.3% and 66.9%
→ Average density of 3.73 g/cm3
These field determined density measurements are comparable to that expected for iron
magnetite and hematite mineralisations at these high grades and are higher than applied in the
previous mineral resource estimations that used an average at 3.4 g/cm3
.
Conclusions
The Bekisopa trenching program completed 339 metres of trenching. 332 horizontal and 33
vertical samples were assayed. All 8 trenches intercepted high-grade DSO iron mineralisation
with a number of high-grade iron intercepts demonstrating the continued prospectivity of the
high-grade iron ore Bekisopa tenement.
Next Steps
• The exploration results will be forwarded to Wardell Armstrong International (WAI) to
complete an update of the Bekisopa Mineral Resource Estimate.
This announcement has been authorised by AKORA Resources Limited’s Board of
Directors.
For further information please contact:
Peter Bird
Managing Director
E: info@akoravy.com
www.akoravy.com
10
Competent Persons Statements
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist
(Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific Professions (SACNASP).
Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and the activity being undertaken to qualify as a Competent Person as
defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the
2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the information in this release in the
form and context in which it appears.
11
Cleaner iron ore for greener steel
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development of four
high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (mt) Inferred JORC
Resource (ASX Announcement 11 April 2022) with very low impurities able to produce a premium-priced
+68% Fe concentrate. Direct Reduced Iron-Electric Arc Furnace (DRI-EAF) technology which is used to
make greener steel without coal and considerably less carbon emissions requires iron ore grades of at
least 67%.
To generate cash in the near-term, AKORA is advancing plans at Bekisopa to produce up to 2Mt per
annum over the first five years of a 60% Fe average grade direct shipping ore (DSO) (ASX
Announcement 14 November 2023) for shipping to Blast Furnace-Basic Oxygen Furnace (BF-BOF)
steelmakers.
The Company confirms that it is not aware of any new information or data that materially affects the above and that
all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed.
12
Appendix 1: Bekisopa trenches - vertical locations summary
Trench_ID Utm38sX Utm38sY Elev_m Length_m Azm_deg Inc_deg
BEKT001_01 7,609,123 586,869 870 2.90 0 -90
BEKT001_08 7,609,128 586,873 872 4.00 0 -90
BEKT001_18.5 7,609,136 586,880 873 2.60 0 -90
BEKT002_01 7,609,269 586,797 855 4.00 0 -90
BEKT002_20 7,609,273 586,816 856 4.10 0 -90
BEKT002_41 7,609,277 586,837 857 4.00 0 -90
BEKT002_81.5 7,609,284 586,876 857 4.00 0 -90
Appendix 2: Cross Sections with weighted Fe averages
13
14
15
16
17
Appendix 3: Logs showing Lithologies with Magnetic Susceptibility
and Fe Assay Results
18
19
20
21
22
23
24
Appendix 4:
JORC Code, 2012 Edition - Table 1 - Bekisopa Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Trenching program was undertaken, and trenches were
manually excavated perpendicular to the strike of the iron
mineralisation trends.
• The trenches were geologically logged and systemically sampled
by using hammers/chisels. Horizontal samples were taken
across the centre to base of the trenches and vertical samples
were taken on the wall of the trenches.
• Sample intervals varied between 1 to 2 metres, typical 3-10kg.
• Total of the 332 horizontal samples and 33 vertical samples
were sent to a preparation laboratory (OMNIS) in Antananarivo,
Madagascar where samples were oven dried, manually crushed
to -2mm, split twice through a 50/50 riffle splitter to obtain a
representative sub-sample of approx. 100g, and then pulverise
that >85 % pass -75 μm.
• Pulp samples were sent to an accredited laboratory (ALS) in
Perth, Australia for determination of total iron and a standard
“iron suite” of elements by XRF analyses using techniques ME-
XRF21u for standard iron-ore XRF analysis and method ME-
GRA05 for LOI analysis.
• QA/QC procedures applied with alternating standards and
blanks inserted every 20 samples, and four duplicates (field and
lab) inserted every 100 samples.
26
Criteria JORC Code explanation Commentary
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• No drilling was completed.
• Trenches were manually excavated using picks, shovels,
crowbars etc with dimensions of 1-1.5m in widths and up to 2m
deep. A total of 8 trenches (BEKT001 to BEKT008) were
completed and 338.7 metres excavated.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• No drilling was completed.
• Trench sample material was collected using rock pick hammers
and chisels to create continuous channels (10 cm wide and 5 cm
deep). Horizontal samples were taken across the centre to base
of the trenches and vertical samples were taken on the wall of
the trenches.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• No drilling was completed.
• A set of standard operating procedures for trenching and
sampling were prepared by the company and Vato Consulting,
who supervised the program, and these were adhered to.
• All trenches are logged quantitatively using industry standard
practice on site in enough detail to allow mineral resource
estimates as required.
• Logging included: primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type
(generally magnetite or hematite), mineralisation style,
mineralisation %, structure, magnetic susceptibility (see below),
notes (longhand).
• All trenches are photographed.
• All trenches are logged using a ZH-SM30 magnetic susceptibility
meter to enable accurate distinction of iron (magnetite) rich units
and to potentially differentiate between magnetite and hematite
rich mineralisation. Readings recorded in 25cm intervals.
• Density measurements are made using the Archimedes method
(mainly fresh competent rock).
• All trenches logged in their entirety.
27
Criteria JORC Code explanation Commentary
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• No drilling was completed.
• A set of standard operating procedures for trenching and
sampling were prepared by the company and Vato Consulting,
who supervised the program, and these are always adhered to.
• Total of the 332 horizontal samples and 33 vertical samples
were prepared at the OMNIS laboratory in Antananarivo and
samples were oven dried, crushed to -2mm, split twice through a
50/50 riffle splitter to obtain a representative sub-sample,
weighing approx. 100g and then pulverized that 85% pass -
75µm.
• 1-2m sampling is deemed to be comprehensive and
representative for the style/type of mineralisation under
investigation.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• Pulp samples were sent to ALS an accredited laboratory, in
Perth, West Australia for determination of total iron and a
standard “iron suite” of elements by XRF analyses using
techniques ME-XRF21u for standard iron-ore XRF analysis and
method ME-GRA05 for LOI analysis.
• QA/QC in-house procedures applied with alternating standards
and blanks inserted every 20 samples, and four duplicates (field
and lab) inserted every 100 samples, in addition to the internal
QAQC from the laboratory.
• OREAS standards OREAS40 / OREAS401 / OREAS404 /
OREAS701 and AMIS blank AMIS855 were used for in-house
QAQC.
• Standards, blanks, field and lab duplicates for trench sample
analyses reported in this announcement have performed
satisfactorily.
Verification
of sampling
and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
• No drilling was completed.
• All trenching work was completed by Vato Consulting personnel,
and all mineralised intervals were checked by Vato Consulting’s
Principal Geologist.
28
Criteria JORC Code explanation Commentary
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• All data was recorded on paper logs and was then captured
using Seequent MXDeposit database software.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• No drilling was completed.
• Final trench locations have been completed using a handheld
GPS (GARMIN).
• The grid system used is UTM, WGS84, Zone 38 Southern
Hemisphere
• An accurate topographic survey was completed in 2021 by
FUTURMAP, a local surveying consultant. The survey was
conducted using PHANTOM 4 Pro type drones, and a pair of
LEICA System 1200 dual frequency GPS. An accuracy of 10mm
horizontal and 20mm vertical is quoted.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Data spacing nominally at 50-60m for the trenches within the
mineralisation zones.
• The data spacing and distribution is considered appropriate to
establish geological and grade continuity for the style of
mineralisation.
• No sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• The ironstone unit has a strong north-south trend with a steep to
shallow westerly dip. The ironstone unit has a conspicuous
regolith zone with completely to highly weathered material up to
27m deep. The regolith hosts iron mineralisation with enrich
Direct Shipping Ore (DSO) parts.
• The trenches test the mineralisation in the regolith (weathered
zone) and enrich DSO parts.
• No sample known bias present.
Sample
security
• The measures taken to ensure sample security. • Chain of Custody procedures are implemented to document the
possession of the samples from collection through to storage,
customs, export, analysis, and reporting of results. Chain of
29
Criteria JORC Code explanation Commentary
custody forms are a permanent record of sample handling and
off-site dispatch.
• The on-site Geologist is responsible for the care and security of
the samples from the sample collection to the export stage.
Samples prepared during the day are stored in the preparation
facility in labelled sealed plastic bags.
• Samples will be delivered to the preparation laboratory and
subsequent analytical laboratory by courier.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • No audit has been conducted.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• The Company completed the acquisition of the minority interest
in Iron Ore Corporation of Madagascar sarl held by Cline Mining
Corporation on 5 August 2020.
• The Company holds through Iron Ore Corporation of
Madagascar sarl, Universal Exploration Madagascar sarl and a
Farm-in Agreement 12 exploration permits in three
geographically distinct areas. All administration fees due and
payable to the Bureau du Cadastre Minier de Madagascar
(BCMM) have been and accordingly, all tenements are in good
standing with the government.
• The tenements are set out in the below
30
Criteria JORC Code explanation Commentary
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other parties. • Exploration has been conducted by UNDP (1976 - 78) and
BRGM (1958 - 62). Final reports on both episodes of work are
available and have been utilised in the recent IGR included in
the Akora prospectus. Airborne magnetics was flown for the
government by Fugro and has since been obtained, modelled
and interpreted by Cline Mining and Akora.
Geology • Deposit type, geological setting and style of mineralisation. • The tenure was acquired by AKO during 2014 and work since
then has consisted of:
o Data compilation and interpretation;
o Confirmatory rock chip sampling (118 samples) and
mapping;
o Re-interpretation of airborne geophysical data;
o Ground magnetic surveying (305 line km’s);
o The 2020 drilling program of 1095.5m diamond core
drilling in 12 drillholes.
o The 2021 drilling program of 5117.02m diamond core
drilling in 52 drillholes.
o The 2022 drilling program of 1166.37m diamond core
drilling in 85 drillholes (BEKD064 to BEKD148).
o The 2023 drilling program of 967.3m diamond core
drilling in 74 drillholes (BEKD149 to BEKD222).
31
Criteria JORC Code explanation Commentary
o The 2024 drilling program of 508.01m diamond core
drilling in 61 drillholes (BEKD0223 to BEKD283).
• The drilling has shown that the surface mineralisation continues
at depth, with at most a 25% increase in grade due to
weathering effects. However, it should be noted that some
downslope creep of scree from these units may exaggerate
apparent width at surface.
• The mineralisation occurs as a series of magnetite bearing
gneisses and calc-silicates that occur as zones between 50m
and 150m combined true width.
• The mineralisation occurs as layers of massive magnetite
(sometimes altered to hematite) between 1m and 7m true width
plus a lower grade zone that consists of lenses, stringers,
boudins and blebs of magnetite aggregates that vary from 1cm
to 10’s of cm wide within a calc-silicate/gneiss unit (informally
termed “coarse disseminated” here). These units sometimes
have an outer halo of finer disseminated magnetite (informally
termed “disseminated” here).
• This wide mineralisation halo provides a large tonnage potential
over the 6-7km strike of mapped mineralisation and associated
magnetic anomaly within the Akora tenement.
• The maiden MRE completed by H&S Consultants in 2022 is
summarised as follows:
• The updated MRE completed by W&A Consultants in 2025 is
summarised as follows:
32
Criteria JORC Code explanation Commentary
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• No further drilling was completed.
• All relevant drillhole information related to the
2020/2021/2022/2023/2024 drilling programs have been
previously reported to the ASX. No material changes have
occurred to this information since it was originally reported.
• A total of 8 trenches (BEKT001 to BEKT008) were completed
and 338.7 metres excavated with the trench collar data as stated
in this announcement.
• Geological maps and trench cross sections are presented in this
announcement.
33
Criteria JORC Code explanation Commentary
Data
aggregation
methods
• In reporting Expl