Satrokala Iron Ore Project First ExploratoryDrilling Revised
Released
Released
Announcement PDF
Iron ore for tomorrow’s
steel making.
15 August 2024
Revision to ASX Announcement “Satrokala Iron Ore Project First Exploratory Drilling
Update” released on 8 August 2024
It has come to our attention that the abovementioned ASX Announcement did not comply with
ASX Listing Rules.
It omitted a Cautionary Note regarding reporting of visual estimates and Appendix 1 – JORC
Table and Appendix 2 – Drill Core Logging Table.
We resubmit the Announcement in compliance with ASX Listing Rules.
Yours faithfully,
Shane Turner
Company Secretary
AKORA Resources Limited | ACN 139 847 555 |
12 Anderson Street West, Ballarat Victoria 3350
PO Box 28 Ballarat Victoria 3353
Email info@akoravy.com
ASX: AKO
www.akoravy.com
Akora Resources Limited
PO Box 28
Ballarat Victoria 3350
Australia
info@akoravy.com
ACN 139 847 555
ASX: AKO
akoravy.com
15 August 2024
ASX RELEASE
Satrokala Iron Ore Project First Exploratory Drilling Update.
Highlights
•
First five drill holes at the Satrokala Project now completed.
•
Mineralisation contained within intercepted magnetic anomaly sections being
prepared for assays.
AKORA Resources (ASX: AKO) (“AKORA” or “Company”) has completed a maiden drilling
program with five sighter exploratory holes drilled at its Satrokala Project, Madagascar. This
initial program was designed to test several of the magnetic anomalies running north to south
along the 10km of strike length.
All five drill holes completed in this first stage appear to have intercepted potential
mineralisation, which are being prepared for assaying. While no mineralogy has been
completed at this early stage the drill core looks similar to the nearby Bekisopa ‘green steel’
fresh rock. However, the magnetic susceptibility readings are comparably lower than
Bekisopa.
Drilling of the remaining five planned drill holes 500m to the south is planned to resume once
the geology, grade and mineralogy of the drill core is better understood.
Drilling at Satrokala follows positive results returned from a surface rock sampling program in
20221, and a subsequent follow-up ground magnetic survey in 20232.
AKORA Managing Director, Paul Bibby said “I’ve just returned from Madagascar where I
observed the first drilling campaign at our Satrokala Iron Ore Project and participated in
several community activities. The drill core looks to contain both fine and coarse
disseminated mineralisation in intercepted sections and to depths to 100m. We will now
obtain assays and carry out further field work in order to gain a greater understanding of the
geology, prior to future drilling.”
Satrokala initial exploratory drilling locations and field observations.
The Satrokala exploration plan consists of 10 x 100m deep holes (refer Figure 1). The first
five holes (SATD01 to SATD05) were completed and a total of 501.7m drilled.
1 Refer ASX Announcement 8 June 2022
2 Refer ASX Announcement 20 March 2024
Figure 1. Satrokala drill plan and the associated ground magnetic survey results.
Four holes (SATD01, SATD02, SATD03 and SATD05) were oriented at a dip of 50 degrees,
either to the east or west, to drill into the magnetic anomaly, locations in Table 1. One hole
(SATD04) was drilled vertically at 90 degrees into a wider and steeper dipping anomaly to
test the depth and continuity of the potential mineralisation, location in Table 1. Drill hole
orientation and positioning to the magnetic anomalies are shown in Figure 2.
Figure 2. Ground magnetic survey results cross section showing drill holes SATD03 to SATD05.
2
Drillhole_ID
UTM_x
UTM_y
Inclination
Azimuth
Length
SATD01
571,197
7,571,043
-50
66
100.3
SATD02
571,198
7,571,485
-50
246
100.3
SATD03
569,357
7,569,277
-50
76
100.3
SATD04
568,960
7,569,194
-90
0
100.5
SATD05
569,691
7,569,361
-50
76
100.3
Table 1. Drill hole locations, inclinations and depths .
Drilling locations SATD01 to SATD04 were in country rock that has a brown to grey-coloured
soil with minimal iron mineralisation / scree on surface, as observed at drill location SATD03,
Figure 3. The last drill hole completed, hole SATD05, was in the more typical red ferruginous
soils like that observed in the weathered zone at the company’s nearby and more advanced
Bekisopa Iron Ore Project. The first few metres of drill core of hole SATD05 look to contain
some typical weathered iron mineralisation. Figure 4 shows images of drill hole SATD05’s
location and the weathered magnetic minerals on the surface.
Figure 3 - Drilling at SATD03 and looking to the east showing the location of drill pad SATD05 on the
nearby ridge.
3
Figure 4. Satrokala drill hole SATD05 showing weathered red ferruginous soil and nearby magnetic
mineralisation.
Each drill hole showed a minimal weathered zone as expected from the ground magnetic
intensity readings and then wide intercepts of reasonably continuous possible disseminated
mineralisation. Figure 5 shows the drill core sections from drill hole SATD03, from 71 to 86
metres downhole.
Figure 5. Drill core from drill hole SATD03 showing possible fine disseminated mineralisation
at depth.
The field portable magnetic susceptibility measurements were lower than expected for the
degree of apparent mineralisation, compared to similar Bekisopa core sections, which could
imply that minerals other than highly magnetic magnetite may be present. There was also
some sulphides noted, like pyrite and pyrrhotite (being a less magnetic iron sulphide), and
observed in some drill core sections. The visual estimations of potential mineralisation for
drill holes SATD01 to SATD05 are summarised in Appendix 2.
4
Figure 6 shows the early geological interpretation from drill holes SATD01 and SATD02 on
the eastern side of the project, with each drill hole intercepting potential mineralisation down
hole to 100 metres.
Figure 6. Geological interpretation from drill holes SATD01 and SATD02, looking from the
east.
Cautionary Note
A cautionary note is mandated by the ASX and of good practice given the Company wishes
to advise shareholders of the preliminary findings of the drilling program but recognises that
assay and mineral analysis has not yet occurred. The potential mineralisation, as evident
visually from the fresh drill core, depicts that of iron mineralisation as further supported by the
underlying ground magnetic survey results previously reported. The type of mineralisation,
its nature and any comment on abundance is not being speculated at this early stage.
“Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.”
The Company will update the market when laboratory analytical results become available for
these samples, which is expected to be October 2024.
5
Next Steps
•
Complete field geological evaluation from this first stage of drilling.
•
Obtain full assay analysis, mineralogy and Davis Tube Tests to test for iron
upgradability.
•
Plan further geological field work, including trenching and pits in selected locations to
better understand the observed mineralisation type and extent.
•
Undertake further drilling of the magnetic anomalies to build up an understanding of the
geology.
This announcement has been authorised by AKORA Resources Limited’s Board of
Directors.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Gareth Quinn
Investor Relations
Phone +61(0) 417 711 108
gareth@republicpr.com.au
Competent Persons Statements
The information in this statement that relates to Exploration Targets and Exploration Results is based
on information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist
(Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific Professions
(SACNASP). Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation
and type of deposits under consideration and the activity being undertaken to qualify as a Competent
Person as defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock
Exchange and the 2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the
information in this release in the form and context in which it appears.
6
Iron ore for tomorrow’s steel making
AKORA Resources (ASX: AKO) is an Australian resources company focused on the
development of four high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (mt) Inferred
JORC Resource (ASX Announcement 11 April 2022) with very low impurities able to produce
a premium-priced +68% Fe concentrate. Direct Reduced Iron-Electric Arc Furnace (DRIEAF) technology which is used to make greener steel without coal and considerably less
carbon emissions requires iron ore grades of at least 67%.
To generate cash in the near-term, AKORA is advancing plans at Bekisopa to produce up to
2Mt per annum over the first five years of a 60% Fe average grade direct shipping ore (DSO)
(ASX Announcement 14 November 2023) for shipping to Blast Furnace-Basic Oxygen
Furnace (BF-BOF) steelmakers.
The Company confirms that it is not aware of any new information or data that materially affects the above and
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
7
Appendix 1
JORC Code, 2012 Edition - Table 1 - Satrokala Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
•
•
Conventional wireline diamond drilling is used to obtain all
drillcore and drilling is undertaken with a EP200 man portable
drilling rig. Nominal core diameter is 56.1mm (NTW) in 0.5-1.5m
runs. Drill holes SATD01, SATD02, SATD03 and SATD05 are
inclined at -50° and SATD04 -90° (vertical) and core is not
orientated. A total of 5 diamond holes (SATD01 to SATD05) and
501.68m drilled.
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
•
•
Core recovery is measured every run by geologists.
Core recoveries of 98% on average were achieved for sampled
core.
NA
Drilling
techniques
Drill sample
recovery
Commentary
•
•
•
•
Diamond drilling was used to obtain NTW size core, with the
weathered (friable) core split using a chisel/hammer and fresh
(competent) core cut using a diamond blade core saw.
Samples were taken along the depth intervals and lithological
sub-division mark-ups to gather representative samples.
Sampling consists of approx. 1m samples of ½ core with breaks
at lithological discontinuities - typical 1-5kg.
Sample preparation and analysis are pending.
Criteria
Logging
JORC Code explanation
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Commentary
•
•
•
•
•
•
•
•
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
•
•
A set of standard operating procedures for drilling and sampling
were prepared by the company and Vato Consulting, who is
supervising the program, and these are always adhered to.
All drill core is logged qualitatively using standard operating
practices and codes.
Logging included: core recovery %, primary lithology, secondary
lithology, weathering, colour, grain size, texture, mineralisation
type (generally magnetite or hematite), mineralisation style,
estimated mineralisation %, structure, magnetic susceptibility
(see below), notes (longhand).
All core is photographed both wet and dry and as both whole and
half core.
All core is geotechnically logged and RQD’s calculated for every
core run.
All drill-holes are logged using a ZH-SM30 magnetic
susceptibility meter to enable accurate distinction of iron
(magnetite) rich units and to potentially differentiate between
magnetite and hematite rich mineralisation. Readings recorded in
25cm intervals.
Density measurements are made using both the Archimedes
method (mainly fresh competent rock) and the Caliper Vernier
(mainly weathered friable rock) methods.
All diamond core holes logged in their entirety.
A set of standard operating procedures for drilling and sampling
were prepared by the company and Vato Consulting, who is
supervising the program, and these are always adhered to.
All core is fitted together so that a consistent half core could be
collected, marked up with a “top” line (line perpendicular to dip
and strike, or main foliation), sample intervals decided and
9
Criteria
JORC Code explanation
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
Commentary
•
•
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and assaying
Location of
data points
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
marked up and the core subsequently cut in half using a core
saw, separating samples into the marked-up intervals. If the core
is weathered (friable), it is split in half using a hammer and chisel.
The intervals are nominally 1m, but smaller intervals are marked
if a change in geology occurred within the 1m interval.
The half core sample intervals are placed into polythene bags
along with a paper sample tag. This is then sealed using a cable
tie and placed into a second polythene bag with a second paper
tag and this is sealed using a cable tie.
Sample batch transport to and subsequent preparation at the
preparation laboratory facility in Antananarivo (OMNIS) are
pending.
•
No assaying has been undertaken as yet on the drillholes being
reported.
•
As assaying has not yet been undertaken, only qualitative
descriptions are reported, and magnetic susceptibility readings
are recorded.
•
Drillhole collars have been provisionally located using a handheld GPS (+/-2-3m accuracy). Final collar locations will be
completed at the end of the drilling program by using differential
GPS (dGPS) (with an accuracy to cm).
The grid system used is UTM, WGS84, Zone 38 Southern
•
10
Criteria
JORC Code explanation
Commentary
•
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
•
•
•
The drilling lines are broadly perpendicular or slightly oblique to
local geological trends and magnetic units (anomalies).
NA
NA
•
•
NA
NA
•
Chain of Custody procedures are implemented to document the
possession of the samples from collection through to storage,
customs, export, analysis, and reporting of results. Chain of
custody forms are a permanent records of sample handling and
off-site dispatch.
The on-site Geologist is responsible for the care and security of
the samples from the sample collection to the export stage.
Samples prepared during the day are stored in the preparation
facility in labelled sealed plastic bags.
Samples will be delivered to the preparation laboratory and
subsequent analytical laboratory by courier.
•
•
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
Hemisphere
No topographical survey has yet been completed.
•
No audit has been conducted.
11
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
• Type, reference name/number, location and ownership including
tenement and
agreements or material issues with third parties such as joint ventures,
land tenure
partnerships, overriding royalties, native title interests, historical sites,
status
wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Commentary
•
•
•
The Company completed the acquisition of the minority interest
in Iron Ore Corporation of Madagascar sarl held by Cline Mining
Corporation on 5 August 2020.
The Company holds through Iron Ore Corporation of Madagascar
sarl, 5 exploration permits in two geographically distinct areas.
All administration fees due and payable to the Bureau du
Cadastre Minier de Madagascar (BCMM) have been and
accordingly, all tenements are in good standing with the
government.
The tenements are set out in the below
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other parties.
•
In 2007 Spector for Cline Mining Corporation completed ground
geophysical investigations of FUGRO airborne magnetic and
radiometric anomalies. For anomaly Zone F (covering tenements
27211 and 35827) it was concluded to be a very prospective iron
prospect as indicated by a 3 mgal gravity anomaly associated
with a 4500 nT magnetic anomaly. The geophysical features are
quite similar to that observed over Bekisopa and a synformal
structure is interpreted. An east-west geological traverse of
2.0km showed generally flat ground with little outcrop but float
boulders of massive magnetite.
Geology
• Deposit type, geological setting and style of mineralisation.
•
The main lithologies are paragneisses, calc-silicates,
amphibolites/pyroxinites and marbles of Palaeoproterozoic age.
A magnetite-bearing gneiss rock is apparent and this appears to
grade into massive magnetite-hematite layers and lenses. The
mineralisation appears to be a metasomatic alteration product
12
Criteria
JORC Code explanation
Commentary
and has some similarities to skarn style iron mineralisation and/or
magmatic associated IOCG/Kiruna style mineralisation.
Drill hole
Information
Data
aggregation
methods
Relationship
between
mineralisatio
n widths and
intercept
lengths
Diagrams
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole angle
is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional views.
•
All relevant drillhole information related to the 2024 drilling
program completed to date (SATD01 to SATD05) is included in
this press release and tables.
•
NA, sample preparation and analysis are pending.
•
NA, sample preparation and analysis are pending.
•
All relevant maps and tabulations of drill hole collars provided in
this release.
13
Criteria
JORC Code explanation
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Other
substantive
exploration
data
Further work
Commentary
•
NA, sample preparation and analysis are pending.
•
See results from a surface rock sampling program in 2022 (ASX
Announcement 8 June 2022), and a subsequent follow-up
ground magnetic survey in 2023 (ASX Announcement 20 March
2024).
•
Initial 5 drillholes were completed, sample preparation and
analysis to follow. Further mineralogy test work to be completed.
14
Appendix 2 – Drill Core Logging Tables
Drillhole_ID
SATD01
SATD02
SATD03
SATD04
SATD05
From_m
To_m
Interval_m
Lithology
0.00
1.13
13.27
29.24
30.27
30.70
31.31
44.00
47.17
51.00
53.40
57.15
58.80
61.40
71.72
0.00
7.42
14.10
15.24
17.05
20.95
45.26
48.95
0.00
2.21
11.68
14.70
27.95
28.66
30.66
33.21
36.57
38.80
56.47
57.31
71.35
75.26
85.65
87.10
94.87
95.68
98.56
0.00
11.56
22.18
25.33
49.50
50.42
53.02
53.50
72.38
73.18
83.50
86.90
91.36
93.64
0.00
1.64
2.31
4.86
5.95
8.56
54.38
55.38
62.29
62.76
74.00
76.47
95.08
96.60
1.13
13.27
29.24
30.27
30.70
31.31
44.00
47.17
51.00
53.40
57.15
58.80
61.40
71.72
100.27
7.42
14.10
15.24
17.05
20.95
45.26
48.95
100.31
2.21
11.68
14.70
27.95
28.66
30.66
33.21
36.57
38.80
56.47
57.31
71.35
75.26
85.65
87.10
94.87
95.68
98.56
100.31
11.56
22.18
25.33
49.50
50.42
53.02
53.50
72.38
73.18
83.50
86.90
91.36
93.64
100.50
1.64
2.31
4.86
5.95
8.56
54.38
55.38
62.29
62.76
74.00
76.47
95.08
96.60
100.29
1.13
12.14
15.97
1.03
0.43
0.61
12.69
3.17
3.83
2.40
3.75
1.65
2.60
10.32
28.55
7.42
6.68
1.14
1.81
3.90
24.31
3.69
51.36
2.21
9.47
3.02
13.25
0.71
2.00
2.55
3.36
2.23
17.67
0.84
14.04
3.91
10.39
1.45
7.77
0.81
2.88
1.75
11.56
10.62
3.15
24.17
0.92
2.60
0.48
18.88
0.80
10.32
3.40
4.46
2.28
6.86
1.64
0.67
2.55
1.09
2.61
45.82
1.00
6.91
0.47
11.24
2.47
18.61
1.52
3.69
Soil
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Dolerite/Diabase
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Ferruginous soil
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Gneiss
Magnetite-bearing gneiss
Minerals Observed
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 20-30% disseminated, banded)
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 30-40% disseminated, banded)
Magnetite, dark mafic minerals, biotite(est 10.-20% disseminated)
Magnetite, dark mafic minerals, biotite(est 10.-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 30-40% disseminated, banded)
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 30-40% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 5-10% disseminated, banded)
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite, pyrite, pyrrhotite (est 30-40% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 10-20% disseminated, banded)
Magnetite, dark mafic minerals, biotite (est 20-30% disseminated, banded)
Magnetite, dark mafic m
Share your feedback