Phase I-Bekisopa Drilling Programme
Released
Released
Announcement PDF
17 December 2020
The Manager
Company Announcements Office
ASX Limited
Level 4
Exchange Centre
20 Bridges Street
Sydney NSW 2000
Dear Sir
EXPLORATION ANNOUNCEMENT
Pursuant to the requirements of Listing Rules, please find attach an announcement
authorised by the AKORA board of directors.
Yours faithfully
JM Madden
Company Secretary
For further information please contact:
Paul G Bibby
Managing Director
Phone 61(0) 419 449 833
www.akoravy.com
SHAREHOLDER ANNOUNCEMENT
17 December 2020
Completion of Phase I Drilling Campaign
Bekisopa Project, Madagascar
Highlights
•
A total of 1,095.5m was completed across 12 diamond drill-holes
•
Sample preparation is expected to complete in late January with assay
results anticipated [6] weeks thereafter
•
The initial drilling program has largely confirmed the pre-drilling
interpretation of layers of massive iron mineralisation extending at depth
•
It appears that magnetite aggregates present in the halo of country rock
are courser than expected
Introduction
Akora Resources Ltd (AKO) is pleased to announce the completion of its first drilling program at
the Bekisopa Project in south central Madagascar (Figure 1). Bekisopa is 100% owned by AKO
and the focus of its exploration activity is to confirm the extent of high-grade iron mineralisation.
No safety, social or environmental incidents or concerns were encountered during the entirety of
the program.
Figure 1:
Akora Project Locations, Madagascar
Exploration Programme
A total of 1,095.5m was completed across 12 diamond drill-holes (DDHs, Table 1 and Figure 2)
compared to the initial plan for 7 drill holes for 700 metres. Drilling is now complete and currently
all drill core is being transported to the capital city, Antananarivo, where it will be cut, sampled
and prepared for assaying. On completion of sample preparation in late January the sample will
be sent to an overseas accredited laboratory for chemical analysis and Davis Tube evaluations.
Logging, marking up and photographing of core was completed in the field and an initial
geological interpretation has been developed based on the preliminary field logging. It should be
noted that detailed logs are still being compiled and the current interpretation may change
somewhat when that work has been completed and correlated to the analytical results.
The drilling program has been successful in confirming that massive magnetite iron
mineralisation continues at depth beneath the outcropping high-grade iron mineralisation, as
previously interpreted from the October 2019 geological and magnetic survey work. This is
clearly shown on the selected interpreted drill sections (Figures 3 to 6) and drill core photos
(Figures 7 to 13).
The drilling program comprised one vertical drillhole and eleven angled drillholes, Table 1. All
except one intersected iron mineralisation. The last angled drillhole, BEKD12, was added to
confirm the geological interpretation of a syncline (a folded mineralised band that is closed off at
the bottom) which, after the core logging showed no iron mineralisation, is now interpreted to be
closed off shallower than previously expected.
Drillhole
ID
Easting
(WGS84
Z38S)
Northing
(WGS84
Z38S
Azimuth
(Degrees)
Declination
(Degrees)
Total
Depth (m)
Core
Recovery
(%)
BEKD01
586,080
7,612,149
000
-90
80.54
93
BEKD02
586,161
7,611,699
090
-60
80.48
98
BEKD03
586,349
7,611,000
090
-60
100.47
99
BEKD04
586,449
7,610,801
090
-60
100.49
98
BEKD05
586,369
7,610,800
090
-60
100.45
98
BEKD06
586,552
7,610,803
090
-60
60.40
97
BEKD07
586,725
7,609,301
090
-60
70.50
97
BEKD08
586,825
7,609,300
090
-60
100.44
98
BEKD09
586,752
7,608,149
090
-60
100.46
99
BEKD10
586,798
7,608,150
090
-60
100.43
97
BEKD11
586,849
7,608,149
090
-60
100.44
98
BEKD12
586,900
7,607,599
090
-60
100.42
97
1095.52
97
Total
Table 1
Drill Hole Summary Table (note co-ordinates are from hand-held GPS
and accurate co-ordinates and elevations currently being surveyed in)
Figure 2
Drillhole Locations on AKORA’s geology and historical activity plan.
Figure 3
Interpreted Cross-Section Through BEKD01; 7,612,150N
(historical BRGM channel sample assays from trenching shown in red)
Figure 4
Interpreted Cross-Section Through BEKD03; 7,611,000N (historical BRGM channel sample assays
from trenching shown in red and green)
Figure 5
Interpreted Cross-Section Through BEKD04 to BEKD06; 7,610,800N
(historical BRGM channel sample assays from trenching shown in red and green)
Figure 6
Interpreted Cross-Section Through BEKD09 to BEKD11; 7,608,150N
(historical BRGM vertical channel sample assays from pitting shown in red)
The drilling has confirmed that mineralisation consists of layers, lenses, and pods (semi-spherical
aggregates) of massive magnetite and hematite aggregates within the host rock of gneiss and
calc-silicate. This is illustrated by the following drill core photos. The core from drillhole
BEKD01 (Figures 7 to 9) shows magnetite pods and lenses between 2mm and 50mm across.
The total combined width of the mineralised system in this drillhole is around 50m in two
separate bands as shown in Figure 3 above.
The core photos from drillhole BEKD03 (Figure 10) show the typical distribution of mineralisation
within the overall mineralisation package. The magnetite layers vary from a few millimetres to
over 10cm is thickness, unlike the typical finely banded layers found in more typical magnetite
banded iron formations. The mineralisation package in this drillhole can be interpreted to be over
50m true thickness in two main zones (Figure 4).
Sometimes the bands of massive magnetite are quite thick (up to 10m true thickness) as
illustrated by the core photos from drillhole BEKD08 (Figure 11), which shows a 5m wide band of
massive magnetite with some hematite and goethite (yellowy coloured weathering product of
magnetite-hematite). Figure 12 shows a similar massive magnetite layer deeper in the same
drillhole, below the oxidation profile.
The core from BEKD09 is shown on Figure 13 to illustrate a layer of massive magnetite
mineralisation (from about 42.8m to 48.0m) within a zone of more lenticular and banded
magnetite mineralisation. This is from the southern part of the tenement within a zone of
mineralisation that is over 50m true width and dips shallowly to the west (Figure 6).
These drill results and interpretations confirm that the pre-drilling understanding of massive
bands of magnetite and hematite within a broader zone of “disseminated” lenticular and poddy
magnetite mineralisation is correct along the plus 5-kilometre strike length. Interestingly, it
appears that the “disseminated” iron mineralisation halo contains much coarser magnetite
aggregates (lenses, pods and layers) and mineralisation in the country rock than previously
thought.
Figure 7
BEKD01 49.5m – Close-up of Pods of Massive Magnetite
(black mineral, examples shown with yellow arrows) in Calc-Silicate Host Rock (white and green
minerals)
Figure 8
BEKD01 52.5m –Massive Magnetite (black)
with narrow layers of Calc-Silicate host rock (white and green)
Figure 9
BEKD01 51m – Coarse Magnetite
(black, selected examples by yellow arrows) within Calc-Silicate host rock (white and green)
note coarse size of magnetite aggregates (mm to >cm size)
Figure 10
BEKD3 34-42m; Massive Magnetite layers
(black, several highlighted by yellow arrows) within Calc-Silicate and Gneiss (white)
Figure 11
Massive Magnetite with some Hematite/Goethite due to weathering (BEKD08 29-34m)
note that the yellow arrows mark the start and finish of the massive magnetite-hematite-goethite
Figure 12
BEKD08 70.4-72.2m; Massive Magnetite (black)
with streaks of Gneiss and Calc-Silicate (white)
Figure 13
BEKD09; Massive Magnetite mineralisation from 42.8m to 48.0m
(yellow arrows mark start and finish) within a zone of more lenticular Magnetite mineralisation
Conclusion
This first limited drilling program has further developed the geological model for the project,
with the preliminary logging and interpretation showing one or more wide bands of iron
mineralisation in all areas drilled except the southernmost hole. Thickness of these bands
appears to vary between 50m and 100m for the combined mineralisation zone. These
bands consist of layers of massive magnetite of 5m to 10m true thickness within a
broader zone of “disseminated” coarse magnetite aggregates in the form of lenses,
layers and pods (generally in the centimetre rather than millimetre size range) within calcsilicate and gneiss country rock.
It is unusual to see coarse magnetite aggregates in this form and it is possible that
these may separate at a relatively coarse grind, several millimetres to over one
centimetre, and that lump size fractions may be able to be produced prior to this finer crush
to separate the remaining magnetite. This remains to be proven and a coarse product will
be collected during laboratory sampling for Davis Tube test work to test this concept, along
with a normal fine fraction for standard XRF analysis. These laboratory results are expected
in late February 2021.
In summary, this initial drilling program has largely confirmed the pre-drilling
interpretation of layers of massive iron mineralisation extending at depth and
encouragingly, it appears that coarser magnetite aggregates than previously expected
are present in the halo of country rock.
For further information contact:
PG Bibby
Managing Director
61-(0) 419 449 883
or visit www.akoravy.com
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related
scientific and technical information, is based on and fairly represents information compiled by Mr
Antony Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He is a
shareholder in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years
prior to being engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of
Mining and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG).
Mr Truelove has sufficient experience which is relevant to the styles of mineralisation and types of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the
matters based on his information in the form and context in which it appears including sampling,
analytical and test data underlying the results.
Table 1 Bekisopa Project
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed
information.
Commentary
Historical:
• All trenches and pits were located by GPS but are historic in nature (work undertaken by
BRGM between 1958 and 1962 and by UNDP between 1976 and 1978). Most of these
trenches and pits are still open although partially in-filled with scree and vegetation. In
total, BRGM completed 564 pits for 1,862 linear metres excavated, 3,017m3 of trenching
and 572m diamond drilling in 22 holes. UNDP completed an additional 238 pits for 897
linear metres and 101m diamond drilling in 2 holes. They collected a total of 854 samples,
710 from pits and 144 from drill-holes.
• In the BRGM work, trench samples were collected as 1m horizontal channels from as close
to the base of the channel as possible. If lithology changed within the 1m sample, two or
more samples were collected based on each lithology encountered. Pit samples were
collected as 1m vertical channels. Each channel was 20cm wide by 10cm deep.
• Samples collected by BRGM were crushed and ground to minus 0.15mm in country and
then a 200g split was sent to either BRGM in Paris or Dakar or to Department of Mines for
Madagascar in Antananarivo for analyses for Fe, SiO2, Al2O3 and P. Detailed of assay
techniques are not available but Assay work by BRGM is generally to a high standard. The
analyses for P were considered to be suspect as the levels detected by BRGM in both
Paris and Dakar averaged about 0.05% but the levels detected by the Department of Mines
in Madagascar averaged about 0.19%. Recent work has confirmed P is low for high grade
iron mineralisation and the BRGM results are now considered to be more accurate than the
Departmental work.
• Samples collected by UNDP were obtained and prepared in a similar manner except
channels were 10cm wide and 10cm deep. The samples were crushed to minus 1mm in
the field and then a 200g split (riffle split) was sent to the laboratory Denver du Service
Géologique in Antananarivo. A 50 - 70g split was subsequently assayed at the same
laboratory. They were assayed for Fe by boiling the pulp for 5 hours in a hydrochloric acid
concentrate followed by calcining at 1,000˚C and dissolution in a 480 nano-molar
orthophenanthroline solution and analysis for iron using a Technicon auto-analyser. It is
noted that this method can slightly under-estimate iron content but that standards were
generally within 1% Fe of expected values. Iron, aluminium and titanium were analysed by
a double attack using the three-acid reagent (nitric, hydrochloric and sulphuric) followed by
calcination at 1,000°C and determination of iron, aluminium and titanium in a solution of
480 nano-molar orthophenanthroline, 540nM eriochrome cyanine and 540nM hydrogen
peroxide respectively followed by analysis using the Technicon auto-analyser.
Criteria
JORC Code explanation
Commentary
Phosphorous was analysed by boiling the pulp in nitric acid for 5 hours followed by cleaning
using sulphuric acid prior to dissolution in 660nM sulphomolybdic acid and analysis using
the Technicon auto-analyser.
• Drilling was conducted in the same two campaigns and sampled were collected and
analysed as for the channel and samples.
Akora:
• No new surface sampling has been undertaken.
Drilling
techniques
•
Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
Historical:
• Drill holes are historical in nature but are known to be core holes. The BRGM drilling was
undertaken using a Joy 7 drilling rig but core diameter is not known. Recovery was
generally low in the surficial material (often less than 50%), and samples were collected
both from the core and the cuttings. These generally confirm each other where both are
available but significant losses of material may be encountered as the drilling was not triple
tube and hence results should be used with caution. Below the surficial zone (variable from
10m to 30m in depth) recovery is much better (50 - 100%) and results are considered to be
more reliable. Cuttings are generally not sampled below 10 - 20m depth.
• The sample results from the trenching and pitting are considered much more reliable and
these do confirm the drill results where overlap occurs.
Akora:
• All drilling is diamond core drilling using either NTW (64.2mm inner diameter) or HQ
(77.8mm inner diameter) coring equipment. BEKD01 was drilled 100% NTW, the
remainder of the holes were collared using HQ and changed to NTW between 10m and
27m downhole. Core is not orientated. The first three drillholes (BEKD01-03) were not
surveyed but the remainder were surveyed every 10m using a Reflex EZ-Gyro gyroscopic
multishot camera. No surveys varied more than 5° from the collar survey in either azimuth
or declination.
Drill sample
recovery
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Historical
• At Bekisopa, Drill recovery is poor above 10 - 20m as noted above due to the
unconsolidated nature of the material at shallow depths. However, cuttings are also
collected in areas of poor recovery and these confirm core results where overlap occurs as
noted above.
Akora
• Average core recovery was 97%. The first 8.5m of BEKD01 (vertical) only returned 52%
•
•
Criteria
JORC Code explanation
Logging
•
•
•
Sub-sampling
techniques
and sample
preparation
•
•
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
Commentary
recovery and between21.4m and 25.4m in BEKD12 returned zero percent recovery (not in
iron formation). All other intervals gave good recovery, with close to 100% in fresh rock.
Historical
• Logging at Bekisopa is historical in nature, however work was conducted by the BGRM and
UNDP and drill logs are available and appear to be of high quality.
• Logging and assaying confirm each other as expected for the very visually distinct iron
mineralisation.
Akora
• A set of standard operating procedures for drilling an sampling were prepared by the
company and Vato Consulting, who supervised the programme, and these were adhered to
at all times.
• During drilling, checks and verifications of the accurate measurement of penetration depth
of drill hole cores were made and observations and recording of the colour of the water /
mud rising from the drill hole were made.
• All drill core was logged quantitatively using industry standard practice on site in enough
detail to allow mineral resource estimates as required.
• Logging included: core recovery %, primary lithology, secondary lithology, weathering,
colour, grain size, texture, mineralisation type (generally magnetite or hematite),
mineralisation style, mineralisation %, structure, magnetic susceptibility (see below), pXRF
readings (see below), notes (longhand).
• All core was photographed both wet and dry and as both whole and half core.
• All core was geotechnically logged and RQD’s calculated for every sample interval.
• Drill-holes BEKD05 to BEKD12 were logged using a magnetic susceptibility meter to enable
accurate distinction of iron (magnetite) rich units and to potentially differentiate between
magnetite and hematite rich mineralisation. The remaining drillholes will be logged using
the susceptibility metre as time permits on the remaining half core.
• In drill-holes BEKD01 to BEKD08 (53.25m), pXRF readings were collected at 25cm
intervals to obtain a preliminary estimation of total Fe content. The pXRF machine became
inoperable after that.
• Density measurements were made using both the Archimedes method (mainly fresh rock)
and the Caliper Vernier (mainly regolith) methods.
Historical
• At Bekisopa samples were collected as noted under Sampling Techniques above.
Samples were crushed on site to nominal 1mm and the split with riffle splitter to 200g which
was then pulverised in the laboratory to minus 150 mesh or about 50 micrometres.
Criteria
JORC Code explanation
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to the grain size of
the material being sampled.
Quality of
assay data
and laboratory
tests
•
•
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
Commentary
Akora
• A set of standard operating procedures for drilling and sampling were prepared by the
company and Vato Consulting, who supervised the programme, and these were adhered to
at all times.
• All core was fitted together so that a consistent half core could be collected, marked up with
a “top” line (line perpendicular to dip and strike, or main foliation), sample intervals decided
and marked up and the core subsequently split in half using a core saw, separating
samples into the marked-up intervals. If the core was clayey, it was split in half using a
hammer and chisel. The intervals were nominally 1m but smaller intervals were marked if a
change in geology occurred within the 1m interval.
• The half core sample intervals were put into polythene bags along with a paper sample tag.
This was then sealed using a cable tie and placed into a second polythene bag with a
second paper tag and this was sealed using staples.
• The samples were subsequently transferred to the sample preparation facility in
Antananarivo (OMNIS) where they underwent the following preparation:
o Sorting and weighing of samples
o Drying at 110-120°C until totally dry
o Weighing after drying
o Jaw crushing to 1cm
o Collect a 100g sub-sample of 80% passing 1cm material and store this
o Jaw crushing to 2mm
o Riffle split and keep half as a reference sample
o Collect a 100g sub-sample of 80% passing 2mm material and store this
o Pulverise to minus 75 micrometres
o Clean ring mill using air and silica chips
o Riffle split and sub-sample 2 sets of 100g pulps
o Store reject pulp
o Conduct a pXRF reading on the minus 75 micrometre pulp
o Weigh each of the sub-samples (minus 1cm, minus 2mm, 2 x minus 75
micrometres and store in separate boxes for ready recovery as needed
Historical
• At Bekisopa, the QA/QC is historic in nature, therefore the nature of QA/QC is unknown.
Some standards were used and were within tolerance (1% Fe) but details are not known.
Akora (proposal only at this stage as no assays received to date)
• It is proposed to send one of the 100g minus 75 micrometre samples to an accredited
laboratory in South Africa (SGS Randfontein) for determination of total iron and a standard
Criteria
JORC Code explanation
times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
Verification of
sampling and
assaying
•
Location of
data points
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Commentary
“iron suite” of elements by XRF analyses (not undertaken as yet).
• OREAS standards OREAS40 / OREAS401 / OREAS406 will be included at a density of
one in 40 samples.
• Blanks will be included at a density of one in 40 samples.
• Duplicates will be collected from the preparation facility at a rate of 2-4 duplicates per 100
samples.
Historical
• QA/QC is historic in nature, therefore the nature of QA/QC is not known with certainty. No
twin drilling was undertaken but some duplicates and standards were used. BRGM and
UNDP are high quality explorers with a good reputation.
Akora
• Not applicable at this stage as no assay data received.
Historical
• Drill-hole collars, trenches and pits have been field located by GPS (+/- 5m accuracy).
Original locations appear to be very good.
• All information is currently digitised using UTM (WGS84) Zone 38 Southern Hemisphere
co-ordinates.
•
Topographic control is based on contour maps from the BRGM/UNDP work and by Google
Earth topography outside areas previously surveyed.
Akora
•
All drill hole collars have been accurately picked up post drilling using a DGPS.
•
The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
•
Topographic control is country wide data only. An accurate topographic survey will be
undertaken prior to any resource estimation.
Historical
• Drill-hole collars and trench/it locations are based on BRGM/UNDP maps and many have
been confirmed by GPS (+/- 5m accuracy).
• Trench and pit spacing is systematic and averages about 50m line spacing and 20 - 40m
along line spacing. Sampling within pits and trenches is generally at 1m intervals modified
by lithology. These are close enough to show good continuity at/near surface.
• Drill-hole spacing is erratic and generally very shallow (<20m) apart from a few holes.
These are not enough to establish any significant depth continuity below 20m.
Akora
• Data spacing is not systematic at this stage as this is the first drill campaign and is
Criteria
JORC Code explanation
Orientation of
data in
relation to
geological
structure
•
•
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
Sample
security
•
The measures taken to ensure sample security.
Commentary
considered to be “proof of concept” drilling and is testing specific geological targets.
• All samples will be assayed and then selected intervals sent for Davis Tube testwork by
combining the coarser splits of those intervals. Similarly some composite intervals will be
analysed for multi-elements.
Historical
• The geological orientation has been checked in the field and pits/trenches are generally
perpendicular to the strike of the iron mineralisation.
• No sample bias due to sampling is evident.
Akora
• The ironstone unit has a strong north-south trend and drilling is oriented to the east. The
outcrops, trenches and magnetics all show a steep to shallow westerly dip and hence the
drill direction is considered to be optimal.
• No sample bias is evident.
Historical
• Sampling is historic in nature, therefore the nature of sampling is unknown, however the
professionalism of BRGM and UNDP means that any tampering is extremely unlikely.
Akora
• Chain of Custody procedures were implemented to document the possession of the
samples from collection through to storage, customs, export, analysis and reporting of
results. Chain of custody forms are a permanent records of sample handling and off-site
dispatch.
• The on-site Geologist is responsible for the care and security of the samples from the
sample collection to the export stage. Samples prepared during the day are stored in the
preparation facility in labelled sealed plastic bags.
• The Chain of Custody form contains the following information:
•
Sample identification numbers;
•
Type of sample;
•
Date of sampling;
•
List of analyses required;
•
Customs approval;
•
Waybill number;
•
Name and signature of sampling personnel;
•
Transfer of custody acknowledgement.
• Samples are delivered to the analytical laboratory by courier. A copy of the Chain of
Criteria
JORC Code explanation
Commentary
Custody form is signed and dated and placed in a sealable plastic bag taped on top of the
lid of the sample box. Each sample batch is accompanied by a Chain of Custody form.
Audits or
reviews
•
•
The results of any audits or reviews of sampling
techniques and data.
No audit has been conducted.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a