30 September 2024 Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
Akora
Ltd 30 September 2024
For
theResources
quarter ended
ABN 90 139 847 555
ASX Code: AKO
1
Quarterly
Report
For the quarter ended
30 September 2024
www.akoravy.com
AKORA is developing a highgrade Direct Shipping Ore
(DSO) iron ore mine in
Madagascar.
This will be further developed
into serving the steel industry’s
accelerating focus on reducing
carbon dioxide (greenhouse
gas) emissions through
decarbonisation.
Highlights
• Geotechnical and hydrological drilling completed
at the Company’s high-grade Bekisopa iron ore
Project to support the Pre-Feasibility Study due
for completion in Q1 2025.
• The road route and design work linking the
Company’s Bekisopa and Satrokala projects is
progressing with the road route survey
completed.
• The Satrokala maiden exploratory drilling
program was commenced during the Quarter
after the environmental permit for early
exploration works was approved.
For the quarter ended 30 September 2024
2
Bekisopa Iron Ore Project
Ownership 100% | Madagascar, Africa
AKORA is advancing plans at Bekisopa to produce up to 2 million tonnes per annum (Mtpa) of a
+60% iron (Fe) average grade direct shipping ore (DSO) for export to Blast Furnace-Basic Oxygen
Furnace (BF-BOF) steelmakers. Bekisopa’s high-grade iron ore may also be upgraded in the
future to a +68% Fe concentrate at 75 microns for shipping to Direct Reduced Iron-Electric Arc
Furnace (DRI-EAF) steelmakers to make greener steel without coal and considerably less carbon
emissions.
Bekisopa Geotechnical drilling completed
The Bekisopa Stage 1 DSO Project is advancing through the Pre-Feasibility Study (PFS) requirements
with strong progress achieved during the quarter. Geotechnical drilling, a key PFS work component, was
completed in July and the data returned will serve the mine’s design.
Totalling 400m, eight holes were drilled covering the proposed DSO mining pits across the southern,
central and northern regions of the project. The geotechnical samples have been delivered to the ALS
laboratory in Perth for analysis with assay results expected at the end of November and mineralogy
assessment to then follow.
The geotechnical program has two main aims;
•
to provide rock strength data for the mine design team who will be preparing the mining pit
shapes for the DSO material; and
•
to indicate the competency of the iron ore resource to determine if drill and blast, or simple
machine ripping will be necessary prior to digging.
Preliminary indications are favourable that the DSO resource is of a low competency and that the
resource is unlikely to require drill and blast, in turn reducing the complexity and operating costs, and
supporting the assumptions of the Bekisopa Scoping Study.
Bekisopa Hydrogeology Drilling
During the quarter, AKORA also completed a four holes hydrogeology drilling program as part of the
PFS. Two of the holes were 150m deep while the other two holes were drilled to a depth of 70m.
The program was designed to;
•
identify water levels and recharge capacity such that the water system can be considered for future
operational water requirements;
•
provide baseline information on location and quality of sub surface water resources to support the
environmental management plan; and
•
determine the presence of sub surface water levels and if they impact the mine pit designs and any
requirements for dewatering infrastructure.
Preliminary data has identified that sub surface water is present at approximately 30m depth
and that sub surface water with reasonable inflows are present at 55m depth. This is very favourable
given the DSO pits are not expected to operate below 30m, hence reducing the need for water removal.
For the quarter ended 30 September 2024
3
This data also suggests that the sub surface water may provide a feasible solution for the minimal water
requirements of the DSO processing phase.
The hydrogeological data will be used by the Company’s consultants Wardell Armstrong International to
develop site water models and support the Environmental and Social Impact Assessment.
Bekisopa Road Route Design
An important task in advancing the PFS and moving the project towards commercialisation
is developing the product transport logistics requirements for the Bekisopa DSO mine, which entails both
the road design and the port shipping requirements. To that point, AKORA has progressed the road
route survey works and design. The port workings will be the subject of a future announcement.
The road works can be summarised as;
•
•
•
•
identifying the new road required to link the Bekisopa Project area to the Satrokala Project area;
detailing any possible road upgrades from the Satrokala Project area to the RN7 National highway;
considering alternative road options along this path;
detailing the engineering and developing the quantities and costs for constructing and upgrading the
roads; and
• detailing the permitting pathway and Government and Community engagement requirements for the
road works.
The road route field work was completed in late June 2024 and the road route findings are
detailed in Figure 1, with the engineering detail currently being developed. A further update and
report on the road design and considerations is expected in August 2024. All road design
information will be incorporated into the Bekisopa PFS.
Figure 1: Proposed Bekisopa mine to port transport route.
For the quarter ended 30 September 2024
4
Satrokala Project
Ownership 100% | Madagascar
AKORA’s Satrokala Iron Ore Project has emerged as a significant prospect after a recent
magnetic survey1 identified a major anomaly up to 10km long and 2km wide, making it some 66%
larger than the Company’s more advanced Bekisopa Iron Ore Project.
Maiden Exploration Drilling
A maiden drill program planned 10 x 100m holes and began at Satrokala in July. Five holes totalling
501.7m have since been drilled to test several of the magnetic anomalies running north to south along
the 10km of strike length. All five holes appear to have intercepted potential mineralisation. While
assaying is still being completed, the drill core looks similar to the nearby Bekisopa ‘green steel’ fresh
rock. However, the magnetic susceptibility readings are comparably lower than Bekisopa.
Drilling is planned to resume once the geology, grade and mineralogy of the drill core is better
understood.
Figure 2. Satrokala drill plan and the associated ground magnetic survey results.
1 Refer ASX Announcement 20 March 2024.
For the quarter ended 30 September 2024
5
Four holes (SATD01, SATD02, SATD03 and SATD05) were oriented at a dip of 50 degrees, either to the
east or west, to drill into the magnetic anomaly (locations in Table 1). One hole (SATD04) was drilled
vertically at 90 degrees into a wider and steeper dipping anomaly to test the depth and continuity of the
potential mineralisation. Drill hole orientation and positioning to the magnetic anomalies are shown in
Figure 3 below.
Figure 3. Ground magnetic survey results cross section showing drill holes SATD03 to SATD05.
Drillhole_ID
UTM_x
UTM_y
Inclination
Azimuth
Length
SATD01
571,197
7,571,043
-50
66
100.3
SATD02
571,198
7,571,485
-50
246
100.3
SATD03
569,357
7,569,277
-50
76
100.3
SATD04
568,960
7,569,194
-90
0
100.5
SATD05
569,691
7,569,361
-50
76
100.3
Table1. Drill hole locations, inclinations and depths.
Drilling locations SATD01 to SATD04 were in country rock that has a brown to grey-coloured soil with
minimal iron mineralisation / scree on surface, as observed at drill location SATD03 (Figure 4). The last
drill hole completed, hole SATD05, was in the more typical red ferruginous soils like that observed in the
weathered zone at the company’s nearby and more advanced Bekisopa Iron Ore Project. The first few
metres of drill core of hole SATD05 look to contain some typical weathered iron mineralisation. Figure 5
shows images of drill hole SATD05’s location and the weathered magnetic minerals on the surface.
For the quarter ended 30 September 2024
Figure 4. Drilling at SATD03 and looking to the east showing the location of drill pad SATD05 on the
nearby ridge.
Figure 5. Satrokala drill hole SATD05 showing weathered red ferruginous soil and nearby magnetic
mineralisation.
6
For the quarter ended 30 September 2024
7
Figure 6. Drill core from drill hole SATD03 showing possible fine disseminated mineralisation
at depth.
Each drill hole showed a minimal weathered zone as expected from the ground magnetic intensity
readings and then wide intercepts of reasonably continuous possible disseminated mineralisation. Figure
6 above shows the drill core sections from drill hole SATD03, from 71 to 86m downhole.
The field portable magnetic susceptibility measurements were lower than expected for the degree of
apparent mineralisation, compared to similar Bekisopa core sections, which could imply that minerals
other than highly magnetic magnetite may be present. There were also some sulphides noted, like pyrite
and pyrrhotite (being a less magnetic iron sulphide), and observed in some drill core sections.
Figure 7 overleaf shows the early geological interpretation from drill holes SATD01 and SATD02 on the
eastern side of the project, with each drill hole intercepting potential mineralisation down hole to 100m.
For the quarter ended 30 September 2024
8
Figure 7. Geological interpretation from drill holes SATD01 and SATD02, looking from the
east.
Cautionary Note
A cautionary note is mandated by the ASX and of good practice given the Company wishes to advise the reader of
the preliminary findings of the drilling program but recognises that assay and mineral analysis has not yet occurred.
The potential mineralisation, as evident visually from the fresh drill core, depicts that of iron mineralisation as
further supported by the underlying ground magnetic survey results previously reported. The type of mineralisation,
its nature and any comment on abundance is not being speculated at this early stage.
“Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses
where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially
provide no information regarding impurities or deleterious physical properties relevant to valuations.”
The Company will update the market when laboratory analytical results become available for these samples.
For the quarter ended 30 September 2024
9
Corporate
Cash Position
AKORA Limited held cash reserves at the end of quarter of approximately $1.129 million.
Shareholder Information
As at 30 September 2024, the Company had 686 shareholders and 120,487,376 ordinary fully paid
shares on issue with the top 20 shareholders holding 58.32% of the total issued capital.
ASX Additional Information
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter was
$1,419,018. Full details of exploration activity during the quarter are set out in this report.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and development
activities during the quarter.
ASX Listing Rule 5.3.5: Payment to related parties of the Company during the quarter was $107,276 in
cash. A description of and explanation for payments to related parties and their associates per Section
6.1 of the Appendix 5B following this Quarterly Activities Report is set out in the table below:
Director Remuneration
Current Quarter
Managing Director fees
62,499
Non-Executive Director fees
35,000
Superannuation
9,777
Total
107,276
Board and Senior Management
Graeme Hunt
Paul Bibby
Matthew Gill
Shane Turner
Jason Whittle
Non-executive Chairman
Managing Director & Chief Executive Office
Non-executive Director
Chief Financial Officer & Company Secretary
General Manager - Development
For the quarter ended 30 September 2024
10
ASX Announcements during the quarter
The following announcements were lodged on the ASX Market Announcements Platform during the
quarter:
Date
Description
15 July 2024
15 July 2024
31 July 2024
8 August 2024
15 August 2024
3 September 2024
12 September 2024
Change in substantial holding
Project Update – Bekisopa and Satrokala Iron Ore Projects
30 June 2024 Quarterly Activities & Cashflow Report
Satrokala Iron Ore Project First Exploratory Drilling Update
Satrokala Iron Ore Project First Exploratory Drilling Revised
Akora & Madagascar Ministry of Mines Present at ADU Perth
Half Yearly Report and Accounts
These announcements are available for viewing on the Company’s website www.akoravy.com.
Other details
Head Office
12 Anderson Street
West Ballarat Vic 3350
Phone: +61 419 449 833
Website: www.AKORAvy.com
This announcement is authorised by the Board.
For further information contact:
Paul Bibby
Managing Director
AKORA Resources
+ 61 (0) 419 449 833
paul.bibby@AKORAvy.com
Matthew Lindh
Corporate Advisor
Harbury Advisory Pty Ltd
+ 61 (0) 432 363 933
mlindh@harbury.com.au
Gareth Quinn
Investor Relations
Republic PR
+ 61 (0) 417711108
gareth@republicpr.com.au
The Company confirms that it is not aware of any information or data that materially affects the information
included in the relevant market announcement and all material assumptions and technical parameters
underpinning the estimates in the Original Announcement continue to apply and have not materially
changed.
For the quarter ended 30 September 2024
11
Competent Persons’ Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist
(Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific Professions (SACNASP).
Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and the activity being undertaken to qualify as a Competent Person as
defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the
2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the information in this release in the
form and context in which it appears.
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Director of AKORA Resources Limited (AKO), as such he is a shareholder in
AKORA Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its
processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and
mineral processing results.
The data in this report that relates to Mineral Resource Estimates and Exploration Targets for the
Bekisopa deposits is based on information evaluated by Mr Simon Tear who is a Member of The
Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant
to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Tear
is a Director of H&S Consultants Pty Ltd and he consents to the inclusion in the report of the Mineral
Resource in the form and context in which they appear.
For the quarter ended 30 September 2024
12
Tenement Interests
As at 30 September 2024, the Company had interests in the following tenements (as required by Listing
Rule 5.3.3). There were no changes in the Company’s interests in tenements during the quarter.
Project
Location
Tenement
Number
Blocks
Bekisopa PR
Madagascar, Africa
10430
64
100%
Bekisopa PR
Madagascar, Africa
27211
128
100%
Bekisopa PR
Madagascar, Africa
35827
32
100%
Bekisopa PRE
Madagascar, Africa
3757
16
100%
Samelahy PR
Madagascar, Africa
6595
98
100%
Samelahy PR
Madagascar, Africa
13011
33
100%
Samelahy PR
Madagascar, Africa
21910
3
100%
Tratramarina East PR
Madagascar, Africa
16635
144
100%
Tratramarina East PR
Madagascar, Africa
16637
48
100%
Tratramarina East PR
Madagascar, Africa
17245
160
100%
Tratramarina West PRE
Madagascar, Africa
18379
16
100%
Tratramarina West PRE
Madagascar, Africa
18891
48
100%
Current Interest
For the quarter ended 30 September 2024
Mineral Resources and Ore Reserves
AKORA’s Resource at 30 September 2024
13
For the quarter ended 30 September 2024
Table 1. Bekisopa MRE Direct Shipping Ore Zone
Notes
1.
Mineral Resources are limited by an optimised open pit shell based on appropriate technical and economic parameters.
2.
Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a Pre-Feasibility Study or
1.
Feasibility Study.
2.
Mineral Resources are reported inclusive of any Ore Reserves.
3.
Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by Richard Ellis, an
4.
independent Competent Person as defined by JORC.
5.
The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title, taxation, sociopolitical,
marketing or any other relevant issues.
6.
All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due to rounding.
Upgraded Bekisopa DSO Resource, ASX Announcement 3 June 2024.
14
For the quarter ended 30 September 2024
15
Company Profile
Iron ore for tomorrow’s steel making
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development
of four high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (mt) Inferred JORC Resource
(ASX Announcement 11 April 2022) with very low impurities able to produce a premium-priced +68% Fe
concentrate. Direct Reduced Iron-Electric Arc Furnace (DRI-EAF) technology which is used to make
greener steel without coal and considerably less carbon emissions requires iron ore grades of at least 67%.
To generate cash in the near-term, AKORA is advancing plans at Bekisopa to produce up to 2Mt per annum
over the first five years of a 60% Fe average grade direct shipping ore (DSO) (ASX Announcement 14
November 2023) for shipping to Blast Furnace-Basic Oxygen Furnace (BF-BOF) steelmakers.
The Company confirms that it is not aware of any new information or data that materially affects the above
and that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed.
For the quarter ended 30 September 2024
16
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AKORA Resources Limited
ABN
Quarter ended (“current quarter”)
90 139 847 555
30 September 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
1.2
Receipts from customers
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
Dividends received (see note 3)
Interest received
Interest and other costs of finance paid
Income taxes paid
Government grants and tax incentives
Other
(Cash Boost from Commonwealth
Government)
Net cash from / (used in) operating
activities
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f) other non-current assets
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
Cash flows from loans to other entities
Dividends received (see note 3)
2.2
2.3
2.4
Year to date
(9-months)
$A’000
-
-
(107)
(263)
(417)
(927)
7
17
(363)
(1,327)
(1,419)
(2,396)
For the quarter ended 30 September 2024
Consolidated statement of cash flows
2.5
2.6
Other
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
Proceeds from issue of convertible debt
securities
Proceeds from exercise of options
Transaction costs related to issues of equity
securities or convertible debt securities
Proceeds from borrowings
Repayment of borrowings
Transaction costs related to loans and
borrowings
Dividends paid
Other (provide details if material)
Net cash from / (used in) financing
activities
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
Net cash from / (used in) operating
activities (item 1.9 above)
Net cash from / (used in) investing activities
(item 2.6 above)
Net cash from / (used in) financing activities
(item 3.10 above)
Effect of movement in exchange rates on
cash held
Cash and cash equivalents at end of
period
4.2
4.3
4.4
4.5
4.6
5.
Reconciliation of cash and cash
equivalents
17
Current quarter
$A’000
Year to date
(9-months)
$A’000
(1,419)
(2,396)
3,811
(272)
-
3,539
2,911
1,314
(363)
(1,327)
(1,419)
(2,396)
3,539
(1)
1,129
Current quarter
$A’000
1,129
Previous quarter
$A’000
at the end of the quarter (as shown in
the consolidated statement of cash
flows) to the related items in the
accounts
5.1
5.2
5.3
5.4
5.5
Bank balances
Call deposits
Bank overdrafts
Other US dollar accounts
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2
1,122
9
2,883
5
1,129
19
2,911
For the quarter ended 30 September 2024
18
6.
Payments to related parties of the entity and their
associates
6.1
6.2
Current quarter
$A'000
Aggregate amount of payments to related parties and their
associates included in item 1
Aggregate amount of payments to related parties and their
associates included in item 2
107
-
Note: Salaries and superannuation for directors.
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
Add notes as necessary for an understanding of
the sources of finance available to the entity.
7.1
7.2
7.3
7.4
Loan facilities
Credit standby arrangements
Other (Convertible Notes)
Total financing facilities
7.5
7.6
Unused financing facilities available at quarter end
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
$A’000
8.
Estimated cash available for future operating activities
8.1
8.2
8.3
8.4
8.5
8.6
8.7
Net cash from / (used in) operating activities (item 1.9)
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
Total relevant outgoings (item 8.1 + item 8.2)
Cash and cash equivalents at quarter end (item 4.6)
Unused finance facilities available at quarter end (item 7.5)
Total available funding (item 8.4 + item 8.5)
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
363
1,419
1,782
1,129
1,129
0.63
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A.”
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
For the quarter ended 30 September 2024
8.8
19
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating cash
flows for the time being and, if not, why not?
8.8.2
8.8.3
Answer. No. The Company expenditure on exploration, at both Bekisopa and Satrokala, is
completed and the required PFS field work, including hydrology and Geotech drilling, has
been completed during Q2 and Q3 2024. Planned work over the next two quarters will be
focussed on collating and reporting for the PFS due for release in Q1 2025.
Has the entity taken any steps, or does it propose to take any steps, to raise further cash to
fund its operations and, if so, what are those steps and how likely does it believe that they
will be successful?
Answer. No.
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer. Yes. Reduced expenditure as stated above in response to 8.8.1.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
2
This statement has been prepared in accordance with accounting standards and policies which comply with Listing
Rule 19.11A.
This statement gives a true and fair view of the matters disclosed.
Date:
31 October 2024
Authorised by:
Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the
past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information
over and above the minimum required under the Listing Rules is encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB
6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent
standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the
accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board.” If it has been authorised
for release to the market by a committee of your board of directors, you can insert here: “By the [name of board committee – e.g. Audit and Risk
Committee].” If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee.”
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with
recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the board should have
received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this
report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has
been formed on the basis of a sound system of risk management and internal control which is operating effectively.
Share your feedback
Discover