Annual Report to shareholders
Released
Released
Announcement PDF
1
ANNUAL
REPORT
2025
For the year ended 31 December 2025
AKORA Resources Limited
ACN 139 847 555
ASX: AKO
Akora Resources Limited Annual Report for the year ending 31 December 2025
2
Contents
32
Consolidated
Statement of Profit
or Loss and other
Comprehensive
Income
31
Consolidated
Financial
Statements
33
Consolidated
Statement of
Financial Position
34
Consolidated
Statement of
Changes in Equity
35
Consolidated
Statement of Cash
Flows
64
Directors’
Declaration
03
Corporate
Directory
04
Chairman’s Letter
05
Review of
Operations
11
Corporate
12
Competent
Persons’
Statement
13
Mineral Resources
and Ore Reserves
14
Directors’ Report
24
Remuneration
Report
30
Auditor’s
Independence
Declaration
65
Independent
Auditor’s Report
70
ASX Information
36
Notes to the
Consolidated
Financial Statements
63
Consolidated
Entity Disclosure
Statement
Akora Resources Limited Annual Report for the year ending 31 December 2025
3
AKORA is developing high-grade, high purity iron
ore projects in Madagascar to serve the global
steel industry’s accelerating decarbonisation
through reduced carbon dioxide emissions.
The Company’s flagship high-grade Bekisopa Iron Ore Project
has a 194.7 million tonne Inferred JORC Resource with very low
impurities able to produce a premium-priced +68% iron
concentrate ideal for green steel manufacturing processes.
Directors
Graeme Hunt – Non-Executive Chairman
Paul Bibby – Managing Director (resigned
15 May 2025)
Peter Bird – Managing Director (appointed
15 May 2025)
Matthew Gill – Non-Executive Director
Company Secretary
Shane Turner
Head Office and Registered Office
12 Anderson Street West, Ballarat
Victoria, Australia 3350
PO Box 28 Ballarat
Victoria, Australia 3353
Phone +61 (3) 9381 0859
Website
www.akoravy.com
Share Registry
MUFG Corporate Markets (AU) Limited
Liberty Place, Level 41, 161 Castlereagh
Street, Sydney, New South Wales
Phone 1300 554 474
Stock Exchange Listing
Australian Securities Exchange Limited
ASX Code: AKO
Australian Company Number
139 847 555
Solicitor
CBW Partners
Level 1, 159 Dorcas Street
South Melbourne Victoria 3205
Corporate Advisors
Sanlam Private Wealth
Level 7, 100 Collins Street
Melbourne Victoria
Auditor
Hall Chadwick WA Audit Pty Ltd
283 Rokeby Rd
Subiaco Western Australia, 6008
ABN 33 121 222 802
hallchadwick.com.au
Corporate Directory
3
Akora Resources Limited Annual Report for the year ending 31 December 2025
4
Chairman’s Letter
Dear Fellow Shareholders,
The year ending 31 December 2025 was the most productive in Akora's history. We delivered a landmark Pre-
Feasibility Study, extended our resource footprint through exploration, secured critical tenement renewals, and
lodged our Mining Permit application — with that permit subsequently granted in January 2026. The Company is now
firmly on the pathway to becoming Madagascar's next iron ore producer.
Pre-Feasibility Study
Released in March 2025, the PFS confirmed our high-grade Bekisopa iron ore Project as a high-quality, low-capital
project with compelling economics: Stage One initial capex of US$60.6 million (including 15% contingency), a pre-
tax NPV10 of US$147 million, an IRR of 86%, and pre-tax cash flows of US$310 million over an initial six-year mine life
at 2 Mtpa. Capital payback is estimated at 1.8 years. The study confirmed that weathered ore zones are amenable to
ripping rather than drill-and-blast — reducing costs and improving the project's risk profile — and validated a pathway
to a Final Investment Decision.
Exploration and Tenement Security
In April 2025, Madagascar's Bureau du Cadastre Minier renewed Bekisopa's primary tenement PR10430 — the first
permit renewed in the country in many years — reinforcing tenure security ahead of the project’s development phase.
The Board then approved a surface trenching program across 1.5 km of strike length between the Southern and
Central resource zones. The completed 339-metre, eight-trench program returned best intercepts of 36 metres at
63.8% iron and 87 metres at 60.5% iron, confirming geological continuity and supporting a resource update to
incorporate DSO potential outside the current resource footprint.
Mining Permit — A Transformational Milestone
In November 2025, Akora submitted a formal application to convert the Bekisopa exploration licence to a Mining
Permit, supported by strong endorsements from Madagascar's new national leadership — including the President
and the Minister for Mines. Subsequent to the period end, on 27 January 2026, the Council of Ministers formally
granted Bekisopa’s mining permit, with the ASX announcement made on 4 March 2026. The permit covers
approximately 25 square kilometres and is valid for 25 years, encompassing both the Stage 1 DSO operation and any
future Stage 2 magnetite development. This milestone enables Akora to accelerate engagement with strategic
partners, project banks and offtake financiers as we progress toward FID.
Acknowledgements
I extend my sincere thanks to Peter Bird and the Akora management team for their execution across a demanding
year. I also wish to acknowledge Paul Bibby, who retired as Managing Director and Chief Executive Officer during the
year — Paul's leadership was instrumental in advancing Bekisopa to pre-feasibility stage.
To our shareholders, I sincerely thank you for your support, noting that the granting of the Bekisopa Mining Permit is
a pivotal milestone that would not have been possible without your demonstrated ongoing faith in the Company. We
enter 2026 in the strongest position for our flagship high-grade iron ore project at Bekisopa in the Company's history,
and we look forward to unlocking and delivering on the substantial value this project holds.
Graeme Hunt
Chairman
Akora Resources Limited
Akora Resources Limited Annual Report for the year ending 31 December 2025
5
Review of Operations
Akora Resources Limited Annual Report for the year ending 31 December 2025
6
Project Overview
AKORA Resources (ASX: AKO) is an Australian resources company focused on
the development of high-grade, high purity iron ore projects in Madagascar to
serve the global steelmaking industry’s accelerating decarbonisation.
Figure 1. AKORA’s iron ore projects are four of many active mining projects in Madagascar
Akora Resources Limited Annual Report for the year ending 31 December 2025
7
Bekisopa Iron Ore Project
Ownership 100% | Madagascar
AKORA is currently advancing its flagship Bekisopa Iron Ore Project in
Madagascar through a Pre-Feasibility Study (PFS) towards a Financial Investment
Decision as the company seeks to serve a decarbonising steel industry reducing
carbon dioxide emissions with increasing demand for high grade, high purity iron
ore. It has an Inferred Resource of 194.7 million tonnes.
A PFS for Bekisopa’s Stage 1 Direct Shipping Ore (DSO) operation was released on 31 March 2025.
Highlights
• Bekisopa iron ore project Pre-Feasibility Study (PFS) for a 2 million tonne per annum (Mtpa) Direct
Shipping Ore (DSO) operation in Madagascar confirms strong economics.
• Average Life of Mine (LOM) Lump product grade at 62% Iron (Fe) and Fines product grade at 61%Fe
over an initial 6 year mine life, with potential to add to the DSO inventory and a potential multi-year
Stage 2 to follow.
• Over the LOM, the operation delivers 40% Lump and 60% Fines products.
• Start-up capital of US$60.6 million (M), including US$6.8M in EPCM costs and a 15% contingency, with
capital payback in 1.8 years from first production.
• This investment delivers revenues of US$789M (A$1.25B), C1 cash cost of US$42/t and pre-tax cash
flow of US$310M (A$0.5B).
• Robust financials with NPV10 of US$147*M pre-tax (A$233M) and IRR of 86%.
• Bekisopa Maiden Ore Reserve statement confirms 9.1Mt and a low strip ratio of 0.52.
• Pathway to Final Investment Decision in mid-2026 and first shipment in Q3 of 2027.
The Pre-Feasibility Study (PFS) demonstrates that its flagship 100%-owned Bekisopa iron ore Project in
Madagascar could produce an initial Stage One 2Mtpa of 61.6%Fe average blended grade lump and
fines iron ore products for blast furnace steelmakers.
This Study, which enhances the Scoping Study completed by the Company in 2023, confirms that the
Bekisopa operation has a low capital cost entry case of US$60.6M and would generate a pre-tax cash flow
of US$310M over an initial 6 year mine life from revenues of US$789M.
Other key metrics to the Bekisopa PFS, include:
• MRE Indicated Resource tonnage has increased to 8.5Mt @55.4%Fe from 4.4Mt @60.9%Fe.
• Geotechnical studies show that the DSO JORC Reserve will not require drill and blasting.
• New road route from Bekisopa to the Zomandoa River crossing surveyed to be ~25kms.
Akora Resources Limited Annual Report for the year ending 31 December 2025
8
• The Toliara town by-pass road off the RN7, National Highway, enables the existing port to be utilised
to export Bekisopa iron ore products.
Table 1: Bekisopa PFS Key Metrics
Mining Permit Granted
Highlights:
• Significant regulatory milestone achieved: The Ministry of Mines has formally issued the Mining Permit
for the Bekisopa high-grade iron ore project, located in Madagascar.
• Clear pathway to Production: The issuance of the Mining Permit allows AKORA to advance the
Bekisopa project from exploration to development.
• Value creation inflection point: This now allows AKORA to accelerate the project development
initiatives with strategic and funding partners, banks and offtake financing providers.
Background
As announced on 26 November 2025, the Company formally lodged its application for the Bekisopa Mining
Permit1
, better known as the Permis d’Exploitation (“PE”). Following a thorough review and consultation
process, the Mining Permit has now been granted by the Ministry of Mines and registered with the Bureau
du Cadastre Minier de Madagascar (BCMM) in accordance with the Malagasy Mining Code. The grant of
1
ASX Announcement 26 November 2025 What Footnote does this below to?
Akora Resources Limited Annual Report for the year ending 31 December 2025
9
the Mining Permit is subject to the satisfaction of customary regulatory requirements by the Company. This
includes compliance with all regulatory provisions governed by the Mining Code. The mining permit is
valid for twenty-five (25) years, providing long term tenure and covers an area of approximately 25 km2
.
The grant of this Mining Permit (PE 10430) forms a pivotal, value-creating, derisking milestone for the
project and enables AKORA to substantially advance the progress of the high-grade Bekisopa iron ore
project from exploration to project development and mining. This event is expected to:
• Accelerate interest and engagement with strategic partners and potential joint venture participants,
• Provide the regulatory certainty required to materially advance financing discussions,
• Commence detailed planning for a Feasibility Study and secondary permits, paving the way for
commercial activities at the site, and
• Supports continued positive engagement with local communities and stakeholders, and commence
discussions for local procurement, which will strengthen the Company’s social licence to operate.
Mining Permit Term and Renewal
The Mining Permit has been granted for an initial term of 25 years in accordance with the Mining Code. It
is renewable after the initial term in accordance with the prevailing terms in the Mining Code.
Regulatory Compliance and Sustainability
The Company continues to conduct all activities in accordance with relevant Malagasy laws, including
environment, social, health and safety requirements. The Company remains committed to ongoing
engagement with regulators and local communities, ensuring responsible operations and best practice
with ESG requirements.
Trenching Program Extends High-Grade Iron Mineralisation at Bekisopa
Highlights
• During the reporting period, 339 metres of trenching was conducted and delivered further easily
accessible Direct Shipping (DSO) high-grade iron ore between the existing JORC South and Central
resource zones1
.
• All 8 trenches intersect iron mineralisation.
• Best high-grade iron Direct Shipping Ore (DSO) trenching intercepts:
Trench Number Trench length (metres)
Average Iron Grade
(%Fe)
BEKT001 36 63.8
including 14.5 66.3
BEKT002 87 60.5
including 33.2 64.4
• Results reinforce the strong upside to expand the Indicated DSO Resource footprint of the Bekisopa
tenement.
Assays from the program completed in October 2025, have returned multiple high-grade iron intersections
of DSO style mineralisation in a region not previously drilled between the known Southern and Central
Akora Resources Limited Annual Report for the year ending 31 December 2025
10
Resource zones. The surface trenching program consisted of 8 exploration trenches totalling 339 metres in
length to typically a maximum depth of 2 metres, with some deeper.
Satrokala Project
Ownership 100% | Madagascar
AKORA’s 100% owned Satrokala Project is located just 40km to the south-west of
our flagship Bekisopa Project and offers considerable upside advantage to our
development of the area.
10km Magnetic Strike length
In March 2024, Satrokala emerged as a significant prospect after a magnetic survey conducted in 2023
identified a major anomaly up to 10km long and 2km wide, making it up to 66% larger than the
Company’s more advanced Bekisopa Project.
The magnetic survey covered just 10km of a potential 30km zone of prospective iron mineralisation
previously identified in this project area. Four magnetometer units were used and a team of five
geologists walked the extent of the tenements under the supervision of Planetary Geophysics, Australia.
The Satrokala magnetic units are modelled as seven to eight continuous features along the 10kms of
strike length and trending north-northwest/south-southeast, to interpreted depths of +1,000m and with
combined widths of some ~450m in the north broadening to ~1,280m in the south.
The survey results served to pinpoint 10 locations for exploratory maiden drilling at Satrokala in July. The
first five drill holes totalling 501.6m and all returned intersections of low-grade iron mineralisation.
Intercept thicknesses ranged up to 51m and averaged 5.1% Fe. The continuous and wide iron intercepts
were extensive and explain the magnetic anomaly but grades were lower than expected. The Company
will reassess all the Satrokala geological information and determine if there are areas along the remaining
8km of strike that may contain higher grade magnetite mineralisation before any future drilling.
Satrokala was on care and maintenance during the year while the Bekisopa Project was progressed.
Akora Resources Limited Annual Report for the year ending 31 December 2025
11
Corporate
Capital raisings
In February 2025, the Company announced an equity raising of $1.118 million through a placement of
fully paid ordinary shares to institutional and sophisticated investors.
In August 2025, the Company announced an equity raising of $2.91 million through a placement of fully
paid ordinary shares to institutional and sophisticated investors for $0.83 million and a 1 for 6 non-
renounceable entitlement offer to shareholders for $2.08 million.
Strategic Investor Process
During the year, the Company continued to engage with potential strategic investors. The Company
remains in discussion with potential strategic investors, with renewed interest now that the Mining Permit
for the Bekisopa Project has been granted. There remains a variety of funding structures and valuations
being proposed of which the Board is continuing to carefully consider and work through these options.
The Board remains encouraged by the proposals and discussions held to date.
Leadership changes
AKORA appointed Mr Peter Bird as Managing Director and Chief Executive Officer after the resignation
of Mr Paul Bibby, effective from 15 May 2025.
Mr Bird is a geologist with broad mining industry executive experience. Prior to joining AKORA Peter was
Executive General Manager at Rex Minerals where he played a key role in the successful acquisition of Rex
Minerals by Mach Metals. Peter’s prior roles include Executive Chairman of Zenith Minerals Ltd, CEO of
Asiamet Resources Limited, Non-Executive Chairman of Excelsior Gold Limited and as joint founder and
Managing Director of Heemskirk Consolidated Limited prior to its takeover by a private equity group. Peter
has extensive capital markets and investor relations experience having held senior Investor Relations roles
with Newcrest Mining and Normandy Mining and as a Senior Analyst with Merrill Lynch Equities Australia.
Peter is currently Non-Executive Chairman of ASX listed base and precious metals explorer Cosmo Metals.
Peter holds a Bachelor of Science (Honours), Geoscience Major, Botany & Economics. Peter is a member
of the AICD.
Akora Resources Limited Annual Report for the year ending 31 December 2025
12
Competent Persons’ Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist (Pr.Sci.Nat.
- 400155/13) with the South African Council for Natural Scientific Professions (SACNASP). Mr. Leeuwner
has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and the activity being undertaken to qualify as a Competent Person as defined in the
December 2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the information in this
release in the form and context in which it appears.
The information in this document that relates to the Mineral Resource estimate of the Bekisopa project is
based on and fairly represents information and supporting documentation compiled and reviewed by Mr.
Richard Ellis, a full-time employee of Wardell Armstrong International and independent of Akora
Resources. Mr. Ellis is a Chartered Geologist (CGeol) and Fellow of the Geological Society of London,
and European Geologist (EurGeol) of the European Federation of Geologists, and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012
edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves" ('JORC Code'). Mr. Ellis consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
The information in this document that relates to the Ore Reserve estimate for the Bekisopa project, is
based on and fairly represents information and supporting documentation compiled and reviewed by Mr.
Colin Davies, a full-time employee of Wardell Armstrong International and independent of Akora
Resources. Mr. Davies is a Chartered Mining Engineer (CEng), a Member of the Institute of Materials,
Minerals and Mining UK (MIMMM), and Qualified for Minerals Reporting (QMR). Mr. Davies has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012
edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves" ('JORC Code'). Mr. Davies consents to the inclusion in the report of the matters based upon
the information in the form and context in which it appears.
Akora Resources Limited Annual Report for the year ending 31 December 2025
13
Mineral Resources and Ore Reserves
Table 2: Bekisopa Mineral Resource Estimate (Inferred Resource) as at 31 December 2025.
Table 3: Bekisopa 2025 Ore Reserve Estimate
Notes:
1. The effective date of the Ore Reserve estimate is 07 February 2025.
2. The Ore Reserves estimate is reported in accordance with the guidelines of the JORC Code (2012). 3. Variable cut-off grades
have been applied to meet product requirements, of Enriched >60% Fe, Intermediate A 40-60% Fe, and Intermediate B 30-40%
Fe.
4. The Ore Reserve estimate is based on optimisation parameters including a selling price of $110/t for 62% Fe concentrate and
takes into account Modifying Factors related to mine design, geotechnical parameters, mining and processing costs, processing
recoveries, G&A, ESG and royalty costs. Mining dilution varies by domain between 1-3% based on diggability and rippability
considerations. Mining recovery varies between 97-99% by domain.
5. Quantities are in dry metric tonnes as transported to the ROM. Figures have been rounded to an appropriate level of
precision. Due to rounding some totals may not compute exactly as shown.
Akora Resources Limited Annual Report for the year ending 31 December 2025
14
Directors’ Report
15
The directors present their report, together with the financial statements of AKORA Resources Limited (ACN 139 847 555) and
the entities it controlled at the end of, or during, the year ended 31 December 2025 (hereafter referred to as the “Company”), for
the financial year ended 31 December 2025.
Principal Activities
The principal activities of the Company during the financial year were exploration for and development of iron ore in
Madagascar. There was no significant change in the nature of these activities during the year.
Operating Results, Review of Operations for the Year and Significant Changes in State of Affairs
The net loss after tax attributable to shareholders of AKORA Resources Limited of $1,989,372 for the year ended 31 December
2025 (the net loss after tax for the previous financial year was $2,200,221).
Dividends
No dividends were declared and paid during the year.
Events After Balance Date
On 3 February 2026, the Company issued Mr GP Hunt 500,000 shares as his performance rights conditions had been met.
On 4 March 2026, the Company announced that a Mining Permit was granted for its Bekisopa high-grade iron ore project. The
Mining Permit is valid for 25 years.
On 23 March 2026, the Company announced it had appointed Grant Samuel Corporate Finance to accelerate its Strategic
Financing and Partnering Initiatives.
Environmental Issues
The Company's projects are subject to the laws and regulations regarding environmental matters in Madagascar. Many of the
activities and operations of the Company cannot be carried out without prior approval from and compliance with all relevant
authorities. The company conducts its activities in an environmentally responsible manner and in accordance with all applicable
laws. However, the company could be subject to liability due to risks inherent to its activities, such as accidental spills, leakages
or other unforeseen circumstances.
Overview
The Company incurred $1,359,514 on exploration and evaluation of the Bekisopa project.
The financial performance of the Company for the five years to 31 December 2025 is as follows:
31 December 2025 2024 2023 2022 2021
Net loss after tax 1,989,372 2,200,221 1,594,970 1,051,025 1,077,391
Loss per share (cents) 1.35 1.97 1.85 2.18 1.77
Exploration expenditure 1,359,514 3,286,660 1,041,600 1,675,840 3,445,007
DIRECTORS’ REPORT
16
Information on Directors and Key Management Personnel
The following persons were the directors in office during the period 1 January 2025 to 31 December 2025 and since year-end
unless otherwise stated:
GP Hunt Independent Non-executive Chairman (appointed on 1 February 2024).
Qualifications MBA, BMET, Faus IMM
Experience Mr Hunt was appointed Non-executive Chairman on 1 February 2024.
Mr Hunt has over 40 years’ experience in mining and metals. Mr Hunt has held senior positions
with BHP Iron Ore and from 1999 to 2005 was President of BHP Iron Ore with responsibility for
the expansion of its Pilbara Operations and development of relationships with Asian steel mills.
Mr Hunt was Managing Director and Chief Executive Officer for Lihir Gold Ltd and managed the
takeover process of Lihir by Newcrest Mining Limited. More recently, Mr Hunt has been Managing
Director and Chief Executive Officer of Broadspectrum (formerly Transfield Services) and
Chairman, Managing Director and Chief Executive Officer and Non-executive Director of AGL
Energy Ltd from September 2012 to 30 September 2022. He was appointed as Non-executive
Chairman of Aureka Limited on 1 January 2025.
Mr Hunt has significant experience in iron ore and steel, coal, manganese, aluminium, copper,
gold, uranium, electricity and gas and his management expertise spans steel production,
exploration, mining, logistics and port operations in Australia, South America, PNG and West and
Southern Africa.
Interest in shares, options
and performance rights
500,000 performance rights.
Directorships held in other
listedentitiesinlast3years
Non-executive Chairman of Aureka Limited from 1 January 2025.
PJ Bird Managing Director and Chief Executive Officer (appointed on 15 May 2025).
Qualifications Bachelor of Science (Honours), Geoscience Major, Botany & Economics
Experience Mr Bird was appointed Managing Director and Chief Executive Officer on 15 May 2025.
Mr Bird is a geologist with broad mining industry executive experience. Prior to joining AKORA
Peter was Executive General Manager at Rex Minerals where he played a key role in the
successful acquisition of Rex Minerals by Mach Metals. Peter’s prior roles include Executive
Chairman of Zenith Minerals Ltd, CEO of Asiamet Resources Limited, Non-Executive Chairman of
Excelsior Gold Limited and as joint founder and Managing Director of Heemskirk Consolidated
Limited prior to its takeover by a private equity group. Peter has extensive capital markets and
investor relations experience having held senior Investor Relations roles with Newcrest Mining
and Normandy Mining and as a Senior Analyst with Merrill Lynch Equities Australia. Peter is
currently Non-Executive Chairman of ASX listed base and precious metals explorer Cosmo
Metals Limited.
Interest in shares, options
and performance rights
Nil.
Directorships held in other
listedentitiesinlast3years
Non-executive Chairman Cosmo Metals Limited from 10 November 2021.
DIRECTORS’ REPORT
17
PG Bibby Managing Director and Chief Executive Officer (resigned 15 May 2025)
Qualifications Dip App Sc (Secondary Metallurgy), B App Sc (Metallurgy)
Experience Mr Bibby was appointed to the board of directors on 9 July 2015 and appointed CEO/Managing
Director on 1 January 2020 and resigned on 15 May 2025.
Mr Bibby is a metallurgist with over 35 years’ experience in both mining and metals industries. Mr
Bibby worked for 23 years with Rio Tinto Limited (formerly CRA Limited) in various operational,
technological, and business development roles.
With Rio Tinto, Mr Bibby held various operational roles at Rio Tinto Aluminium (formerly
Comalco), Kaltim Prima Coal and Rio Tinto Iron Ore (Hamersley Iron). At Rio Tinto Iron Ore, Mr
Bibby was manager of metallurgy at both Dampier and Paraburdoo.
Mr Bibby joined Zinifex Limited in 2004 as General Manager-Technology and then played a
leading role in the merging of Umicore and Zinifex smelting businesses to form Nyrstar and
became Chief Development Officer based in London.
On returning to Australia, Mr Bibby was appointed Managing Director of OceanaGold Corporation
and following OceanaGold, Mr Bibby performed various consulting roles.
Interest in shares, options
and performance rights
2,945,966 ordinary shares indirectly and 31,250 options over ordinary shares as at date of
resignation.
Directorships held in other
listedentitiesinlast3years
No other directorships in the past three years.
MD Gill Non-executive director (appointed 2 August 2023).
Qualifications B.Eng (Hons) (Mining) M.Eng Sc
Experience Mr Gill was appointed Non-executive Director on 2 August 2023.
Mr Gill has held senior roles in both Australian and international jurisdictions (Bolivia, Ghana,
India, PNG and USA) for Rio Tinto (Orissa Iron Ore), Castlemaine Goldfields, Western Mining
Corporation, Placer Pacific, Renison Goldfields, White Rock Minerals and LionGold Corporation.
Mr Gill has held exploration, technical and operating roles across a range of commodities,
including base, ferrous and precious metals as well as industrial minerals.
Mr Gill has extensive experience in safety, governance and risk management as well as
experience in capital markets. Mr Gill has overseen the completion of Resource Estimates and
led pre-feasibility and feasibility studies and has been instrumental in the project development,
establishment and operation of four mines in Australia and internationally.
Mr Gill is a fellow of the Australian Institute of Mining and Metallurgy and has completed the
Graduate course for the Australian Institute of Company Directors.
Interest in shares, options
and performance rights
200,000 ordinary shares.
Directorships held in other
listedentitiesinlast3years
Non-executive Director of Polymetals Resources Limited from 16 May 2023 to 18 July 2024.
DIRECTORS’ REPORT
18
Meetings of directors
Attendances by each director during the year were as follows:
Directors
Meetings
Audit & Risk
Committee
Meetings
No Attended No Attended
GP Hunt 11 11 2 2
PJ Bird 8 8 1 1
PG Bibby 4 4 1 1
MD Gill 11 11 2 2
SG Turner Company Secretary and Chief Financial Officer (appointed on 19 December 2023).
Qualifications BBus CA
Experience Mr Turner was appointed Company Secretary and Chief Financial Officer on 19 December 2023.
Mr Turner is a Chartered Accountant with over 39 years’ accounting and financial experience. Mr
Turner is an employee of accounting firm RSM Australia.
Mr Turner has served as a Non-Executive Director, Company Secretary and Chief Financial
Officer with Mozambique-focused heavy mineral sands company MRG Metals Ltd since 2011.
Interest in shares and
opt
Share your feedback
Discover