Green Steel FuturePresentation
Released
Released
Announcement PDF
DSO start-up to fund development to
feed the Green Steel Future
PEAK - Green Steel Webinar
May 2023
Disclaimer
Forward Looking and Competent Person Statement
This corporate presentation contains forward looking statements which constitute “forward looking information” within the meaning of securities legislation and “Forward Looking Statements”.
•
All statements included herein, other than statements of historical fact, are Forward Looking Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those reflected in the
Forward Looking Statements. The Forward Looking Statements in this corporate presentation may include, without limitation, statements about the company’s plans for its exploration projects and future exploration, evaluation and development including drilling
activities, quantification of mineral resources, feasibility studies, the construction and development of the Bekisopa Project, the company’s business strategy, plans and outlook; the merit of the company’s mineral properties; mineral exploration potential, timelines; the
future financial or operating performance of the company and cost guidance; expenditures; approvals and other matters.
•
Often, but not always, these Forward Looking Statements can be identified by the use of words such as “estimate”, “estimated”, “potential”, “planned”, “open”, “future”, “assumed”, “projected”, “calculated”, “used”, “detailed”, “has been”, “gain”, “upgraded”, “expected”,
“offset”, “limited”, “contained”,“reflecting”,“containing”,“conduct”,“increasing”,“remaining”,“to be”, “periodically”, or statements that events, “could” or“ should” occur or be achieved and similar expressions, including negative variations.
•
Forward Looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the company to be materially different from any results, performance or achievements expressed or
implied by the Forward Looking Statements. Such uncertainties and factors include, among others, changes in general economic conditions and financial markets; changes in commodity prices; technological and operational hazards in mine development activities;
risks inherent in mineral exploration; uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; construction delays, the timing and availability of financing; governmental and other approvals; political unrest or instability in
countries where IPR is active; labour relations issues; as well as those factors discussed under “Risk Factors” in the Company's Subscription Deed.
•
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in Forward Looking Statements, there may be other factors that cause actions, events or results to differ from
those anticipated, estimated or intended. Forward Looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to estimates of future exploration success; expectations on economic
viability of any mineral resource identified; expectations regarding future construction costs; expected trends in mineral prices and currency exchange rates; that the company’s activities will be in accordance with the company’s public statements and stated goals; that
there will be no material adverse change affecting the company or its properties; that all required approvals will be obtained; that there will be no significant disruptions affecting operations, including the development and construction of the Bekisopa Project or any
other project the Company seeks to advance, and such other assumptions as set out herein.
•
Forward Looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward Looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be
no assurance that Forward Looking Statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward Looking Statements. This
corporate presentation also refers to non-IFRS financial measures, such as future guesstimate of cash cost per tonne of processed ore and guesstimates of operating cash flow. These measures do not have a standardized meaning or method of calculation, even
though the descriptions of such measures may be similar.
Competent Person Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time employee of Vato Consulting LLC. Mr. Leeuwner is a registered
Professional Natural Scientist (Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific Professions (SACNASP). Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and
the activity being undertaken to qualify as a Competent Person as defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the 2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the information in this release in the form and context in which it appears.
The information in this report that relates to Mineral Processing and related scientific and technical information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a Metallurgist and Managing Director of Akora Resources Limited
(AKO), as such he is a shareholder in Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its processing under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters based on his information in the form and context in which it appears including
analytical, test data and mineral processing results.
The data in this report that relates to Mineral Resource Estimates and Exploration Targets for the Bekisopa deposits is based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who
has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Tear is a Director of H&S Consultants Pty Ltd and he consents to the inclusion in the report of the Mineral Resource in the form and context in which they appear.
2
AKORA Corporate Overview
AKORA Resources
Share Price (at 5-May-23)
ASX:AKO
Share Register Summary
Board &
Management
6%
$0.15
Trailing 12 Months Share Price
$0.35
$0.30
Shares Outstanding
77.1 million
$0.25
Market Capitalisation
$11.5 million
$0.20
Other
43%
$0.15
Top 20
ShareHolders
(excl.Mgmt)
51%
Major Shareholders
%
Evanachan Limited
10.7
Nicholas Axam
6.4
John Tumazos
5.1
Anderson Family Office
4.8
Baker Steel
3.8
Paul Bibby
3.2
Jordan Equities
3.0
Paul Bibby (MD)
John Madden
2.3
John Madden (Exec. Director & CFO)
$0.10
$0.05
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
22 22 22 22 22 22 22 22 22 23 23 23 23
Board of Directors
Commentary
Mike Stirzaker (Chair)
ex-PacRoad, RFC Group, HSBC, KPMG
23 years with Rio Tinto, ex-OceanaGold CEO
19 years with Rio Tinto, ex-ED Indophil
AKORA – Madagascar High-Grade Iron Ore
Trench 36 – High-Grade
Lump and Fines iron ore
Future
Project
Bekisopa
DSO Outcrop – ~66.7% iron ore
DSO Weathered Zone
BEKD17 - 66.1%Fe
Plan to develop Bekisopa in stages – First deliver High-Grade DSO
then a Premium Grade +68% Iron concentrate for Green Steel
4
Significant iron ore district – Bekisopa + Satrokala
Bekisopa
Widespread outcrop, 119 rock chips – averaged 66.7%Fe
Ground Magnetic Anomaly – 6 km strike length
Drilling intercepted large iron formation
Maiden Resource – 194.7 Million tonnes
Satrokala*
Satrokala
Unexplored tenements, known magnetic anomaly
66 rock chips – averaged 64.5%Fe
Potentially– 10 km anomaly
5km
40 kms closer to Toliara Port
Note * - Satrokala ASX Announcement 8 June 2022
Bekisopa Maiden Mineral Resource Bekisopa
Zone
194.7Mt
Tonnes
Mt
DTR
%
Concentrate
Grade
%Fe
Northern
43.3
43.3
68.2
Central
41.2
36.3
67
Southern
110.2
37.8
67.6
Total
(Inferred)
194.7
38.7
67.6
Bekisopa Geological Advantages
High Head Grade and Davis Tube Recovery, enables a low 2.5 mined tonnes / product tonne
Iron Concentrate Grade 67.6% Fe, at a coarse 75 microns, is better than Green Steel specification
Low Silica + Alumina impurity level at 2.4% is well under the 3.5% Green Steel specification
Note * - Refer to AKO-ASX Announcement 23 March and 11 April 2022 for complete Maiden Resource details and JORC Tables.
6
Geological Advantage
Weathered zone high grade iron ore
Lump product
+6.3mm to -32mm
Fines product
-6.3mm
67% Fe
64% Fe
High-Grade Direct Ship Ore is outcropping and at surface
Enables a Low capital / Low operating cost staged development
Reinvest to process iron ore to a +68% iron concentrate for Green Steel
7
AKORA – Investment Opportunity
Proving up a
Significant Resource
Geological Advantage
Green Steel Potential
➢ Maiden Resource – 194.7 MTonnes (drilled only 30% of the Bekisopa 6km strike)
➢ Exploration potential – 0.5 to 1 Billion Tonnes, just at Bekisopa
➢ +64% Iron ore, Lump and Fines (DSO)
➢ Bekisopa iron mineralization readily upgrades at coarser sizes
➢ +68% iron concentrate, importantly with very low impurities
➢ Solar powered production site
Geographical Advantage
➢ Close to rapidly growing Indian Iron & Steel Industry
➢ Close to Middle East, producing green DRI pellets
Experienced Management
➢ Significant achievements since listing in December 2020
➢ Success tied to AKORA – 6% share ownership
The key to achieving Green Steel is availability of
high grade iron with very low impurity levels
Today
2050
Global Emissions
~7%
Net Zero
Iron & Steel Making
70% by Blast Furnace, using
coal/coking coal
Electric Arc Furnaces from renewables,
Direct Reduced Iron Pellets
from natural gas/hydrogen
Iron Ore Grade
56 to 65% Fe Lump and Fines
>67%* Fe concentrate
Impurity Levels
6 to +8% SiO2 + Al2O3
<3.5%* (Ideally <2%*)
CO2 Emissions/t
Steel
~2t CO2
~0.2 to 0.6t CO2
AKORA’s very low impurity iron concentrate ideal for Green Steel
* - Midrex Steel – “The Iron Ore Challenge for Direct Reduction on Road to Carbon- Neutral Steelmaking” by C. Barrington June 2022
“Premium” Grade Iron concentrate with very low impurities
41%Fe
AKORA’s high +25% Fe grades
deliver
44%
70% Iron Concentrate
36%
with Ultra low impurity levels
0.5% SiO2, 0.7% Al2O3, 0.003%P & 0.004%S
35%
at 75-microns
AKORA is well placed to feed the Green Steel Future.
Quality, Location and Timing.
10
5 FOLD increase in demand for +67% Fe Concentrate
Expected by 2050
Source: Wood Mackenzie, AET-1.5
Significant Supply short fall forecast 2040 onwards
AKORA iron should be available at the right time
Transition to Green Steel gaining momentum
Climate change: green steel production requires multiple solutions, no ‘silver bullet’, report says
•Multiple technologies like carbon dioxide capture and energy-efficient iron ore reduction are being trialled amid decarbonisation efforts, according to McKinsey
•China’s steel industry has been experimenting with similar technologies to meet Beijing’s edict that it reach peak carbon emissions before 2030
Eric Ng, Business, Published: 3:30pm, 4 May, 2023
Brookfield Eyes $15 Billion Investment In Green Steel
By Irina Slav - May 02, 2023, 1:20 AM CDT
Germany fights to green production of most
important commodity
Bloomberg News | April 22, 2023 | 8:37
pm Intelligence Europe Iron Ore
Japan’s top steelmaker eyes $700 million ‘green
steel’ project
Bloomberg News | March 3, 2023 | 7:38
am Energy Asia Coal Iron Ore
Decarbonizing China's Steel Industry
By The Jamestown Foundation - Mar 20, 2023,
12:00 PM CDT
Geographical Advantage
Close to growing Indian and Middle East markets and into Asia.
Middle East
Producing
Green
DRI Pellets
India - Steel
Production to
double by 2030
from
133Mt to 255Mt.
~8100kms
AKORA Resource – AKO ASX
Iron feed for Green Steel
Source: https://www.cnbc.com/2021/10/25/blackrock-ceo-larry-fink-next-1000-unicorns-will-be-in-climate-tech.html 14
Share your feedback
Discover