AKORA’s Managing Director, Paul Bibby presents
at Mining Indaba.
AKORA Resources Limited (ASX: AKO) advises that Managing Director, Paul Bibby will present at
Mining Indaba. A copy of the presentation is attached.
Higher-grade iron ore for greener steel.
This announcement has been authorised by Akora Resources’ Board of Directors.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Gareth Quinn
Investor Relations
Phone +61(0) 417 711 108
gareth@republicpr.com.au
Higher-grade iron ore for greener steel
Akora Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa, Satrokala, Tratramarina and Ambodilafa Projects, all iron ore
prospects in Madagascar where the company holds 308km2 of tenements across these four
prospective exploration areas.
The Bekisopa Iron Ore Project is a high-grade iron ore project with an ~6km strike length and an
Inferred Resource of 194.7 million tonnes. Bekisopa has outcropping and weathered zone Direct
Shipping Ore (DSO) iron ore and the potential to produce a premium grade +68% iron
concentrate suitable for Direct Reduced Iron pellets for a green steel future.
2
Cleaner iron
ore for greener
steel.
Mining Indaba
February 2024
Paul Bibby
Managing Director
akoravy.com
ASX:AKO
Disclaimers
This corporate presentation contains forward looking statements which constitute “forward looking information” within
the meaning of securities legislation and “Forward Looking Statements”.
All statements included herein, other than statements of historical fact, are Forward Looking Statements and are subject to a
variety of known and unknown risks and uncertainties which could cause actual events or results to differ materially from those
reflected in the Forward Looking Statements. The Forward Looking Statements in this corporate presentation may include,
without limitation, statements about the company’s plans for its exploration projects and future exploration, evaluation and
development including drilling activities, quantification of mineral resources, feasibility studies, the construction and
development of the Bekisopa Project, the company’s business strategy, plans and outlook; the merit of the company’s mineral
properties; mineral exploration potential, timelines; the future financial or operating performance of the company and cost
guidance; expenditures; approvals and other matters.
Often, but not always, these Forward Looking Statements can be identified by the use of words such as “estimate”, “estimated”,
“potential”, “planned”, “open”, “future”, “assumed”, “projected”, “calculated”, “used”, “detailed”, “has been”, “gain”,
“upgraded”, “expected”, “offset”, “limited”, “contained”,“reflecting”,“containing”,“conduct”,“increasing”,“remaining”,“to be”,
“periodically”, or statements that events, “could” or“ should” occur or be achieved and similar expressions, including negative
variations.
Forward Looking Statements involve known and unknown risks, uncertainties and other factors which may cause the actual
results, performance or achievements of the company to be materially different from any results, performance or achievements
expressed or implied by the Forward Looking Statements. Such uncertainties and factors include, among others, changes in
general economic conditions and financial markets; changes in commodity prices; technological and operational hazards in
mine development activities; risks inherent in mineral exploration; uncertainties inherent in the estimation of mineral reserves,
mineral resources, and metal recoveries; construction delays, the timing and availability of financing; governmental and other
approvals; political unrest or instability in countries where IPR is active; labour relations issues; as well as those factors
discussed under “Risk Factors” in the Company's Subscription Deed.
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ
materially from those described in Forward Looking Statements, there may be other factors that cause actions, events or results
to differ from those anticipated, estimated or intended. Forward Looking Statements contained herein are based on the
assumptions, beliefs, expectations and opinions of management, including but not limited to estimates of future exploration
success; expectations on economic viability of any mineral resource identified; expectations regarding future construction
costs; expected trends in mineral prices and currency exchange rates; that the company’s activities will be in accordance with
the company’s public statements and stated goals; that there will be no material adverse change affecting the company or its
properties; that all required approvals will be obtained; that there will be no significant disruptions affecting operations, including
the development and construction of the Bekisopa Project or any other project the Company seeks to advance, and such other
assumptions as set out herein.
Cleaner iron ore
for greener steel
Forward Looking Statements are made as of the date hereof and the Company disclaims any obligation to update any Forward
Looking Statements, whether as a result of new information, future events or results or otherwise, except as required by law.
There can be no assurance that Forward Looking Statements will prove to be accurate, as actual results and future events could
differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward
Looking Statements. This corporate presentation also refers to non-IFRS financial measures, such as future guesstimate of cash
cost per tonne of processed ore and guesstimates of operating cash flow. These measures do not have a standardized meaning
or method of calculation, even though the descriptions of such measures may be similar.
Competent Person Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on information compiled by
Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time employee of Vato Consulting LLC. Mr. Leeuwner is a
registered Professional Natural Scientist (Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific
Professions (SACNASP). Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and the activity being undertaken to qualify as a Competent Person as defined in the Note for
Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the 2012 Edition of the ‘Australian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of
the information in this release in the form and context in which it appears.
The information in this report that relates to Mineral Resources for the South Bekisopa Iron Project as announced on the 10th
July 2023 is based on information prepared by Mr Richard Ellis BSc, MSc, MCSM, FGS, CGeol, EurGeol and is a full-time
employee of Wardell Armstrong International. Mr Ellis is a Chartered Geologist of the Geological Society of London and has
sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and to the activity
undertaken to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Ellis consents to the inclusion of the information in the release in
the form and context in which they appear.
The information in this report for the South Bekisopa Iron Project that relates to Mining and Financial Results of the updated
Scoping Study for the South Bekisopa Iron Project is based on information prepared by Mr Colin Davies (Mining Engineer) BEng,
MSc, CEng, ACSM, MIMMM, QMR who is a full-time employee of Wardell Armstrong International and Mr Winsor Lewis
(Financial Analyst) BSc, ARCS, Management Accountant who is a sub-consultant to Wardwell Armstrong International. Mr Colin
Davies is a Chartered Engineer of the Institute of Materials, Mineral and Mining UK, and Mr Winsor Lewis is a Management
Accountant. Mr Davies and Mr Lewis both consent to the inclusion of the information in the release in the form and context in
which they appear.
2
Cleaner iron ore
for greener steel.
Akora is developing a high-grade
iron ore mine in Madagascar to
serve the steel industry’s
accelerating decarbonisation.
Bekisopa Project
JORC Resource (Inferred)
Green Steel Resource (Inferred)
194.7Mt
34.0Mt
Direct Shipping Ore (DSO) Indicated
and Inferred Resource
Green steel potential
Average head grade 32% Fe
5.5Mt
@60.4% Fe
Average head grade 45.3% Fe
+68% Fe
Concentrate (with low impurities)
Cleaner iron ore
for greener steel
3
Our plan is to develop the
Bekisopa Project in two stages.
Stage 01
Stage 02
Mine, crush, and screen ore to produce 62%+ Fe lump and
fines product for shipping to blast furnace steelmakers.
Funds from Stage 1 to be used to add grinding and separation
circuits to upgrade DSO to +68% Fe with low impurities at 75
microns for shipping to Direct Reduce Iron steelmakers.
Produce +62% Fe direct shipping ore (DSO)
Cleaner iron ore
for greener steel
Produce premium-priced +68% Fe concentrate
4
Continued drilling success
at Bekisopa Project.
Shallow drilling has indicated
a significant iron ore body.
AKORA has drilled 250 holes
across four campaigns totalling
over 8,400m at Bekisopa.
Fourth drilling campaign of 904.9m across 65 holes completed in
August 2023.
Drilling on a 50m-by-50m grid across the project’s northern and
central zones, iron ore mineralisation intercepts averaged around
18.0m in the north, and 9.2m in the central tenement.
Drill campaigns designed to add DSO tonnage, aid production
planning, and increase mine life.
Only 30% of 6km major ground magnetic anomaly has been
drilled.
Cleaner iron ore
for greener steel
5
Bekisopa Scoping Study.
Low CAPEX Case highlights.
Robust DSO start-up
financials.
Drilling should add DSO
tonnes and mine life.
Annual production
Initial mine life
Revenue
Cash flow (pre-tax)
2Mt
5 years
US$545m
US$270m
Capital cost
NPV 10 (pre-tax)
IRR (pre-tax)
Capital payback
US$55.3m
$US125m
64%
2.1 years
C1 cash cost (FOB)
C1 margin per tonne
US$42/wmt 125%
Cleaner iron ore
for greener steel
6
Bekisopa Scoping Study.
Capital costs comparison.
Low OPEX Case
Low CAPEX Case
Area
Mining
Crushing and Screening
Mine site facilities
Solar power
Roads
Haulage
Port stockpile/loading and Facilities
Contingency (15 to 30%)
Government – social and community fund (3% Capital)
TOTAL $USm
C1 CASH COST (FOB)
US$42/tonne
‘Low CAPEX Case”
$US million
0.5*
4.2*
10.8
1.6
21.0
0*
4.8*
10.8
1.6
‘Low OPEX Case”
$US million
1.9*
17.5*
10.8
1.6
50.0
10.9
54.5
36.8
5.5
55.3
189.5
C1 CASH COST (FOB)
US$29/tonne
*Contractor operations
Cleaner iron ore
for greener steel
7
Bekisopa Scoping Study.
Cash flow and NPV sensitivity analysis
(at USD 100/t Benchmark Price).
Low CAPEX Case
US$M
NPV Sensitivity Analysis
250
Iron Ore Price
200
-10%
+10%
150
Opex
100
50
0
-50
-1
1
2
3
4
-100
Capital
Cash Flow
Cleaner iron ore
for greener steel
Cum. Cash Flow
+15%
-15%
Discount
12%
8%
Capex
+15%
-15%
5
US$M 75
100
125
150
175
8
A pit to port solution.
~360km from Bekisopa Project to Toliara.
Established infrastructure
Up to ~50km of road to be built or
upgraded between Bekisopa Project
and Satrokala Project.
RN7 Highway
Elevation Change - Satrokala to Toliara
2000
1000
0
0
Cleaner iron ore
for greener steel
50
100
150
200
250
300
350
9
The Madagascar advantage.
Madagascar can easily ship to
Asian steelmakers as well as
DRI pellet manufacturers
around the world.
01
02
03
04
Close to rapidly growing
Indian iron and steel industry.
Competitive shipping
distances to Asian steel
markets.
Cleaner iron ore
for greener steel
Close to DRI pellet
manufacturers in Middle
East and Europe.
Madagascar updated mining
code recently finalised.1
1AKO ASX announcement 24 August 2023.
10
Satrokala Project offers
considerable upside.
+60% Fe rock chips along
10km strike length.
A magnetic survey completed 8 November 2023 will assist in pinpointing
exploratory holes for maiden drilling proposed in Q2 2024.
68.03%Fe average
Cleaner iron ore
for greener steel
64.63%Fe average
11
Steel is critical to
decarbonise.
Steel demand is forecast to
grow to around 2.7 billion
tonnes by 2050*.
Crude Steel Production^
Mt
Actual (World Steel Association)
Forecast (BNEF)
2800
2400
The world’s electrification requires an enormous amount of steel.
Steel required for each
transmission tower
Steel required for each
new electric motor
vehicle
27t
900kg
Steel required for each
new wind turbine
Steel required for each
MW of solar power
280t
Cleaner iron ore
for greener steel
40t
2000
1600
1200
800
400
0
1960
1970
1980
*https://ieefa.org/articles/more-high-grade-iron-ore-needed-accelerate-steel-decarbonisation
^ World Steel Association – Figures for 1950 - 2022
1900
2000
2010
2020
2030
2040
2050
12
The steel industry
is turning green.
Map of planned or under construction DRI-EAF plants and capacity.
Million tonnes
To reach net zero emissions by
2050, steelmakers are now
switching production methods
from blast furnaces that consume
coal to direct reduced iron (DRI)
processes.
ThyssenKrupp, ArcelorMittal and BlueScope Steel have all
started to replace blast furnaces with DRI plants.
Cleaner iron ore
for greener steel
13
DRI technology reduces carbon
emissions significantly.
Traditional steelmaking
Iron ore +
Coking
Coal
Fossil fuel
electricity
Basic Oxygen
Furnace
Green steelmaking
High-grade Iron
ore pellets
Continuous
casting and
rolling
Renewablepowered
electrolysis
DR reactor
Blast
Furnace
CO2 per tonne of steel*
2 tonnes
Cleaner iron ore
for greener steel
Electric arc
furnace
Continuous
casting and
rolling
CO2 per tonne of steel*
0.1 tonnes
*Source: ”Hydrogen direct reduction (H-DR) in steel industry —An
overview of challenges and opportunities” Journal of Clean Production.
20 December 2021
14
DRI technology is
growing fast.
Bloomberg New Energy Finance
(BNEF) predicts DRI technology
to account for 59% of primary
steel production by 2050*.
BNEF Net Zero Scenario 2050*
Total steel production
2,747Mt
Total primary steel production
Steelmakers account for up to 11% of all global CO2 emissions!^
They will gradually have no choice but to respond to the increasing
cost of carbon and the requirement to reduce emissions.
1,513Mt
DRI steel production
889Mt
* Source: Institute for Energy Economics and Financial Analysis. Page 18, Iron ore Quality a Potential Headwind to
Green Steelmaking.
https://ieefa.org/sites/default/files/202206/Iron%20Ore%20Quality%20a%20Potential%20Headwind%20to%20Green%20Steelmaking_June%202022.pdf
^ Source: Global Efficiency Intelligence
https://www.globalefficiencyintel.com/new-blog/2021/global-steel-industrys-ghgemissions#:~:text=Based%20on%20the%20total%20steel,of%20total%20global%20CO2%20emissions .
Cleaner iron ore
for greener steel
15
DRI technology requires iron ore
with low impurities and grades
above 67% Fe.
BNEF Net Zero Scenario 2050*
DRI-grade iron ore demand 2050
889Mt
To produce 889Mt of steel from DRI
processes in 2050 will require a
tenfold increase in high-grade iron
ore supply.
Cleaner iron ore
for greener steel
*https://ieefa.org/articles/more-high-grade-ironore-needed-accelerate-steel-decarbonisation
DRI-grade iron ore supply 2020
89Mt
16
Bekisopa and Satrokala
projects (100% Akora).
A globally significant clean iron ore district.
Location
Growing JORC Resource
Cleaner iron ore
for greener steel
17
AKORA’s cleaner iron ore is
perfect for greener steel made
by DRI.
Bekisopa iron ore upgrades
to a +68% Fe concentrate at
75 microns.
Ultra low impurities
0.5% SiO2
0.7% Al2O3
0.003% P
0.004% S
Cleaner iron ore
for greener steel
A finer grind will deliver even
higher iron grades and much
lower impurity levels.
Our cleaner iron ore has been
proven to achieve 1.7 mined
tonnes to 1 mined tonne of
concentrate.
Less mined tonnes per tonne
of concentrate result in a lower
CAPEX and OPEX.
BEKD10
41% Fe head grade
44% Fe head grade
36% Fe head grade
35% Fe head grade
Bekisopa Drill Core BEKD10 upgrades to 70% Fe
concentrate at 75 microns!
18
Giving back to our
host communities.
Working together with local people
to deliver positive outcomes.
01
Frequent consultation
ensures support is strong for
our projects.
Cleaner iron ore
for greener steel
02
Knowledge transfer and
generating jobs for local
people are priorities.
03
Contributing educational
and medical supplies to local
villages.
04
Developing water
infrastructure to improve
health outcomes.
19
Board and
management.
A seasoned
mining team
with wide
experience in
Africa.
Graeme Hunt
Cleaner iron ore
for greener steel
Paul Bibby
Matthew Gill
Non-Executive Chairman
Managing Director
Non-Executive Director
Spent 34 years with Australian mining major BHP
performing General Manager roles before serving
as President Iron Ore between 1999 and 2005.
Was Managing Director and Chief Executive
Officer at Lihir Gold Ltd during which time he
managed the company’s takeover by Newcrest
Mining for A$9.5 billion. More recently he has held
MD and CEO positions with Broadspectrum and
AGL Energy. Management expertise spans steel
production, exploration, mining, logistics and port
operations across Australia, South America, PNG
and West and Southern Africa.
A metallurgist with over 35 years’ experience
across the mining and metals industry. Spent 23
years with Rio Tinto in various operational,
technological and business development roles.
Appointed Chief Executive Officer of OceanaGold
Corporation in 2009 and was instrumental in its
equity raising activities in Europe and North
America to improve its balance sheet and
advance gold projects. In recent years, he has
performed a number of “work-out” roles for
Australian listed entities which involved various
asset sales and reorganisations.
A mining engineer with over 40 years’ experience.
Held various key roles in both national and
international jurisdictions for organisations such
as Rio Tinto, Castlemaine Goldfields, WMC, Placer
Pacific, Renison Goldfields and Singapore-listed
LionGold Corp. Overseen the completion of
several Maiden Resource Estimates, has
successfully led Pre-Feasibility Studies and
Feasibility Studies and has been instrumental in
the project development, establishment and
operation of four mines, in Australia and
internationally.
20
Corporate Snapshot
ASX:AKO
Share price
Market capitalisation
Debt
Shares on issue
Cash
AKOO options
$A0.14
A$11.9m
Zero
94.9m
A$1.3m
7.2m
31 January 2024
52 week high $0.225, low $0.125
31 January 2024
30 September 2023
14 November 2023
31 December 2023
Expiring 25 May 2026
Ownership
ASX Share price performance ($A)
0.22
61% Top 20 shareholders
0.20
0.18
38% Other
0.16
0.14
9.6% Futureworld Management
0.12
| Feb 2023
| May
| July
Cleaner iron ore
for greener steel
| Sept
| Nov
Jan 2024
3.25% Directors & Management
21
“Companies that have
a market valuation over
a billion dollars – won’t
be a search engine,
won’t be a media
company, they’ll be
businesses developing
green hydrogen, green
agriculture, green steel
and green cement.”
Larry Fink
BlackRock CEO
Source: https://www.cnbc.com/2021/10/25/blackrock-ceo-larry-fink-next1000-unicorns-will-be-in-climate-tech.html
Cleaner iron ore
for greener steel
22
Contact us
Paul Bibby
Managing Director
paul.bibby@akoravy.com
AKORA Resources Ltd
ACN 139 847 555
ASX: AKO
12 Anderson Street West,
Ballarat
Victoria 3350.
eNews
Join the conversation
@AkoraResources
Follow us
linkedin.com/company/
akora-resources
Subscribe to our e-news:
akoravy.com
Share your feedback
Discover