2021 Bekisopa Drilling Programme Update
Released
Released
Announcement PDF
20 July 2021
The Manager
Company Announcements Office
ASX Limited
Level 4
Exchange Centre
20 Bridges Street
Sydney NSW 2000
Dear Sir
2021 BEKISOPA DRILLING PROGRAMME UPDATE
Pursuant to the requirements of Listing Rules, please find attachED an announcement authorised by
the AKORA board of directors.
Yours faithfully
JM Madden
Company Secretary
For further information please contact:
PG Bibby
Phone 61(0) 419 449 833
www.akoravy.com
2021 Drilling Campaign continues to enhance
the potential of Bekisopa as a significant iron project
Highlights
•
Drill results indicate extension to known Bekisopa iron ore mineralisation
strike
•
Shows Iron Mineralisation continues in both North and South Zones
•
10 shallow drill holes, for ~700m, completed with 8 holes intercepting iron
mineralisation
•
46 metre iron mineralisation intercepts with true width of plus 250 metres
•
BEKD14 open at depth finishing in mineralisation at the end of the 107m
drill hole
•
Massive and Coarse disseminated iron mineralisation observed within all
intercepts
•
Excellent drill core recoveries averaging 96%
•
Drill core from the first 6 holes delivered to the Antananarivo preparation
lab on 8 July 2021 in accordance with schedule
• Drilling further confirms the extent of iron mineralisation and
potential for a significant resource at Bekisopa
1|Page
AKORA Resources Limited (ASX: AKO, AKORA, the Company) is pleased to report on further results
obtained from the 2021 drilling campaign at its flagship Bekisopa Iron Ore Project, in Madagascar.
This first phase of 2021 drilling covers 10 drill holes, confirms the extension of the known iron ore
mineralisation along strike and at depth.
Over the coming months there is additional drilling to complete, another 30 drill holes for approximately
4,000 metres, as AKORA moves to define a JORC compliant resource at its flagship Bekisopa project.
The drill rig and camp Mobilisation commenced on May 30th for the 2021 Bekisopa drilling campaign,
the camp was established, see Figure 1, and drilling commenced on June 13th. The initial focus for
the drilling has been a series of shallow holes completed at depths of 30m to 107m in the southern
zone, around the 2020 BEKD09, 10 and 11 drill holes, and in the northern zones, along strike from the
2020 BEKD01 drill hole, on the main Bekisopa 6km strike length.
Figure 1
Bekisopa Camp
The iron mineralisation observed in the drill core from the first sequence of holes contains what
appears to be high-grade massive laterite mineralisation is the near surface intercepts and extensive
lengths of high-grade massive mineralisation at depth, see Figure 2 and Appendix.
BEKD13
BEKD14
Figure 2
Weathered Massive iron mineralisation near surface, 12.1 to 15m, in BEKD13 and clean high-grade massive
mineralisation at depth of 92.35 to 95.35m in BEKD14.
If the on-site logging and magnetic susceptibility readings are an indicator of iron content then expectation is for very
high iron contents.
2|Page
Figure 3 shows the location of the first 10 2021 drill holes with their iron intercepts noted, with the
full details for these drill holes shown in Table 1 of the Appendix.
Tenement 3757
BEKD22
BEKD21
BEKD20
BEKD19
BEKD17
Tenement 10430
BEKD18
BEKD13 and 14
BEKD15 and 16
Figure 3
2021 Bekisopa drilling campaign drill hole location plan,
showing the first 10 drill holes with their iron intercepts.
Drilling commenced in the southern zone around the successful 2020 BEKD09, 10 and 11 drill holes
(see ASX Announcements dated 13 April 2021 and 27 April 2021) and has continued to confirm iron
mineralisation in all 6 shallow drill holes completed, BEKD13 to 18.
As expected, the iron
mineralisation continues shallowly to the east and more importantly, continues at depth and with
substantial thickness in the west, refer Figure 4.
3|Page
Drill hole BEKD14 positioned west of the 2020 southern drill holes has confirmed both the continuation
of the iron mineralisation to the west and that it dips at depth to the west. BEKD14 finished in
mineralisation when the drill hole had to be stopped at a depth of 107.35m, see figure 5, this continues
to be very encouraging for the development of a significant resource tonnage.
Figure 4
Bekisopa 2021 drill holes BEKD13 and BEKD14 both intersected iron mineralisation. BEKD13 to the east of the 2021
southern drill holes, BEKD09,10 and 11, confirmed continuation of weathered iron mineralisation from surface while
BEKD14 to the west shows the iron mineralisation to be dipping to the west and the drill was still in mineralisation at
the completion of the hole at 107.3m. Total true mineralisation width of plus 250 metres.
Figure 5
Drill rig completing Bekisopa drill hole BEKD14 which finished in iron mineralisation at 107.3m
Drill holes BEKD19 to 22 are in the northern zone and on the eastern extent of the expected iron
mineralisation zone. Drill holes BEKD19 and 20 intersected iron mineralisation from surface. BEKD21
and BEKD22 did not intersect mineralisation these tested the eastern extent of the mineralisation and
confirmed our interpretation of the mineralisation boundary to the east.
4|Page
Conclusion
The 2021 Bekisopa drilling campaign for 4000 plus metres has commenced safely and successfully
with iron mineralisation intercepts as expected for these initial shallow drill holes. The drill core shows
what appears to be high-grade iron mineralisation near surface, weathered laterite iron, with extensive
high-grade massive iron at depth so far down to 107.3m.
The drill core samples for the first six southern drill holes, 384 samples, arrived at the Antananarivo
laboratory on Thursday July 8th on schedule. These core samples will be prepared for both assay
pulps and 2mm process trials and will be ready for dispatch by the week ending July 23rd and will then
be sent to the ALS Perth laboratory for analysis.
The attached Appendix contains drill core photos from the first nine drill holes BEKD13 to 21. These
show drill core with massive weathered / laterite, massive and coarse disseminated iron mineralisation.
Our initial interpretation and the on-site logging is that drill core will generate comparable iron assays
and product grade process trial results to those achieved from 2020 Bekisopa drill core.
These results will be continually reported on over the coming months leading to reporting of the
Bekisopa JORC compliant resource by the end of the year assuming the drilling equipment, sample
preparation, international logistics and resource estimation continues to plan.
Bekisopa Drilling – July and August
Drilling over the rest of July and into August will continue with the remaining shallow drill holes in the
north and southwest. On completion of these the drillers new larger rig will be at Bekisopa and
commence drilling the deeper 150 to 250m holes to confirm iron mineralisation at depth giving further
volume for the development of the Bekisopa JORC resource. The drilling campaign will move onto 24
hours a day with the arrival of the larger drill rig to ensure completion of the 4000+ metre drilling in
October.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About AKORA Resources
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and development
of the Bekisopa Project, the Tratramarina Project and the Ambodilafa Project, iron ore projects in
Madagascar, in all totaling some 308 km2 of tenements across these three prospective exploration areas.
Bekisopa Iron Ore Project is a high-grade magnetite iron ore project of >4km strike and is the key focus of
current exploration drilling and resource modelling.
5|Page
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related
scientific and technical information, is based on and fairly represents information compiled by Mr
Antony Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He is a
shareholder in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years
prior to being engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of Mining
and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG). Mr
Truelove has sufficient experience which is relevant to the styles of mineralisation and types of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the
matters based on his information in the form and context in which it appears including sampling,
analytical and test data underlying the results.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Directors of Akora Resources Limited (AKO), as such he is a shareholder
in Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and
its processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and
mineral processing results.
6|Page
Appendix 1
Bekisopa 2021 drilling campaign details, site photos and drill core iron mineralisation photos from
BEKD13 to BEKD22, the first batch of shallow drill holes completed by 13 July 2021, are contained in
this Appendix.
Hole
ID,
BEKD
Utm38sX*
Utm38sY*
Azm
Degrees
Incline
Degrees
Length
m
TCR
%
13
586,902
7,608,150
90
-60
30.30
93
14
586,650
7,608,151
90
-60
107.35
97
15
586,900
7,607,999
90
-60
30.23
88
16
586,799
7,608,001
90
-60
70.30
98
17
587,102
7,608,302
90
-60
50.24
95
18
587,109
760,451
90
-60
50.24
99
19
586,098
7,612,100
90
-60
80.32
98
20
586,001
7,612,299
90
-60
80.32
98
21
22
585,903
7,612,499
90
90
-60
-60
80.30
80.24
95
97
From
m
To
m
Length
m
Mineralisation
0.00
14.65
0.00
61.55
0.00
5.63
0.00
12.70
0.00
5.21
0.00
3.05
0.00
35.32
0.00
44.67
0
0
14.65
30.30
61.55
107.35
5.63
30.23
12.70
70.30
5.21
50.24
3.05
50.24
35.32
80.32
44.67
80.32
80.3
80.24
14.65
15.65
61.55
45.80
5.63
24.60
12.70
57.60
5.21
45.03
3.05
47.19
35.32
45.00
44.67
35.65
80.3
80.24
Iron
Gneiss
Gneiss
Iron
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Gneiss
Gneiss
Table 1
Drill hole locations and initial results for the first 10 holes in the Bekisopa 2021 Drilling Campaign.
Core Shed
QA/QC on Drill Core
Improved drill core shed facility at the Bekisopa camp to ensure a more efficient processing of
core for all Quality Assurance and Quality Control procedures and sample preparation.
7|Page
BEKD13
Weathered iron mineralisation
BEKD13
at 10.34m, massive mineralisation
BEKD14
at 86 metres massive mineralisation
BEKD14
93 to 94 metres massive mineralisation
Drilling at BEKD15
Note the large high-grade iron outcropping rocks
8|Page
BEKD14
massive mineralisation
BEKD13
0 to 3.5 metres Weathered Massive Iron Mineralisation
BEKD13
12.1 to 15 metres Weathered Massive Iron Mineralisation
BEKD14
63.8 to 65.75 metres Massive Iron Mineralisation
BEKD14
92.3 to 95.35 metres Massive Iron Mineralisation
9|Page
Drill core BEKD13 above shows weathered iron mineralisation, which contains both hematite
and magnetite mineralisation, and appears from the on-site logging and magnetic susceptibility
readings to have a high-grade iron content. Then the massive iron mineralisation in BEKD14
from 92.3 to 95.35m looks to be clean high-grade iron content drill core.
BEKD15
0 to 3.4 metres Weathered Massive Iron Mineralisation
BEKD16
1.3 to 4.5 metres Weathered Coarse Disseminated Iron Mineralisation
10 | P a g e
BEKD17
0 to 3.4 metres Weathered Massive Iron Mineralisation
BEKD18
0 to 1.4 metres Weathered Massive Iron Mineralisation
Drill core from near surface weathered iron mineralisation for BEKD15, 16, 17, and 18 above
appears from their on-site logging and magnetic susceptibility readings to have a high-grade iron
content.
BEKD19
0 to 3 metres Weathered Massive Iron Mineralisation
11 | P a g e
BEKD19
11.5 to 14.5 metres Coarse Disseminated Iron Mineralisation
BEKD19
32.7 to 34.4 metres Massive to Coarse Disseminated Iron Mineralisation
BEKD20
0 to 3 metres Weathered Coarse Disseminated Iron Mineralisation
Drill core BEKD19 above shows weathered iron mineralisation near surface that transitions to
coarse disseminated then to more massive iron mineralisation type. Comparing the on-site logging
and the magnetic susceptibility readings of these drill core sections to those from the 2020 Bekisopa
drilling programme suggests that they are likely to have a high-grade iron content. Near surface
drill core from BEKD20 above looks to be a combination of weathered and coarse disseminated iron
mineralisation types.
12 | P a g e
BEKD20
18.7 to 21.6 metres Massive and Coarse Disseminated Iron Mineralisation
BEKD20
40.87 to 43.7 metres Massive Iron Mineralisation
Drill core BEKD20 above shows what appears to be, from the on-site logging and magnetic
susceptibility readings, high-grade massive iron mineralisation in drill core down to 43.7m.
If the mineralisation types and the on-site logging and magnetic susceptibility readings are an indicator
of iron content, as they appear to be in the 2020 Bekisopa drill core, then the expectation is for high
iron grades in these first 8 drill hole mineralisation intercepts.
13 | P a g e
BEKISOPA PROJECT
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
14 | P a g e
JORC Code explanation
• Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
Commentary
• Diamond core (HQ or NTW) is split in half using a core saw or splitter (if clayey or
rubbly). A consistent half of the core is broken with a hammer and bagged prior to
dispatch to the preparation laboratory in Antananarivo. Sample interval is
nominally 1m down hole but with samples terminated at lithological boundaries.
• All drilling is diamond core drilling using either NTW (64.2mm inner diameter) or
HQ (77.8mm inner diameter) coring equipment. The holes are generally collared
using HQ and changed to NTW between 3m and 25m downhole. Core is not
orientated. All drillholes are surveyed every 10m using a Reflex EZ-Gyro
gyroscopic multi-shot camera. No surveys to date have varied more than 5° from
the collar survey in either azimuth or declination.
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
15 | P a g e
JORC Code explanation
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Commentary
• Average core recovery is 97% but may be lower in the rubbly part of the
weathered zone. Several one metre intervals returned low recoveries including
BEKD21: 14.5m to 15.5m (15%), BEKD15: 19.2m to 21.2m (25%), BEKD14: 4.4
to 5.4m (31%) and BEKD14: 17.4m to 18.4m (48%). All other intervals gave good
recovery, with close to 100% in fresh rock.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were adhered to at all times.
• All core was fitted together so that a consistent half core could be collected,
marked up with a “top” line (line perpendicular to dip and strike, or main foliation),
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were adhered to at all times.
• During drilling, checks and verifications of the accurate measurement of
penetration depth of drill hole cores were made and observations and recording of
the colour of the water / mud rising from the drill hole were made.
• All drill core was logged quantitatively using industry standard practice on site in
enough detail to allow mineral resource estimates as required.
• Logging included: core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally magnetite or
hematite), mineralisation style, mineralisation %, structure, magnetic susceptibility
(see below), pXRF readings (see below), notes (longhand).
• All core was photographed both wet and dry and as both whole and half core.
• All core was geotechnically logged and RQD’s calculated for every sample
interval.
• All drill-holes were logged using a magnetic susceptibility meter to enable
accurate distinction of iron (magnetite) rich units and to potentially differentiate
between magnetite and hematite rich mineralisation.
• Density measurements were made using both the Archimedes method (mainly
fresh rock) and the Caliper Vernier (mainly regolith) methods.
Criteria
JORC Code explanation
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg
16 | P a g e
Commentary
sample intervals decided and marked up and the core subsequently split in half
using a core saw, separating samples into the marked-up intervals. If the core
was clayey or rubbly, it was split in half using a hammer and chisel. The intervals
were nominally 1m but smaller intervals were marked if a change in geology
occurred within the 1m interval.
• The half core sample intervals were put into polythene bags along with a paper
sample tag. This was then sealed using a cable tie and placed into a second
polythene bag with a second paper tag and this was sealed using staples.
• The samples were subsequently transferred at regular intervals to the sample
preparation facility in Antananarivo (OMNIS) where they will undergo the following
preparation:
o Sorting and weighing of samples
o Drying at 110-120°C until totally dry
o Weighing after drying
o Jaw crushing to 2mm
o Riffle split and keep half as a reference sample
o Collect a 100g sub-sample of 80% passing 2mm material and stored
o Pulverise to minus 75 micrometres
o Clean ring mill using air and silica chips
o Riffle split and sub-sample 2 sets of 100g pulps
o Store reject pulp
o Conduct a pXRF reading on the minus 75 micrometre pulp
o Weigh each of the sub-samples (minus 2mm, 2 x minus 75
micrometres) and store in separate boxes for ready recovery as
needed
• No assaying has been undertaken as yet on the drillholes being reported.
Criteria
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
17 | P a g e
JORC Code explanation
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
• The measures taken to ensure sample security.
Commentary
• As assaying has not yet been undertaken, only qualitative descriptions and
magnetic susceptibility readings are reported.
•
•
•
All drill hole collars have been accurately pegged using a DGPS. Final collars will
be picked up at completion of the drilling program.
The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
Topographic control is country wide data only. An accurate topographic survey
will be undertaken prior to any resource estimation.
• Data spacing is planned to be at 200m x 50m drill spacing which is considered
reasonable for the style of mineralisation being intersected.
• All samples will be assayed as individual, less than 1m long intervals. Composites
of selected intervals will be tested using wet and dry, low intensity magnetic
separation (LIMS).
• The ironstone unit has a strong north-south trend and drilling is oriented to the
east. The outcrops, trenches and magnetics all show a steep to shallow westerly
dip and hence the drill direction is considered to be optimal. The drilling in the
south was interpreted as being synclinal in nature with tonnage potential limited to
the keel of the syncline. However, it has been found that the structure in an
orocline and that mineralisation continues at depth in this area.
• No sample bias is evident.
• Chain of Custody procedures are implemented to document the possession of the
samples from collection through to storage, customs, export, analysis and
Criteria
JORC Code explanation
Commentary
reporting of results. Chain of custody forms are a permanent records of sample
handling and off-site dispatch.
• The on-site Geologist is responsible for the care and security of the samples from
the sample collection to the export stage. Samples prepared during the day are
stored in the preparation facility in labelled sealed plastic bags.
• The Chain of Custody form contains the following information:
• Sample identification numbers;
• Type of sample;
• Date of sampling;
• List of analyses required;
• Customs approval;
• Waybill number;
• Name and signature of sampling personnel;
• Transfer of custody acknowledgement.
• Samples are delivered to the analytical laboratory by courier. A copy of the Chain
of Custody form is signed and dated and placed in a sealable plastic bag taped on
top of the lid of the sample box. Each sample batch is accompanied by a Chain of
Custody form.
• One box of samples was incorrectly sent to ALS Ireland and one to ALS Perth
rather than the other way around. The laboratory subsequently sent the one box
from Ireland to Perth and the box incorrectly sent to Perth was assayed in Perth.
No tampering of either of these boxes was observed.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• No audit has been conducted.
18 | P a g e
BEKISOPA PROJECT
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Mineral
tenement
and land
tenure
status
JORC Code explanation
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Commentary
• The Company completed negotiations on August 5th 2020 to acquire the remaining
25% of the Bekisopa tenements from Cline Mining and on completion of the transfer
of shares AKO will hold 100% of the Bekisopa tenements.
• The Akora Iron Ore projects consist of 12 exploration permits in three
geographically distinct areas, and their current good standing (as provided by AKO)
is seen in Table 3.1 below. A legal report has been prepared for Akora.
Table Error! No text of specified style in document..1: Licence Details
Num
Per
ber
Project
Tenement
Permi
mit
Granting
of
ID
Holders
t ID
Typ
Date
Block
e
s
23/09/20
UEM
16635
PR
144
05
23/09/20
UEM
16637
PR
48
05
Tratram
10/11/20
arina
UEM
17245
PR
160
05
RAKOTOA
11/01/20
RISOA
18379
PRE
16
06
RAKOTOA
18/11/20
RISOA
18891
PRE
48
05
Ambodi
lafa
Bekisop
a
•
19 | P a g e
Expiry
Date
Submis
sion
Date
22/09/2
015
23/09/2
015
09/11/2
015
11/01/2
014
17/11/2
013
04/09/2
015
04/09/2
015
04/09/2
015
27/03/2
012
27/03/2
012
19/05/2
013
14/10/2
014
08/03/2
013
07/08/2
014
Actual Status
Last
Payment
of
Administr
ation Fees
under renewal process
2018
under renewal process
2018
under renewal process
under transformation to
PR
under transformation to
PR
2018
under renewal process
2018
2018
27/03/2
018
27/03/2
018
2018
27/03/2
018
28/03/2
019
2018
2018
MRM
6595
PR
98
MRM
13011
PR
33
20/05/20
03
15/10/20
04
MRM
21910
PR
3
23/09/20
05
22/09/2
015
12/07/2
015
under renewal process
under substance
extension and renewal
process
10430
PR
64
under renewal process
2019
PR
768
relinquished
2016
35828
PR
80
relinquished
2018
27211
PR
128
under renewal process
2018
35827
PR
32
PRE
16
under renewal process
Transfer from IOCM
Gerant to AKO
2018
3757
03/03/2
014
03/02/2
019
03/02/2
019
23/01/2
017
23/01/2
017
25/11/2
019
28/11/2
013
26532
04/03/20
04
16/10/20
07
16/10/20
07
16/10/20
07
23/01/20
07
26/03/20
01
IOCM
RAZAFIND
RAVOLA
20/01/2
017
20/01/2
017
2019
Date of
last
Payme
nt
27/03/2
018
27/03/2
018
27/03/2
018
27/03/2
018
27/03/2
018
27/03/2
018
27/03/2
018
27/03/2
018
28/03/2
019
Criteria
Exploration
done by
other parties
Geology
20 | P a g e
JORC Code explanation
Commentary
• Acknowledgment and appraisal of exploration
• Exploration has been conducted by UNDP (1976 - 78) and BRGM (1958 - 62). Final
by other parties.
reports on both episodes of work are available and have been utilised in the recent
IGR included in the Akora prospectus. Airborne magnetics was flown for the
government by Fugro and has since been obtained, modelled and interpreted by
Cline Mining and Akora.
• Deposit type, geological setting and style of
• The tenure was acquired by AKO during 2014 and work since then has consisted
mineralisation.
of:
o Data compilation and interpretation;
o Confirmatory rock chip sampling (118 samples) and mapping;
o Re-interpretation of airborne geophysical data;
o Ground magnetic surveying (305 line kilometres);
o The 2020 drilling programme of 1095.5m diamond core drilling in 12 drillholes.
o The current programme that to date includes 579.6m in 9 drillholes
(BEKD1