Akora Presents at MiningNews Select Sydney Conference
Released
Released
Announcement PDF
1
ASX RELEASE 11 March 2026
AKORA Presents at MiningNews Select Conference
The Company is pleased to advise Managing Director and Chief Executive Officer, Peter Bird, will
present at the MiningNews Select in Sydney today.
The presentation will be delivered at the Sydney Masonic Centre from 12:05 to 12:20 on
Wednesday 11 March 2026.
The presentation materials are attached.
This announcement has been authorised by AKORA Resources Limited’s Board of Directors.
For further information please contact:
Peter Bird
Managing Director
E: info@akoravy.com
www.akoravy.com
info@akoravy.com
ACN 139 847 555
ASX: AKO
www.akoravy.com
Akora Resources Limited
PO Box 28
Ballarat Victoria 3350
Australia
2
Cleaner iron ore for greener steel
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development of four
high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (Mt) Inferred JORC Resource
(ASX Announcement 11 April 2022) with very low impurities able to produce a premium-priced +67% Fe
concentrate. Direct Reduced Iron-Electric Arc Furnace technology which is used to make greener steel
without coal and considerably less carbon emissions requires iron ore grades of at least 67%.
(ASX Announcement – Bekisopa Scoping Study, 14 November 2023)
To generate cash in the near-term, AKORA is advancing plans at Bekisopa for a Stage1, 2Mt per annum
Mine with a six year life of mine, producing 61.6% Fe average grade lump and fine direct shipping ore
(DSO) for shipping to Blast Furnace steelmakers.
(ASX Announcement - Bekisopa Pre Feasibility Study, 31 March 2025)
The Company confirms that it is not aware of any new information or data that materially affects the above and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have
not materially changed.
And further the Company confirms that all material assumptions underpinning the 2Mt per annum production target continue to apply
and have not materially changed.
Peter Bird
Managing Director
www.akoravy.com
ASX:AKO 10-11 March 2026
Near Term DSO to
Decades of Clean
Steel Supply
2
Cleaner iron ore for greener steel
Disclaimers
The informationin this Presentation is of a general nature and does not purport to be complete nor does it contain all the informationwhich a
prospective investor may require in evaluatinga possible investmentin the Companyor that would be required in a prospectus or other
disclosure documentprepared in accordance with the requirementsof the CorporationsAct 2001(Cth) (CorporationsAct). The
Presentation is not a prospectus, disclosure document, product disclosure statement or other offering document under Australianlaw or
under any other law. This Presentation has not been filed, registered or approved in any jurisdiction.
The informationcontained in this Presentation is not investment, financial productadvice or recommendation to acquire Shares. This
Presentation has been prepared withouttaking into account your investment objectives, financialsituation or any other particular needs
This Presentation does not and will not form any partof any contract for the acquisition of shares. Each recipient of this Presentation should
make its own enquiriesand investigationsregardingall informationin this Presentation. Before makingan investment decision, you should
consider whether it is a suitable investment for you in light of your own investmentobjectives, financialsituation and particular needs and
havingregard to the merits or risks involved. Independentfinancialadvice is recommended.
This presentation does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in any jurisdiction.The distributionof
this presentation and the offer of securities is restricted in jurisdictionsoutside Australia. In particular, this presentation may not be
released to US wire services or distributedin the United States. This presentation does not constitute an offer to sell, or the solicitation of an
offer to buy, any securities in the United States or any jurisdictionin which such an offer would be illegal. The securities described in this
presentation have not been, and will not be, registered under the US Securities Act of 1933or the securities laws of any state or other
jurisdictionof the United States. Accordingly, the securities described in this presentation may not be offered or sold in the United States
except in transactionsexempt from, or not subject to, the registration requirementsof the US Securities Act and applicable US state
securities laws.
All statements included herein, other than statements of historical fact, are Forward Looking Statementsand are subject to a variety of
known and unknown risks and uncertaintieswhich could cause actual events or results to differ materially from those reflected in the
Forward Looking Statements. The Forward Looking Statementsin this corporate presentation may include, withoutlimitation, statements
about the company’splans for its exploration projects and future exploration, evaluation and development includingdrilling activities,
quantificationof mineralresources, feasibility studies, the construction and development of the Bekisopa Project, the company’s business
strategy, plans and outlook; the merit of the company’smineral properties; mineral exploration potential, timelines; the futurefinancialor
operating performanceof the companyand cost guidance; expenditures; approvals and other matters.
Often, but not always, these Forward Looking Statementscan be identifiedby the use of words such as “estimate”, “estimated”,
“potential”, “planned”, “open”, “future”, “assumed”, “projected”, “calculated”, “used”, “detailed”, “has been”, “gain”, “upgraded”,
“expected”, “offset”, “limited”, “contained”,“reflecting”,“containing”,“conduct”,“increasing”,“remaining”,“to be”, “periodically”, or
statements thatevents, “could” or“ should” occur or be achieved and similar expressions, includingnegative variations.
Forward Looking Statementsinvolve known and unknown risks, uncertaintiesand other factors which may cause the actual results,
performanceor achievements of the company to be materially different from any results, performanceor achievements expressed or
implied by the Forward Looking Statements.Such uncertaintiesand factors include, amongothers, changes in general economic conditions
and financialmarkets; changes in commodity prices; technological and operational hazardsin mine development activities; risks inherentin
mineral exploration; uncertaintiesinherent in the estimation of mineralreserves, mineralresources, and metal recoveries; construction
delays, the timingand availabilityof financing;governmental and other approvals; political unrest or instabilityin countries where IPR is
active; labour relations issues; as well as those factors discussed under “Risk Factors”.
Although the Companyhas attempted to identifyimportantfactors that could cause actual actions, events or results to differ materially
from those described in Forward Looking Statements, there may be other factors that cause actions, events or results to differ from those
anticipated,estimated or intended. Forward Looking Statementscontained herein are based on the assumptions, beliefs, expectations and
opinions of management, includingbut not limited to estimates of future exploration success; expectationson economic viability of any
mineral resource identified;expectationsregarding future construction costs; expected trends in mineral prices and currency exchange
rates; thatthe company’s activities will be in accordance with the company’spublic statementsand stated goals; that there will be no
materialadverse change affecting the company or its properties; that all required approvals will be obtained; thatthere will be no significant
disruptionsaffecting operations, includingthe development and construction of the Bekisopa Project or any other project the Company
seeks to advance, and such other assumptionsas set out herein.
Forward Looking Statementsare made as of the date hereof and the Companydisclaims any obligation to updateany Forward Looking
Statements, whether as a result of new information,future events or results or otherwise, except as required by law. There can be no
assurance thatForward Looking Statementswill prove to be accurate, as actual results and future events could differ materially from those
anticipatedin such statements. Accordingly, investors should not place unduereliance on Forward Looking Statements.This corporate
presentation also refers to non-IFRS financialmeasures, such as future guesstimate of cash cost per tonne of processed ore and
guesstimates of operatingcash flow. These measures do not have a standardizedmeaningor method of calculation, even though the
descriptions of such measures may be similar.
Competent Person Statement
The informationin this Presentation that relates to Exploration Targets and Exploration Results is based on informationcompiled by Mr
JannieLeeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time employee of Vato Consulting LLC. Mr. Leeuwner is a registered
Professional Natural Scientist(Pr.Sci.Nat. - 400155/13)with the South African Council for Natural ScientificProfessions (SACNASP). Mr.
Leeuwner has sufficientexperience which is relevant to the style of mineralisation and type of deposits under consideration and the activity
being undertaken to qualifyas a Competent Person as defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock
Exchange and the 2012Edition of the ‘AustralianCode for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC
Code). Mr. Leeuwner consents to the inclusion of the informationin this release in the form and context in which it appears.
The informationin this Presentation that relates to Mineral Resources for the South Bekisopa Iron Project as announcedon the 11th July
2023is based on informationprepared by Mr Richard Ellis BSc, MSc, MCSM, FGS, CGeol, EurGeol and is a full-time employee of Wardell
Armstrong International.Mr Ellis is a Chartered Geologist of the Geological Society of London and has sufficient experience relevant to the
style of mineralisation,the type of deposit under consideration and to the activity undertaken to qualifyas a Competent Person as defined in
the 2012edition of the ‘AustralasianCode for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Ellis consents to
the inclusion of the information in the release in the form and context in which they appear.
The informationin this Presentation for the South Bekisopa Iron Project thatrelates to Mining and FinancialResults of the updatedScoping
Study for the South Bekisopa Iron Project is based on information prepared by Mr Colin Davies (MiningEngineer) BEng, MSc, CEng, ACSM,
MIMMM, QMR who is a full-time employee of Wardell ArmstrongInternationaland Mr Winsor Lewis (FinancialAnalyst) BSc, ARCS,
ManagementAccountantwho is a sub-consultantto Wardwell Armstrong International. Mr Colin Davies is a Chartered Engineer of the
Instituteof Materials, Mineral and Mining UK, and Mr Winsor Lewis is a ManagementAccountant.Mr Davies and Mr Lewis both consent to
the inclusion of the information in the release in the form and context in which they appear.
3
Cleaner iron ore for greener steel
AKORA Resources – Corporate Snapshot
Company Overview
ASX-listed (AKO), AKORA has iron
ore projects in Madagascar with its
flagship Bekisopa Project hosting
194.7Mt1 of Inferred Resources +
Exploration Target of 500Mt to
1.0Bt2 with the potential of producing
premium +67% Fe concentrate. The
high-grade iron ore is essential for
DRI-EAF technology, enabling “green
steel” production.
To drive immediate value, AKORA is
fast tracking its Stage 1 Direct
Shipping Ore (DSO) operation. This
near term strategy targets 2Mt/pa of
+61% iron ore, generating rapid cash
flow while the company positions itself
as a critical supplier for the global
energy transition.
Market Statistics
Share Price A$0.103
Shares on Issue Mill 173.924
Market Capitalisation A$M 17.39M
Cash A$M 1.14
Debt - Nil
Enterprise Value A$M 16.29
Board & Management
Graeme Hunt Chairman
Matthew Gill Non-Executive Director
Peter Bird Managing Director & CEO
Shane Turner CFO & CoSec
Jason Whittle GM – Development
James Deo Senior Advisor – Corporate
Development
Shareholders (> 4%)
Futureworld Management Pty Ltd 15.04%
N J Axam 4.16%
W A Hose 4.10%
1. JORC Compliant Mineral Resource Estimate released in April 2022.
2. Exploration Target refers to Exploration Potential in accordance with JORC, WAI Independent Geologists Report P147, AKORA IPO Prospectus, released 21 October 2020.
3. Last close 4 March 2026
4. 31 December 2025 Quarterly Activities and Cash Flow Report, released 30 January 2026
4
Cleaner iron ore for greener steel
Mining Permit – Granted “Major Value Inflection”
Transformational milestone, 25 year Mining Permit granted (March 2026) securing long term
tenure, development certainty and enabling key value workstreams:
• Project Financing:
• Accelerating discussions with strategic partners and project financiers
• Critical Path Approvals – clears the pathway for:
• Logistics and infrastructure agreements
• Land access and surface rights
• ESIA approvals
• Port and export arrangements
• Transition to Development
• Positions Bekisopa for near term development and execution and production readiness
5
Cleaner iron ore for greener steel
A growth focused iron ore company unlocking value from premium high-
grade assets.
Stage 1 – Start-Up Project – DSO “the enabler”
Stage 2 – Direct Reduced Iron (DRI) Concentrate.
Future Pipeline of Projects – to be evaluated
Multi-Staged Development
6
Cleaner iron ore for greener steel
PFS confirms Bekisopa’s Stage One
2Mtpa high-grade direct shipping
iron ore (DSO) operation has strong
economics.
PFS shows the capital investment delivering
revenues of A$1.25 Billion and A$0.5 Billion
cash flow (pre-tax)*.
Stage One Development
*Refer ASX Announcement 31/03/25 Bekisopa high-grade iron ore project PFS confirms a robust 2Mtpa DSO Operation with an 86% IRR.
Bekisopa Direct Shipping Ore operation will supply
Blast Furnace-Basic Oxygen Furnace (BF-BOF)
steelmakers with Lump and Fines product at an
average 61.6% Fe grade.
7
Cleaner iron ore for greener steel
1.8 years
US$310M
US$42/t
C1 cash cost (FOB) Capital payback
Pre-tax cash flow
86%
US$147M
US$61M
Capital Cost NPV10 (pre-tax) IRR (pre-tax)
US$789M
6 years
2Mt
PFS Validates Strength of DSO Project^*.
Annual Production
^Refer ASX Announcement 31/03/25 Bekisopa high-grade iron ore project PFS confirms a robust 2Mtpa DSO Operation with an 86% IRR.
*
At a benchmark price of US$100 / tonne
Revenue
Initial Mine Life
Average 61.6% Fe grade
We believe further
drilling will confirm
additional mine life,
and the vision for a
multi decade high-
grade iron ore
concentrate project
beyond the initial
DSO start-up phase
is achievable.
8
Cleaner iron ore for greener steel
DSO Outcrop
~67% Fe*
Trench 36: High-grade lump and fines iron ore
DSO weathered zone, 2.2m at ~66% Fe*
*AKO Prospectus, ASX Announcement 11/12/20
Bekisopa’s high-grade iron DSO is close to surface
“Low Strip Ratio”with upside potential
9
Cleaner iron ore for greener steel
Start-Up Capital US$60.6M
• The capital cost breakdown developed by AKORA and
WAI* covers all activities from mining through to ship
loading.
• PFS Capital cost includes US$6.8M of Owners and
EPCM costs, contingency at ~15% and Government
3% Social and Community Fund payment.
Pre-Feasibility Study – Capital Costs (US$M)
Mining 1.2
6.5
Facilities
7.8
4.8
Processing (crush, screen, magnetic)
Roads 29.4
Port 2.3
EPCM 6.8
Contingency
Government 3% Social Fund 1.8
* Wardell Armstrong International 60.6
Total Bekisopa DSO Capital (US$M)
10
Cleaner iron ore for greener steel
Mining:
Simple shallow open
pit excavation using
shovel and truck with
no drill and blasting
• Low strip ratio of 0.52:1 over the initial 6 year life
• Mobile crushing and screening equipment to be
used initially with magnetic separation after Year 3
• Contract haulage (via truck) to deliver product to
the existing Toliara Port where a mobile conveyor
will load a transshipping barge
11
Cleaner iron ore for greener steel
Over life of mine, the DSO operation delivers
40% Lump @ 61.8% Fe and 60% Fines product @ 61.4% Fe
Geotechnical studies show
that the DSO reserve will not
require drill and blasting, just
conventional truck and shovel
mining then crushing and
screening to produce Lump
and Fines iron products at
LOM average blended grade
of 61.6% Fe.
Lump Fines
12
Cleaner iron ore for greener steel
C1 cash cost of US$42.3/t
is cost competitive compared
to potential peers.
• Highly competitive C1 cash cost, low strip 0.52:1
• Excluding majors the Bekisopa DSO project delivers
a C1 cash cost in the first quartile of peer producers
• The operating cost breakdown developed by AKORA
and WAI covers all activities from mining through to
ship loading.
• Each operating cost was developed using supplied
contractor costs and built up using the PFS mine
and production plans.
PFS operating cash costs by operating
centre, Life of Mine Average ($US/t).
G&A 3.00
Processing (crush, screen, magnetic) 2.30
Mining (contractor) 4.40
Port and Transhipping
(contractor)
8.60
Haulage to port
(contractor)
24.00
Total C1 Cash Cost (US$/t) 42.30
13
Cleaner iron ore for greener steel
PFS Long-Term Benchmark Price – US$100/t
Potential Margin
14
Cleaner iron ore for greener steel
• Start-up capital of US$60.6M
“unlocks” US$310M cash flows for
initial 6 years
• Resource Growth additional drilling is
expected to significantly expand the
resources and long term returns
• Attractive investment case compelling
metrics for financing and strategic
partners seeking value and growth
Capital Payback 1.8 Yrs
Highly Investable Opportunity
15
Cleaner iron ore for greener steel
+1Mt Recoverable
Resources delivers an
additional US$21M NPV
• PFS production provides strong base for growth
• Strong geological continuity with a high conversion
confidence
• Targeted drilling is expected to upgrade existing
Inferred Resources and grow known Target areas
Resources Base and Growth Upside
16
Cleaner iron ore for greener steel
Logistics:
PFS Maps Route from
Bekisopa to Port.
• 25km of new roads from the mine site to the
Zomandao River crossing, followed by 80km of
existing road to be upgraded to the township of
Satrokala.
• Then a further 25km of existing roadway requires
some upgrading which then connects with
National Highway RN7.
17
Cleaner iron ore for greener steel
New bypass road from RN7 highway to be used to access Toliara Port.
This public road, financed by the Bank of
European Investment, became
operational in early 2025.
The Malagasy Ministry of Public Works has
launched a Notice of Expression of
Interest for consultancy for detailed
preliminary design studies for the
extension and modernisation of the Toliara
port.
Financed under the second phase of the
Trade Corridor Development and
Facilitation Project (PACFC II), with the
support of the African Development Bank
(AfDB).
18
Cleaner iron ore for greener steel
At Toliara Port, a mobile conveyor will load a
10,000wmt transshipping barge
• The barge will transport the
product to the export vessel in
deep waters outside the bay of
Toliara and be unloaded by the
ship’s gear.
• As shipments reach 2Mtpa from
Year 3, transshipping will utilise
two barges, working in parallel,
and incorporate a floating crane,
moored in deeper water, to
facilitate faster loading rates of
the export vessels.
19
Cleaner iron ore for greener steel
Strategic Export Advantage
• Well positioned to supply global steel and
DRI pellet manufacturers globally.
• Established port infrastructure enables
efficient shipping across Asia, Middle East
and Europe
20
Cleaner iron ore for greener steel
Strategic Focus “Next Value Drivers”
Key focus CY 2026
Following the grant of the Mining Permit:
Advance Feasibility Study
• Engage engineering firms to refine capital and operating cost for project financing
• Seek to secure additional permits as required to bring Bekisopa to operational readiness
Internal Capability
• Onboarding key technical leads to “fast-track” to production
Strategic Partner & Financing
• Conclude strategic partner discussions for project participation and development
• Engage banks and other financial institutions to advance project financing
21
Cleaner iron ore for greener steel
Bekisopa: Near Term DSO with Substantial
Multi-Decade Inferred Magnetite Resource*.
194.7Mt Inferred Resources1
+ Exploration Target 500Mt - 1.0Bt2
1. JORC Compliant Mineral Resource Estimate released in April 2022.
2. Exploration Target refers to Exploration Potential in accordance with JORC, WAI Independent Geologists Report P147, AKORA IPO Prospectus, released 21 October 2020.
22
Cleaner iron ore for greener steel
District Scale
Growth Potential
North
Central
South
41.2 Mt
43.3 Mt
110.2 Mt
• North + Central + South Pits for the
DSO project deliver NPV10 $147m
• Significant Upside: less than 50%
of the 6km strike drilled
• Potential for further DSO resource
tonnes along strike
• Resource is Under Explored and
Remains Open
23
Cleaner iron ore for greener steel
Capital Efficient DSO Project with
Scalable Long Life, High Value Magnetite Project
• The low capital and operating cost DSO
project delivers NPV10 $147 million
• A potential long life* premium product to
decarbonise the steel industry – unlocking a
multi-decade high value opportunity
• Substantial upside from a scalable magnetite
project with significant standalone and
strategic value
* Based on an Exploration Target, refers to Exploration Potential in accordance with JORC, WAI Independent Geologists Report P147, AKORA IPO Prospectus, released 21 October 2020.
24
Cleaner iron ore for greener steel
• Premium Priced +67% Fe Concentrate for Green
Steel Technologies
• Low impurity DRI-grade product targets growing
premium priced Fe concentrate for Direct
Reduced Iron-Electric Arc Furnace (DRI-EAF)
technology.
Stage Two Development
DRI-EAF technology reduces carbon
emissions significantly.
25
Cleaner iron ore for greener steel
AKORA’s Compelling Investment Case
DSO operation offers
Strong metrics and fast pathway to positive
cashflow
• Revenue : cost ratio exceeds 2:1
• Minimum life of 6 years with only ~40% of the
mineralised DSO style trend fully evaluated
• AKORA is trading at less than 10% of NPV
US$147m based on “DSO Starter Project”
For the Future
• Premium Grade Low Impurity DRI Concentrate
offering a long life feedstock for decarbonising
the steel industry
• More extensive project portfolio of iron ore
projects to be evaluated
AKORA Resources Ltd
ACN 139 847 555
ASX: AKO
12 Anderson Street West,
Ballarat
Victoria 3350.
Join the conversation
@AkoraResources
Follow us
https://www.linkedin.co
m/company/akora-
resources/
Contact us
Peter Bird
Managing Director
peter.bird@akoravy.com
Subscribe to our investor
relations platform
InvestorHub:
https://investorhub.akoravy.c
om/auth/signup
Share your feedback
Discover