Bekisopa Drilling Update
Released
Released
Announcement PDF
ASX Release
14 September 2021
Drilling Continues to Indicate High Grade Iron, Supporting
Bekisopa’s Potential as a Major Future Iron Ore Project
AKORA Resources (“AKORA” or “the Company”) (ASX Code: AKO) is pleased to provide
shareholders with the third progress report on resource drilling at Bekisopa. Recently
completed drilling confirms very encouraging iron mineralisation intercepts that extend from
surface to a depth of 67m as well as confirming that iron mineralisation continues along at
least 5km’s of strike.
7 drill holes completed for 581.1m to finish the shallow drilling campaign
Highlights:
•
Iron mineralisation now confirmed along 5-kilometers of the 6-kilometer
strike on tenements 3757 and 10430
•
Drill holes intercepted high-grade massive, weathered iron mineralisation
from surface with several also at depth up to 100m
•
+450 metre total lengths along central drill grid parallel to the magnetic
anomaly and a 67 metres mineralisation intercept downhole from surface
•
Drilling continues to confirm extensive iron mineralisation and potential
for a significant initial resource tonnage at Bekisopa
1|Page
This third stage of drilling, the final 7 shallow drill holes for 581 metres, was completed on 29
August 2021 (shareholders were previously updated on the current drilling programme on 20
July 2021 and 15 August 2021 (See ASX Announcements)). In total AKORA has completed
30 shallow diamond drill holes (<100m) in 2021 for a total of 1,976m. Excellent iron
mineralisation intercepts observed with drilling, logging and preparation continuing to plan.
All 7 drill holes, completed in this third stage intercepted iron mineralisation at surface with
several also intercepting mineralisation at depth. Drill hole logging of BEKD40 showed iron
mineralisation from surface to 67m and then intercepted a second layer at a depth of 94m
and was still in mineralisation when drilling stopped at 100.3m. The complete drill hole
details and intercepts are included in Table 1 of Appendix 1.
The iron mineralisation observed in the drill core from this third sequence of holes contains
what appears to be high-grade, weathered, massive mineralisation in the near surface
intercepts and extensive thicknesses of massive, coarse and fine disseminated
mineralisation at depth. Figure 1 below shows the weathered iron mineralisation at surface
in drill hole BEKD36 from the very south of the main tenement 10430. This hole is some
100m east of drill hole BEKD11 from 2020 that missed intercepting mineralisation and hole
BEKD36 confirms iron mineralisation extending to the very south of the six-kilometer strike.
The mineralisation appears from the on-site logging and magnetic susceptibility readings to
contain high iron contents similar to those reported from the 2020 drilling programme (see
ASX Announcements 13 April 2021 and 27 April 2021) with expectation for similar quality
high iron product grades.
Figure 1
Weathered Massive, high-grade, iron mineralisation at surface to 4.37m in BEKD36 similar weathered
mineralisation is observed in this hole down to 12.3m, with a smaller zoner from 16.5 to 17.3m. This drill
hole in the very south of tenement 10430 confirms iron mineralisation extending south along the sixkilometer strike length.
Based on the on-site logging and magnetic susceptibility readings, expectation is for similar iron
contents to those recorded in the 2020 drilling programme.
Figure 2 shows the location of the 31 shallow drill holes, <100m depth, of the 2021 drilling
campaign with their iron intercepts, the third month’s drill results are noted in purple text.
2|Page
Tenement 3757
Tenement 10430
Figure 2
2021 Bekisopa drilling campaign drilling location plan, showing the first 10 drill holes, BEKD13 to
BEKD22, the second months drill holes, BEKD23 to BEKD35, and the remaining shallow drill holes,
BEKD36 to BEKD42, with locations and their iron mineralisation intercepts. The drilling confirms that the
iron mineralisation extends along at least five kilometers of strike length.
The last 7 shallow drill holes includes one in the south and six in the Central Zone of the sixkilometer strike length. BEKD36 in the very south of tenement 10430, is to the east of drill
hole BEKD12 from the 2020 drilling, and this hole intercepted weathered iron mineralisation
at surface to a depth of 12.3m. The last 6 drill holes were in the Central Zone and added
volume to the 2020 drill holes, all intercepted weathered iron mineralisation at surface with 5
of them also intercepting iron mineralisation layers at depths down to 100m, see Figure 3.
Infill drilling in the Central Zone confirms continuity of iron mineralisation across and along
the magnetic anomaly and strike length. The iron mineralisation width across holes BEKD4,
BEKD5 and BEKD6, from the 2020 drilling, plus the infill drill holes BEKD39 and BEKD40
show a mineralisation width of some 250m (estimated true thickness >100m) and a depth of
iron mineralisation at least to 100m down hole, see Figure 3. Similarly, drill holes BEKD37
and BEKD38 and then BEKD41 and BEKD42 add width to mineralisation intercepted in drill
hole BEKD03 from the 2020 drilling, see Figure 4(a) and (b). The drilling along strike in this
Central Zone were spaced at 200m and show continuity of iron mineralisation along the
north – south strike of over 450m. These results are promising for significant addition to the
resource tonnage.
3|Page
BEKD39
BEKD40
Figure 3
Cross section of Bekisopa 2021 drill holes BEKD39 and BEKD40 infill drill holes to the 2020 BEKD04,
BEKD05 and BEKD06 drill hole results. The 2021 drill holes intercepted weathered iron mineralisation at
surface and confirm the presence of additional iron mineralisation at depth and dipping to the west.
(a)
Figures 4 (a)
Bekisopa 2021 drill holes BEKD37 to BEKD38 in the Central Zone of the main strike have intercepted iron
mineralisation from surface and substantial iron mineralisation at depth.
4|Page
BEKD41
BEKD42
(b)
Figures 4 (b)
Bekisopa 2021 drill holes BEKD41 and BEKD42 with 2020 drill hole BEKD03 in the Central Zone have
intercepted iron mineralisation from surface as well as significant depths of mineralisation.
This drilling will add volume for the resource estimation and the iron mineralisation is ideally positioned
for a low-strip ratio mining operation in this area.
Iron mineralisation
in the gully wall
Figure 6
Drill rig completing Bekisopa drill hole BEKD40 in the Central Zone, showing iron rich surface soils and
to the left of the drilling is a gully which shows continuous iron mineralisation from surface. This hole
intercepted weathered iron mineralisation at surface and massive iron mineralisation to a depth of 67m,
see Appendix 1, then intercepted a second layer of mineralisation from 94m which was present when the
hole finished at 100.32m.
5|Page
These final seven shallow drill holes, like the previous 23 drill holes, continue to be very
encouraging in confirming iron mineralisation present in the central zone, at depth and
across the drill grid. Which is all favorable for the development of a significant resource
tonnage at Bekisopa and initially low stripping ratio mining.
The next phase of drilling, after a short break and re-commenced on 9 September 2021, will
be the deeper holes in the South and North adding volume and tonnage to the completed
shallow drilling in these areas.
The attached Appendix contains drill core details and photos from the final 7 shallow drill
holes. These show drill core with high-grade near surface weathered iron mineralisation and
massive, coarse and fine disseminated iron mineralisation at depth. Initial interpretation
combined with the on-site logging is that these drill cores should generate comparable iron
assays and product grade results to those achieved from 2020 drilling campaign.
Conclusion
The 2021 Bekisopa drilling campaign, increased to ~5000 metres, continues safely and
successfully with weathered massive iron mineralisation intercepts from surface for these
shallow drill holes, plus deeper un-weathered iron mineralisation confirming depth potential.
Drill core shows what appears to be high-grade, weathered, massive iron mineralisation near
surface in most holes along the six-kilometer strike. Logging and magnetic susceptibility
shows similar geology and susceptibility numbers to the 2020 drilling so expectation is that
this near surface mineralisation will upgrade to a high-grade fines product.
Drilling confirms continuity along and across strike indicating likelihood for a substantial initial
mineral resource estimate at Bekisopa.
Bekisopa Drilling – September and October
Drilling and geology QA / QC continues in the south since 9 September 2021. Two drilling
crews returned to Bekisopa to complete 20 deeper 150 to 250m holes to confirm iron
mineralisation continuity at depth which, if successful, will add volume / tonnage for the
development of the Bekisopa mineral resource estimate. The drilling campaign moves onto
a 24-hour roster with the arrival of the larger drill rig ensuring completion of the drilling in
October.
Drilling Progress Reporting and Communication
Drill core from the second batch of samples, holes BEKD19 to BEKD24 (see ASX
Announcement 20 July 2021 and 17 August 2021), arrived in Perth on 1 September 2021 for
assay and processing trials.
The third batch, drill holes BEKD25 to BEKD30, were dispatched from Antananarivo on 9
September 2021 for ALS Perth via Europe as air transportation remains difficult under
Covid-19.
The cycle of drilling, logging, preparation then dispatch to ALS Perth is well underway and all
continues on schedule, leading to a proposed JORC Resource estimation by years end.
The drilling and assay results will be continually reported on over the coming months leading
up to reporting of the maiden Bekisopa JORC compliant resource by the end of the year
assuming the drilling equipment, sample preparation, international logistics and resource
estimation continues to plan.
6|Page
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About AKORA Resources
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa Project, the Tratramarina Project and the Ambodilafa Project,
iron ore projects in Madagascar, in all totalling some 308 km2 of tenements across these
three prospective exploration areas. Bekisopa Iron Ore Project is a high-grade magnetite
iron ore project of >4km strike and is the key focus of current exploration drilling and
resource modelling.
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related
scientific and technical information, is based on, and fairly represents information compiled by Mr
Antony Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He is a
shareholder in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years
prior to being engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of
Mining and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG).
Mr Truelove has sufficient experience which is relevant to the styles of mineralisation and types of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the
matters based on his information in the form and context in which it appears including sampling,
analytical and test data underlying the results.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Directors of Akora Resources Limited (AKO), as such he is a shareholder
in Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and
Metallurgy (FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of
mineralisation and its processing under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the JORC Code. Mr Bibby consents to the inclusion in
this report of the matters based on his information in the form and context in which it appears
including analytical, test data and mineral processing results.
Authorisation
This announcement has been authorised by the board of directors of AKORA Resources Limited for
release to the market on 13 September 2021.
7|Page
Appendix 1
This third stage of drilling was completed on August 29th comprising the final 7
shallow holes for 581 metres. Previously announcements covered the first month’s drilling
which was completed on 13 July 2021, with 10 drill holes for 660 metres (see ASX
Announcement 20 July 2021) and then the second month’s drilling was completed on 9 August
2021 with 13 drill holes for 735 metres (see ASX Announcement 17 August 2021).
In total 30 shallow diamond drill holes (<100m) for a total of 1,976m have been completed.
Drilling, logging and preparation continuing according to plan. Bekisopa 2021 drilling campaign
details for drill holes BEKD36 to BEKD42 are shown in Table 1, with drill core iron mineralisation
photos from BEKD36 to BEKD42 following.
Hole
ID,
BEKD
Utm38sX*
Utm38sY
*
Azm
Degrees
Incline
Degrees
Length
m
TCR
%
36
587,001
7,607,001
90
-60
100.34
99
37
586,601
7,610,601
90
-60
50.24
99
38
586,551
7,610,601
90
-60
100.32
97
39
586,500
7,610,800
90
-60
100.34
97
40
586,406
7,610,801
90
-60
100.32
93
41
586,398
7,611,000
90
-60
80.28
98
42
586,430
7,611,000
90
-60
49.27
93
From
m
To
m
Length
m
Mineralisation
0.00
12.26
16.47
18.77
82.34
85.88
0.00
14.05
28.86
40.74
0.00
10.00
25.09
43.85
50.49
81.00
0.00
20.38
48.78
63.89
74.80
81.76
12.26
16.47
18.77
82.34
85.88
100.34
14.05
28.86
40.74
50.24
10.00
25.09
43.85
50.49
81.00
100.32
20.38
48.78
63.89
74.80
81.76
100.34
12.26
4.21
2.30
63.57
3.54
14.46
14.05
14.81
11.88
9.50
10.00
15.09
18.76
6.64
30.51
19.32
20.38
28.40
15.11
10.91
6.96
18.58
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
Iron
Gneiss
0.00
67.27
67.27
Iron
67.27
77.27
0.00
4.13
0.00
9.72
77.27
100.27
4.13
30.26
9.72
100.31
10.00
Gneiss
23.00
Iron
4.13
26.13
9.72
90.59
Iron
Gneiss
Iron
Gneiss
Table 1
Drill hole locations and initial results for the third stage of 7 holes in the Bekisopa 2021 Drilling
Campaign. Note that co-ordinates are from handheld GPS only and will be accurately surveyed at
completion of the drilling programme. Surface iron mineralisation intercepts range in thickness from 10
to 67.27m based on preliminary on-site logging.
The following drill core photos for BEKD36 to BEKD42 continue to show weathered massive
iron mineralisation at surface, which is excellent from a mining perspective. It appears from
on-site logging and magnetic susceptibility readings that we should expect similar grade iron
contents and product grade results from these drill cores as for the 2020 core.
BEKD36 is a 100m drill hole in the very south of the main tenement and confirms extension
so far along the five kilometers of the strike and has shown some 12m of weathered iron
mineralisation from surface. BEKD37 to BEKD42 are shallow drill holes in the central zone
and infill holes to the 2020 drilling programme. All these holes intercepted surface iron
mineralisation and confirm an area of continuous iron mineralisation that appears from onsite logging and magnetic susceptibility measurements to have high-grade iron content and
extend to depths of up to 67m downhole from surface.
8|Page
BEKD36 - 0 to 12.3m Weathered Massive Iron Mineralisation at the south of tenement 10430
BEKD37 - 0 to 4.01m
9|Page
Weathered Massive Iron Mineralisation
BEKD37 - 34.19 to 37.93m
Weathered Coarse Disseminated Iron Mineralisation
BEKD38 - 0 to 3.93m Weathered Massive Iron mineralisation
BEKD38 - 26 to 28.26m
Coarse Disseminated Iron Mineralisation
BEKD38 - 50.81 to 54.50m Massive Iron Mineralisation
10 | P a g e
BEKD38 - 61.98 to 65.68m
Massive Iron Mineralisation
BEKD38 - 73.32 to 77.42m Massive Iron Mineralisation
BEKD39 - 0 to 4m
Weathered Massive Iron Mineralisation
BEKD39 - 4.65 to 8.58m
11 | P a g e
Weathered Iron Mineralisation
BEKD39 - 50.45 to 53.34m
Massive and Coarse Disseminated Iron Mineralsiation
BEKD39 - 58.93 to 62.75m
Coarse Disseminated Iron Mineralisation
BEKD39 - 78 to 81.72m Coarse Disseminated Iron Mineralisation
BEKD40 - 0 to 2.46m Weathered Massive Iron Mineralisation
12 | P a g e
BEKD40 - 32.37 to 36.14m Coarse Disseminated Iron Mineralisation
BEKD40 - 47.33 to 51.4m
Coarse Disseminated Iron Mineralisation
BEKD40 - 63.27 to 66m Fine Disseminated Iron Mineralisation
BEKD40 - 97.4 to 100.3m
13 | P a g e
Coarse Disseminated Iron Mineralisation
BEKD41 - 0 to 4.18m
BEKD41 - 27.73 to 31.42m
Weathered Iron Mineralisation
Massive to Coarse Disseminated Iron Mineralisation
BEKD42 - 0 to 4.69m Weathered Iron Mineralisation
BEKD42 - 22.27 to 29.57m
14 | P a g e
Fine to Coarse Dissemintaed Iron Mineralisation
JORC Code
Table 1 Section 1 Sampling Techniques and Data
BEKISOPA PROJECT
Criteria
Sampling
techniques
Drilling
techniques
15 | P a g e
JORC Code explanation
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
Commentary
• Diamond core (HQ or NTW) is split in half using a core saw or splitter (if clayey or
rubbly). A consistent half of the core is broken with a hammer and bagged prior to
dispatch to the preparation laboratory in Antananarivo. Sample interval is
nominally 1m down hole but with samples terminated at lithological boundaries.
• All drilling is diamond core drilling using either NTW (64.2mm inner diameter) or
HQ (77.8mm inner diameter) coring equipment. The holes are generally collared
using HQ and changed to NTW between 3m and 25m downhole. Core is not
orientated. All drillholes are surveyed every 10m using a Reflex EZ-Gyro
gyroscopic multi-shot camera. No surveys to date have varied more than 5° from
the collar survey in either azimuth or declination.
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
16 | P a g e
JORC Code explanation
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Commentary
• Average core recovery is 97% but may be lower in the rubbly part of the
weathered zone. Several one metre intervals returned low recoveries due to
rubbly material. All other intervals gave good recovery, with close to 100% in
fresh rock.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• All core was fitted together so that a consistent half core could be collected,
marked up with a “top” line (line perpendicular to dip and strike, or main foliation),
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• During drilling, checks and verifications of the accurate measurement of
penetration depth of drill hole cores were made and observations and recording of
the colour of the water / mud rising from the drill hole were made.
• All drill core was logged quantitatively using industry standard practice on site in
enough detail to allow mineral resource estimates as required.
• Logging included: core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally magnetite or
hematite), mineralisation style, mineralisation %, structure, magnetic susceptibility
(see below), pXRF readings (see below), notes (longhand).
• All core was photographed both wet and dry and as both whole and half core.
• All core was geotechnically logged and RQD’s calculated for every sample
interval.
• All drill-holes were logged using a magnetic susceptibility meter to enable
accurate distinction of iron (magnetite) rich units and to potentially differentiate
between magnetite and hematite rich mineralisation.
• Density measurements were made using both the Archimedes method (mainly
fresh rock) and the Caliper Vernier (mainly regolith) methods.
Criteria
JORC Code explanation
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
17 | P a g e
Commentary
sample intervals decided and marked up and the core subsequently split in half
using a core saw, separating samples into the marked-up intervals. If the core
was clayey or rubbly, it was split in half using a hammer and chisel. The intervals
were nominally 1m, but smaller intervals were marked if a change in geology
occurred within the 1m interval.
• The half core sample intervals were put into polythene bags along with a paper
sample tag. This was then sealed using a cable tie and placed into a second
polythene bag with a second paper tag and this was sealed using staples.
• The samples were subsequently transferred at regular intervals to the sample
preparation facility in Antananarivo (OMNIS) where they will undergo the following
preparation:
o Sorting and weighing of samples
o Drying at 110-120°C until totally dry
o Weighing after drying
o Jaw crushing to 2mm
o Riffle split and keep half as a reference sample
o Collect a 100g sub-sample of 80% passing 2mm material and store
this
o Pulverise to minus 75 micrometres
o Clean ring mill using air and silica chips
o Riffle split and sub-sample 2 sets of 100g pulps
o Store reject pulp
o Conduct a pXRF reading on the minus 75 micrometre pulp
o Weigh each of the sub-samples (minus 2mm, 2 x minus 75
micrometres) and store in separate boxes for ready recovery as
needed
• No assaying has been undertaken as yet on the drillholes being reported.
Criteria
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
18 | P a g e
JORC Code explanation
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Commentary
• As assaying has not yet been undertaken, only qualitative descriptions and
magnetic susceptibility readings are reported.
•
•
•
All drill hole collars have been provisionally located using a hand-held GPS (+/-5m
accuracy). Final collars will be picked up at completion of the drilling program.
The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
Topographic control is country wide data only. An accurate topographic survey
will be undertaken prior to any resource estimation.
• Data spacing is planned to be at 200m x 50m drill spacing which is considered
reasonable for the style of mineralisation being intersected. In several areas with
significant surficial mineralisation, drill-hole density has been closed up to 100m x
50m.
• All samples will be assayed as individual, less than 1m long intervals. Composites
of selected intervals will be tested using wet and dry, low intensity magnetic
separation (LIMS).
• The ironstone unit has a strong north-south trend and drilling is generally oriented
to the east. The outcrops, trenches and magnetics all show a steep to shallow
westerly dip and hence the drill direction is considered to be optimal. The drilling
in the south was interpreted as being synclinal in nature with tonnage potential
limited to the keel of the syncline. However, it has been found that the structure is
an orocline and that mineralisation continues at depth in this area. Mineralisation
in the SW zone appears to be sheet-like at present but additional drilling is
required to confirm the true morphology in this location. A single hole oriented to
the west in the far south of the tenement suggests the sequence is dipping to the
Criteria
JORC Code explanation
Commentary
east here, suggesting an anticlinal structure in this area.
• No sample bias is evident.
Sample
security
• The measures taken to ensure sample security.
• Chain of Custody procedures are implemented to document the possession of the
samples from collection through to storage, customs, export, analysis, and
reporting of results. Chain of custody forms are a permanent records of sample
handling and off-site dispatch.
• The on-site Geologist is responsible for the care and security of the samples from
the sample collection to the export stage. Samples prepared during the day are
stored in the preparation facility in labelled sealed plastic bags.
• The Chain of Custody form contains the following information:
• Sample identification numbers;
• Type of sample;
• Date of sampling;
• List of analyses required;
• Customs approval;
• Waybill number;
• Name and signature of sampling personnel;
• Transfer of custody acknowledgement.
• Samples are delivered to the analytical laboratory by courier. A copy of the Chain
of Custody form is signed and dated and placed in a sealable plastic bag taped on
top of the lid of the sample box. Each sample batch is accompanied by a Chain of
Custody form.
• One box of samples was incorrectly sent to ALS Ireland and one to ALS Perth
rather than the other way around. The laboratory subsequently sent the one box
from Ireland to Perth and the box incorrectly sent to Perth was assayed in Perth.
No tampering of either of these boxes was observed.
Audits or
rev
Share your feedback
Discover