31 March 2026 Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
1
For the quarter ended 31 March 2026
Quarterly
Report
For the quarter ended
31 March 2026
AKORA Resources Ltd
ABN 90 139 847 555
ASX Code: AKO
www.akoravy.com
AKORA is advancing its Stage 1
high-grade Direct Shipping Iron
Ore (DSO) project in
Madagascar, where studies
indicate strong margins with low
upfront capital and operating
costs.
Future plans see the potential
development of a premium priced
high grade iron concentrate to
support the Green Steel (low
carbon emissions) initiatives.
• The Bekisopa high-grade iron ore project
exploration trenching program extended the
known High-Grade Iron Ore Mineralisation.
• Bekisopa Mining Permit secured, unlocking
Stage 1 Direct Shipping Ore (DSO) project
development.
• AKORA presented at the Mining Indaba (South
Africa) and MiningNews Select (Sydney)
conferences.
• Grant Samuel Advisory appointed to
Accelerate Strategic Financing and Partnering
Initiatives.
Highlights
2
For the quarter ended 31 March 2026
Key Activities and Highlights for the Quarter
At the Bekisopa high-grade iron ore Project.
High Grade Iron Mineralisation Extended at the Bekisopa Project, Madagascar
• 339 metres of trenching delivers further easily accessible Direct Shipping (DSO) high-grade iron
ore between the existing JORC South and Central resource zones.1
• All 8 trenches intersect iron mineralisation.
• Best high-grade iron Direct Shipping Ore (DSO) trenching intercepts:
Trench Number Trench length (metres)
Average Iron Grade
(%Fe)
BEKT001 36 63.8
including 14.5 66.3
BEKT002 87 60.5
including 33.2 64.4
• Results reinforce strong upside to expand the Indicated DSO Resource footprint of the Bekisopa
tenement.
Assays from the Company’s sixth exploration campaign at Bekisopa completed in October 2025, have
returned multiple high-grade iron intersections of DSO style iron mineralisation in a region previously not
drilled between the known Southern and Central Resource zones. The surface trenching program consisted
of 8 exploration trenches totalling 339 metres in length to typically a maximum depth of 2 metres, with some
deeper.
Approximately 50% of the Bekisopa tenement remains unexplored, presenting substantial growth
potential. Magnetic surveys have identified significant magnetic anomalies along the 6 kilometre strike
that has yet to be drilled. Targeted trenching, used as a low-cost exploration technique, has focused on
known magnetic anomalies (Figure 1) and outcropping iron mineralisation (Figure 2), beyond the known
mineral resource.
1
ASX Announcement Bekisopa PFS, 31 March 2025
3
For the quarter ended 31 March 2026
Figure 1. Map showing drill holes, historical pit locations, magnetic results and the mapping and
trenching areas at Bekisopa (Areas 1, 2 & 3)
4
For the quarter ended 31 March 2026
Figure 2. Satellite Imagery of the tenement, exploration drill holes and areas 1,2 & 3. Imagery shows
zones of red soil out cropping in between southern and central resource areas.
5
For the quarter ended 31 March 2026
Mining Licence Granted
As announced on 26 November 2025, the Company had formally lodged its application for the Bekisopa
Mining Permit2
, better known as the Permis d’Exploitation (“PE”). Following a thorough review and
consultation process, the Mining Permit has now been granted by the Ministry of Mines and registered
with the Bureau du Cadastre Minier de Madagascar (BCMM) in accordance with the Malagasy Mining
Code. The grant of the Mining Permit is subject to the satisfaction of customary regulatory requirements
by the Company. This includes compliance with all regulatory provisions governed by the Mining Code.
The mining permit is valid for twenty-five (25) years, securing long term tenure and covers an area of
approximately 25 km2
.
The grant of this Mining Permit (PE 10430) forms a pivotal, value-creating, derisking milestone for the
project and enables AKORA to substantially advance the progress of the high-grade Bekisopa iron ore
project from exploration to project development and mining. This event is expected to:
• Accelerate interest and engagement with strategic partners and potential joint venture participants,
• Provide the regulatory certainty required to materially advance financing discussions,
• Commence detailed planning for a Feasibility Study and secondary permits, paving the way for
commercial activities at the site, and
• Support continued positive engagement with local communities and stakeholders, and commence
discussions for local procurement, which will strengthen the Company’s social licence to operate.
AKORA Presented at Mining Indaba & MiningNews Select
During the quarter, Managing Director and Chief Executive Officer, Peter Bird, showcased the AKORA
Resources portfolio at the Mining Indaba Conference in Cape Town, South Africa and MiningNews Select
Conference in Sydney, with positive feedback from existing and potential investors including potential
strategic interest and financing partners.
Grant Samuel Advisory appointed
Following receipt of the Mining Permit and as the Company progresses towards production, the Board has
recognised the need for an experienced and sophisticated financial advisory partner to fast track the
strategic partnering and financing process. Grant Samuel brings a strong track record across major
Australian and international resource transactions. The engagement will focus primarily on securing
strategic investors, evaluating project level financing structures and supporting AKORA’s capital markets
strategy.
2
ASX Announcement 26 November 2025
6
For the quarter ended 31 March 2026
Bekisopa High-Grade Iron Ore Project
Ownership 100% | Madagascar, Africa
AKORA is advancing Stage One plans at Bekisopa to produce up to 2 million tonnes per annum
(Mtpa) of a 61% Fe average grade Direct Shipping Ore (DSO) for export to Blast Furnace-Basic
Oxygen Furnace (BF-BOF) steelmakers. Bekisopa’s high-grade iron ore may also be upgraded to
a +67% Fe concentrate at 75 microns for shipping to Direct Reduced Iron-Electric Arc Furnace
(DRI-EAF) steelmakers (Stage Two) to make greener steel, produced without using coal and
generating considerably less carbon emissions.
Completed by Wardell Armstrong International (now a part of the global SLR Consulting group), a Pre-
Feasibility Study (PFS) released in March 2025 confirmed Bekisopa’s planned Stage 1 Direct Shipping
Ore (DSO) operation could produce 2 million tonnes per annum (Mtpa) of blended grade lump and fines
iron ore products at a 61.6% Fe average for blast furnace steelmakers3
.
The significant scale and particular mineralisation characteristics of Bekisopa’s iron ore resource
presents the Company with a staged development program:
1. Stage 1: Produce ~61.6% Fe average grade direct shipping iron ore (DSO): Mine, crush and screen
the at surface ‘weathered zone’ iron ore to produce a LOM average blended grade of 61.6%Fe across
the lump and fines product for shipping to Blast Furnace-Basic Oxygen Furnace (BF-BOF) steelmakers
via a port at Toliara. A Fines product could be delivered at an average LOM grade of 61.4% Fe and a
Lump product at an average LOM grade of 61.8% Fe.
2. Stage 2: Produce +67% Fe grade Direct Reduced iron concentrate: Using cash generated from the
DSO start-up production, mining the underlying fresh mineralisation and adding grinding and magnetic
separation circuits to upgrade ore to a +67% Fe low impurity concentrate at 75 microns for shipping to
Direct Reduced Iron-Electric Arc Furnace (DRI-EAF) steelmakers via a port of Toliara. The DRI-EAF
process is used to manufacture greener steel with considerably less carbon emissions.
The PFS for Stage 1 considers using contract mining and mobile processing equipment (crushing, screen,
and with magnetic separation after Year 3), and conveying, contract truck hauling of the product, as well
as operating barges and a floating crane at the existing Toliara port.
3 Refer ASX release dated 31 March 2025 Bekisopa high-grade iron ore project PFS confirms a robust 2Mtpa DSO Operation
with an 86% IRR.
7
For the quarter ended 31 March 2026
Satrokala Project
Ownership 100% | Madagascar
AKORA’s Satrokala Iron Ore Project has emerged as a significant prospect after a recent
magnetic survey4
identified a major anomaly up to 10km long and 2km wide, making it some 66%
larger than the Company’s more advanced Bekisopa Iron Ore Project.
In 2024, a maiden drilling program targeting the magnetic anomaly was completed at Satrokala, which
returned substantial intersections of low-grade iron mineralisation across all five holes of the sighter
exploratory drilling program over 500m. This is a positive sign that the mineralised systems is continuous
and supports a broader, near surface iron formation extending across the Satrokala anomaly.
No activities were completed at Satrokala during the quarter while the Company focused on delivering
key milestones for its flagship Bekisopa Project.
Figure 3. Satrokala drill plan and the associated ground magnetic survey results.
4 Refer ASX Release dated 20 March 2024 – Satrokala Magnetic Survey Results
8
For the quarter ended 31 March 2026
Corporate
Cash Position
AKORA Resources Limited held cash reserves at the end of quarter of approximately $0.5 million.
Markets and Outlook
Iron Ore demonstrated significant price resilience throughout the quarter, closing at US$107/t on 31
March 2026. While longer term consensus forecasts are around US$90–95/t range, the current market
remains buoyed by steady demand and disciplined supply.
Shareholder Information
As at 31 March 2026, the Company had 693 shareholders and 173,924,745 ordinary fully paid shares on
issue with the top 20 shareholders holding 56.12% of the total issued capital.
ASX Additional Information
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure spend during the quarter was
$215,556. Full details of exploration activity during the quarter are set out in this report.
ASX Listing Rule 5.3.2: The Company confirms that there was no mine production and development
activities during the quarter.
ASX Listing Rule 5.3.5: Payment to related parties of the Company during the quarter was $135,701 in
cash. A description of and explanation for payments to related parties and their associates per Section
6.1 of the Appendix 5B following this Quarterly Activities Report is set out in the table below:
Director Remuneration Current Quarter
Managing Director fees 87,501
Non-Executive Director fees 35,000
Superannuation 13,200
Total 135,701
Board and Senior Management
Graeme Hunt Non-executive Chairman
Peter Bird Managing Director & Chief Executive Officer
Matthew Gill Non-executive Director
Shane Turner Chief Financial Officer & Company Secretary
Jason Whittle General Manager – Development
James Deo Senior Advisor – Corporate Development
9
For the quarter ended 31 March 2026
ASX Announcements during the quarter
The following material announcements were lodged on the ASX Market Announcements Platform during
the quarter:
Date Description
30 January 2026 31 December 2025 Quarterly Activities & Cashflow Report
11 February 2026 AKORA to Present at Mining Indaba
25 February 2026 High-Grade Iron Mineralisation Extended at Bekisopa Project
4 March 2026 Mining Permit Granted for Bekisopa High-Grade Iron Ore Project
11 March 2026 AKORA to Present at MiningNews Select
23 March 2026 Grant Samuel Advisory Appointed to Accelerate Strategic Investors
31 March 2026 Annual Report to Shareholders
These announcements are available for viewing on the Company’s website www.akoravy.com.
Other details
Head Office
12 Anderson Street West
Ballarat Vic 3350
Website: www.akoravy.com
This announcement is authorised by the Board.
For further information contact:
Peter Bird
Managing Director
AKORA Resources
info@akoravy.com
10
For the quarter ended 31 March 2026
Competent Persons’ Statement
The information in this statement that relates to Exploration Targets and Exploration Results is based on
information compiled by Mr Jannie Leeuwner – BSc (Hons) Pr.Sci.Nat. MGSSA and is a full-time
employee of Vato Consulting LLC. Mr. Leeuwner is a registered Professional Natural Scientist
(Pr.Sci.Nat. - 400155/13) with the South African Council for Natural Scientific Professions (SACNASP).
Mr. Leeuwner has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and the activity being undertaken to qualify as a Competent Person as
defined in the Note for Mining Oil & Gas Companies, June 2009, of the London Stock Exchange and the
2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’ (JORC Code). Mr. Leeuwner consents to the inclusion of the information in this release in the
form and context in which it appears.
The information in this document that relates to the Mineral Resource estimate of the Bekisopa project is
based on, and fairly represents information and supporting documentation compiled and reviewed by
Mr. Richard Ellis, a full-time employee of Wardell Armstrong International and independent of Akora
Resources. Mr. Ellis is a Chartered Geologist (CGeol) and Fellow of the Geological Society of London,
and European Geologist (EurGeol) of the European Federation of Geologists, and has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the December 2012
edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves" ('JORC Code'). Mr. Ellis consents to the inclusion in the report of the matters based upon the
information in the form and context in which it appears.
The information in this document that relates to the Ore Reserve estimate for the Bekisopa project, is
based on and fairly represents information and supporting documentation compiled and reviewed by Mr.
Colin Davies, a full-time employee of Wardell Armstrong International and independent of Akora
Resources. Mr. Davies is a Chartered Mining Engineer (CEng), a Member of the Institute of Materials,
Minerals and Mining UK (MIMMM), and Qualified for Minerals Reporting (QMR). Mr. Davies has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the December 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves" ('JORC Code'). Mr. Davies consents to the inclusion in the report of the
matters based upon the information in the form and context in which it appears.
11
For the quarter ended 31 March 2026
Tenement Interests
As at 31 March 2026, the company had interests in the following tenements (as required by Listing Rule
5.3.3). The only change in the company’s interests in tenements during the quarter was the conversion
of Bekisopa 10430 to a Mining Permit (PE).
Project Location
Tenement
Number
Blocks Current Interest
Bekisopa PE Madagascar, Africa 10430 64 100%
Bekisopa PR Madagascar, Africa 27211 128 100%
Bekisopa PR Madagascar, Africa 35827 32 100%
Bekisopa PRE Madagascar, Africa 3757 16 100%
Samelahy PR Madagascar, Africa 6595 98 100%
Samelahy PR Madagascar, Africa 13011 33 100%
Samelahy PR Madagascar, Africa 21910 3 100%
Tratramarina East PR Madagascar, Africa 16635 144 100%
Tratramarina East PR Madagascar, Africa 16637 48 100%
Tratramarina East PR Madagascar, Africa 17245 160 100%
Tratramarina West PRE Madagascar, Africa 18379 16 100%
Tratramarina West PRE Madagascar, Africa 18891 48 100%
12
For the quarter ended 31 March 2026
Mineral Resources and Ore Reserves
Table 1. Bekisopa Mineral Resource Estimate (Inferred Resource) as at 31 March 20265
INFERRED RESOURCE CONCENTRATE DAVIS TUBE
LOCATION TONNES HEAD GRADE TONNES GRADE RECOVERY
MT % FE MT % FE %
Southern 110.2 32.0 42 67.6 37.8
Central 41.2 30.0 15 67 36.3
Northern 43.3 33.3 19 68.2 43.3
Total Inferred 194.7 32.0 75.4 67.6 38.7
Table 2. Bekisopa 2025 Ore Reserve Estimate6
Ore Reserve Summary
Classification Area Ore Tonnes Fe Waste Tonnes Strip Ratio
(Kt) (%) (Kt) (W/O)
Probable South 7,493 54.1 2,979 0.40
Probable Central 1,231 45.0 1,202 0.98
Probable North 344 58.2 525 1.53
Probable Total 9,068 53.0 4,706 0.52
Notes:
1. The effective date of the Ore Reserve estimate is 07 February 2025.
2. The Ore Reserves estimate is reported in accordance with the guidelines of the JORC Code (2012). 3. Variable cut-off
grades have been applied to meet product requirements, of Enriched >60% Fe, Intermediate A 40-60% Fe, and Intermediate B
30-40% Fe.
4. The Ore Reserve estimate is based on optimisation parameters including a selling price of $110/t for 62% Fe concentrate and
takes into account Modifying Factors related to mine design, geotechnical parameters, mining and processing costs, processing
recoveries, G&A, ESG and royalty costs. Mining dilution varies by domain between 1-3% based on diggability and rippability
considerations. Mining recovery varies between 97-99% by domain.
5. Quantities are in dry metric tonnes as transported to the ROM. Figures have been rounded to an appropriate level of
precision. Due to rounding some totals may not compute exactly as shown.
5
ASX Release 11 April 2022 – Bekisopa Total Maiden Inferred Resource
6 ASX Release 31 March 2025 – Bekisopa High-Grade Iron Ore Project PFS
13
For the quarter ended 31 March 2026
Table 3. Bekisopa MRE Direct Shipping Ore Zone
Mineral Resource Estimate for the Bekisopa Project
Free Digging and Rippable Mineral Resources, 7 February, 2025
Classification Tonnes (Kt) Density (t/m3
) Fe (%) SiO2 (%) Al2O3 (%) P (%)
Bekisopa South
Enriched DSO
Indicated 5,724 3.39 60.3 6.1 3.6 0.10
Inferred 902 2.99 55.9 7.7 4.7 0.10
Intermediate A
Indicated 1,231 2.38 40.5 23.1 8.2 0.10
Inferred 105 2.33 40.1 23.6 7.4 0.07
Intermediate B
Indicated 260 2.54 34.3 29.3 4.9 0.15
Inferred 765 3.41 39.0 24.7 4.6 0.13
Bekisopa Central
Enriched DSO
Indicated 560 3.19 54.9 11.1 6.1 0.06
Inferred 15 3.07 53.5 12.0 6.4 0.06
Intermediate A
Indicated 605 2.65 38.7 23.7 7.4 0.11
Inferred 42 2.65 38.9 23.1 7.6 0.11
Intermediate B
Indicated 59 2.75 31.2 2.7 4.2 0.18
Inferred 187 3.2 38.1 17.6 2.6 0.12
Bekisopa North
Enriched DSO
Indicated 349 3.11 58.5 7.5 5.46 0.09
Inferred 955 3.49 52.6 11.3 3.4 0.21
Intermediate A
Indicated - - - - - -
Inferred 111 2.52 39.3 23.2 5.9 0.13
Intermediate B
Indicated - - - - - -
Inferred 748 2.71 32.8 23.6 3.7 0.16
Bekisopa Total
Classification Tonnes (Kt) Density (t/m3
) Fe (%) SiO2 (%) Al2O3 (%) P (%)
Enriched DSO
Indicated 6,633 3.36 59.7 6.6 3.9 0.10
Inferred 1,872 3.22 54.2 9.6 4.0 0.16
Intermediate A
Indicated 1,836 2.46 39.9 23.3 7.9 0.10
Inferred 258 2.46 39.5 23.3 6.8 0.10
Intermediate B
Indicated 319 2.57 33.7 29.0 4.7 0.16
Inferred 1700 3.04 36.2 23.4 4.0 0.15
14
For the quarter ended 31 March 2026
Notes
1. Mineral Resources of the Enriched zones are reported within wireframe boundaries interpreted at nominal
cut-off grades of 58% Fe for Bekisopa South and North and 50% Fe for Bekisopa Central. Mineral
Resources of the Intermediate A zones are reported within wireframe boundaries interpreted at a nominal
cut-off grade of 35% Fe. Mineral Resources of the Intermediate B zones are reported at a cut-off grade of
30% Fe.
2. Mineral Resources are limited by an optimised open pit shell based on appropriate technical and economic
parameters.
3. Mineral Resources are not Ore Reserves until they have demonstrated economic viability based on a Pre-
Feasibility Study or Feasibility Study.
4. Mineral Resources are reported inclusive of any Ore Reserves.
5. Mineral Resources have been classified in accordance with the guidelines of the JORC Code (2012) by
Richard Ellis, an independent Competent Person as defined by JORC.
6. The Mineral Resource estimate has not been affected by any known environmental, permitting, legal, title,
taxation, socio-political, marketing or any other relevant issues.
7. All figures are rounded to reflect the relative accuracy of the estimate, and apparent errors may occur due
to rounding.
15
For the quarter ended 31 March 2026
Company Profile
Cleaner iron ore for greener steel
AKORA Resources (ASX: AKO) is an Australian resources company focused on the development of four high-grade
iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (Mt) Inferred JORC Resource (ASX
Announcement 11 April 2022) with very low impurities able to produce a premium-priced +67% Fe concentrate. Direct
Reduced Iron-Electric Arc Furnace technology, which is used to make greener steel without coal and considerably
less carbon emissions, requires iron ore grades of at least 67%.
(ASX Announcement – Bekisopa Scoping Study, 14 November 2023)
To generate cash in the near-term, AKORA is advancing plans at Bekisopa for a Stage 1, 2Mt per annum Mine with
a six-year life of mine, producing 61.6% Fe average grade lump and fine direct shipping ore (DSO) for shipping to
Blast Furnace steelmakers.
(ASX Announcement - Bekisopa Pre Feasibility Study, 31 March 2025)
The Company confirms that it is not aware of any new information or data that materially affects the above and that
all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
And further the Company confirms that all material assumptions underpinning the 2Mt per annum production target
continue to apply and have not materially changed.
16
For the quarter ended 31 March 2026
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
AKORA Resources Limited
ABN Quarter ended (“current quarter”)
90 139 847 555 31 March 2026
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3-months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs (136) (136)
(e) administration and corporate costs (277) (277)
1.3 Dividends received (see note 3)
1.4 Interest received 1 1
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other
1.9 Net cash from / (used in) operating
activities
(412) (412)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation (216) (216)
(e) investments
(f) other non-current assets
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
17
For the quarter ended 31 March 2026
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3-months)
$A’000
2.5 Other
2.6 Net cash from / (used in) investing
activities
(216) (216)
3. Cash flows from financing activities
52 52
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing
activities
52 52
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,099 1,099
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(412) (412)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(216) (216)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
52 52
4.5 Effect of movement in exchange rates on
cash held
4.6 Cash and cash equivalents at end of
period
523 523
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in
the consolidated statement of cash
flows) to the related items in the
accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 6 19
5.2 Call deposits 513 1,076
5.3 Bank overdrafts
5.4 Other US dollar accounts 4 4
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
523 1,099
18
For the quarter ended 31 March 2026
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
136
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: Salaries and superannuation for directors.
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Add notes as necessary for an understanding of
the sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities
7.2 Credit standby arrangements
7.3 Other (Convertible Notes)
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
$A’000
8.1 Net cash from / (used in) operating activities (item 1.9) 412
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
216
8.3 Total relevant outgoings (item 8.1 + item 8.2) 628
8.4 Cash and cash equivalents at quarter end (item 4.6) 523
8.5 Unused finance facilities available at quarter end (item 7.5)
8.6 Total available funding (item 8.4 + item 8.5) 523
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.83
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A.”
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating cash
flows for the time being and, if not, why not?
Yes.
19
For the quarter ended 31 March 2026
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to
fund its operations and, if so, what are those steps and how likely does it believe that they
will be successful?
Yes. Trading Halt requested 30 April 2026 for a Capital Raising.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Yes. See answer to 8.8.2.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing
Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 30 April 2026
Authorised by: Board of Directors
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the
past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information
over and above the minimum required under the Listing Rules is encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB
6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent
standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the
accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board.” If it has been authorised
for release to the market by a committee of your board of directors, you can insert here: “By the [name of board committee – e.g. Audit and Risk
Committee].” If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee.”
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with
recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the board should have
received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this
report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has
been formed on the basis of a sound system of risk management and internal control which is operating effectively.