First Deep Drill Hole Results
Released
Released
Announcement PDF
ASX Release
26 September 2021
First Bekisopa deep drill hole intercepts iron mineralisation down to
185 metres, down hole, continuing to confirm Bekisopa’s
Potential as a Major Future Iron Ore Project
AKORA Resources (“AKORA” or “the Company”) (ASX Code: AKO) is pleased to provide
shareholders with the fourth progress report on resource drilling at Bekisopa. Recently
completed drilling confirms very encouraging iron mineralisation intercepts that extend at
depth to 185m, down hole, as well as confirming that iron mineralisation continues across
and along the 5 km of strike.
134.5 metre, down hole, continuous iron mineralisation
intercept with first deep drill hole
80 and 130m, down hole, continuous iron mineralisation intercept with the
next two deep drill holes
Highlights:
•
144 metres of mainly massive iron mineralisation intercepted across two
locations, down hole
•
Iron mineralisation at depth of 185m down hole
•
Extends estimated across strike width to +650m
•
Adds significant additional tonnage potential in the Southern area
1|Page
First Bekisopa Deep drill hole
The fourth stage of drilling has commenced with the first deep diamond drill hole intercepting
iron mineralisation from approximately 40 to 185 metres down hole. Within this drill hole is
continuous iron mineralisation of 134.5 metres. This drill hole is the sixth in a sequence
along latitude 76080150, in the southern area, and shows continuous iron mineralisation
from east to west of plus 650 metres.
The onsite logging, magnetic susceptibility measurements and drill core photos suggest a
zone of massive and coarse disseminated iron mineralisation, see Figure 1, to a depth of
some 185 metres down hole. Expectation is for this iron mineralisation to readily upgrade to
a high-grade fines product at a coarse crush as achieved in trials on 2020 drill core (ASX
Announcements 13 April and 27 April 2021).
Figure 1
Massive and coarse disseminated iron mineralisation from 168.79 to 172.55m in Bekisopa drill hole
BEKD43, the first deep drill hole intercepting iron mineralisation down hole to 185m.
Bekisopa 2021 drilling campaign details for drill holes BEKD43 and BEKD43a are shown in Table
1. The first 50m of drill hole BEKD43 had poor core recovery and was drilled again 3m adjacent
to the original hole.
Hole
ID,
BEKD
43A
Utm38sX*
Utm38sY
*
Azm
Degrees
Incline
Degrees
Length
m
TCR
%
From
m
586,551
7,608,151
90
-60
50.64
81
0.0
35.0
39.55
48.97
586,549
7,608,151
90
-60
195.91
90
43
Length
m
Mineralisation
35.0
39.55
48.97
50.64
35.0
4.55
9.42
1.67
Gneiss
Iron and Gneiss
Iron
Gneiss
50.9
182.47
131.47
182.47
185.43
185.43
195.61
2.96
10.18
To
m
Iron
Iron and Gneiss
Gneiss
Table 1
Drill hole location and initial results for the first deep diamond drill hole BEKD43. An intercept of
131.47m of iron mineralisation from 50.9 to 182.47 metres was observed based on preliminary on-site
logging. The drill recovery averaged 58% for the first 50m of drill hole BEKD43 so this sectioned was
redrilled 3m to the east and achieved an 81% TCR.
2|Page
The drilling results for BEKD45, which is some 150m due south of BEKD43, shows an 80
metres continuous intercept from 36.2 to 116.2 metres down hole, then BEKD 46, which is
150 north of BEKD43, shows a 130 metres continuous intercept from 42m down hole. At
this time, we have not received detailed onsite logging and drill core photos for these latest
drill holes and will report further information once all is available.
The cross section along latitude 76080150, including 2020 drill holes BEKD09, BEKD10 and
BEKD11 and 2021 drill holes BEKD13, BEKD14, BEKD43 and BEKD34 and BEKD35, these
last two being 50 metres to the south and west of the previous drilling shows the shape of
the zone of iron mineralisation, see Figure 2. This cross section shows considerable iron
mineralisation over a +650 metres cross section in the southern area of the main strike
length on Bekisopa main tenement 10430. Drill hole BEKD43 shows the layer of iron
mineralisation turns back towards surface.
As this drill grid in the Southern area is completed there looks to be considerable volume /
tonnage to define a significant resource that outcrops at surface and has an ideal structure
for a low strip ratio mining operation, Figure 4. When drilling is completed in the Southern
area a drill grid covering some 650m, east to west, and 550m, north to south, will have been
developed and with all drill holes to date intercepting iron mineralisation this is encouraging
for determining a resource tonnage.
Figure 2
Cross section along latitude 76080150 incorporating Bekisopa drill hole BEKD09,10, 11,13, 14, 34, 35 and
the first deep drill hole BEKD43. Shows iron mineralisation to depths of 185m, down hole,
and a true width of some +650m.
3|Page
BEKD46
BEKD43
BEKD45
Figure 3
The southern area drill grid showing completed drill holes, black and blue, and these planned, green.
This is becoming a substantial drilled out area, in a high magnetic intensity area, and with all holes so far
intercepting iron mineralisation is promising for a sizable resource tonnage.
Figure 4 set out on the following page shows a representatively sequence of drill core photos
from BEKD43 from 50 to 188 metres down hole. The drill core comprises massive and
coarse disseminated iron mineralisation transitioning into coarse disseminated iron
mineralisation at the end of the intercept.
4|Page
Figure 4.
The start of a 135m continuous iron intercept.
BEKD43 - 49.9 to 53.63m
BEKD43 - 66.07 to 69.98m
Massive Iron Mineralisation
Coarse Disseminated Iron Mineralisation
BEKD43 - 77.65 to 81.51m Coarse Disseminated Iron mineralisation
5|Page
BEKD43 - 86.17 to 89.92m
Massive Iron Mineralisation
BEKD43 - 97.61 to 102.97m Gneiss and Coarse Disseminated Iron Mineralisation
Gneiss
BEKD43 - 107.54 to 112.67m
6|Page
Coarse Disseminated Iron Mineralisation
BEKD43 - 116.69 to 120.80m Massive Iron Mineralisation
7|Page
BEKD43 - 125.35 to 129.56m
Massive Iron Mineralisation
BEKD43 - 137.6 to 141.55m
Massive Iron Mineralisation
BEKD43 - 145.48 to 149.40m
BEKD43 - 58.93 to 62.75m
Massive Iron Mineralsiation
Massive and Coarse Disseminated Iron Mineralisation
BEKD43 - 78 to 81.72m Massive Iron Mineralisation
8|Page
BEKD43 - 172.55 to 176.37m Massive Iron Mineralisation
BEKD43 - 180.33 to 184.16m Coarse Disseminated Iron Mineralisation
BEKD43 - 184.16 to 185.43m
Coarse Disseminated Iron Mineralisation
End of Mineralisation
9|Page
Conclusion
The 2021 Bekisopa drilling campaign continues with the deeper diamond drill holes. The
first BEKD43 shows a 134.5m intercept (not true width) that finished at 185.4m down hole,
showing the depth extent of the iron mineralisation at Bekisopa. Importantly, this has
suggested that the recently identified south-western area may be continuous with the main
southern area, significantly increasing tonnage potential in the south of the project area.
BEKD43 drill core shows what appears to be high-grade, massive and coarse disseminated
iron mineralisation and from the onsite logging and magnetic susceptibility readings shows
similar geology and susceptibility numbers to the 2020 drilling so expectation is that this
extensive iron mineralisation will upgrade to a high-grade fines product at a coarse crush as
achieved with 2020 drill core (ASX Announcements 13 April and 27 April 2021). BEKD45,
150m south, and BEKD46, 150m north, of drill hole BEKD43 show similar extensive iron
mineralisation intercepts of 80m and 130m respectively.
This extensive intercept, and expanding Southern drill grid, adds encouragement to defining
a substantial initial mineral resource estimate at Bekisopa.
Bekisopa Drilling – September and October
Drilling and geology QA / QC continues in the south then moves to the northern area. Two
drilling crews are at Bekisopa to complete 20 deeper 150 to 250m holes, three have already
been completed, to confirm iron mineralisation continuity at depth which, if successful, will
add volume / tonnage for the development of the Bekisopa mineral resource estimate. The
drilling campaign moves onto a 24-hour roster with the arrival of the larger drill rig ensuring
completion of the drilling in late October.
Drilling Progress Reporting and Communication
Assaying has commenced at ALS Perth on the first 12 drill holes (see ASX Announcement
20 July 2021 and 17 August 2021).
The third batch, drill holes BEKD25 to BEKD30, have arrived in Perth Australian Customs
and will be assayed once received at ALS Perth.
The cycle of drilling, logging, preparation then dispatch to ALS Perth is well underway and all
continues on schedule, leading to a proposed JORC Resource estimation by years end.
The drilling and assay results will be continually reported on over the coming months leading
up to reporting of the maiden Bekisopa JORC compliant resource by the end of the year
assuming the drilling equipment, sample preparation, international logistics and resource
estimation continues to plan.
10 | P a g e
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About AKORA Resources
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa Project, the Tratramarina Project and the Ambodilafa Project,
iron ore projects in Madagascar, in all totaling some 308 km2 of tenements across these
three prospective exploration areas. Bekisopa Iron Ore Project is a high-grade magnetite
iron ore project of >4km strike and is the key focus of current exploration drilling and
resource modelling.
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related
scientific and technical information, is based on, and fairly represents information compiled by Mr
Antony Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He is a
shareholder in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years
prior to being engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of
Mining and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG).
Mr Truelove has sufficient experience which is relevant to the styles of mineralisation and types of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the
matters based on his information in the form and context in which it appears including sampling,
analytical and test data underlying the results.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Directors of Akora Resources Limited (AKO), as such he is a shareholder
in Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and
Metallurgy (FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of
mineralisation and its processing under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the JORC Code. Mr Bibby consents to the inclusion in
this report of the matters based on his information in the form and context in which it appears
including analytical, test data and mineral processing results.
Authorisation
This announcement has been authorised by the AKORA Resources Board of Directors on
26 September 2021.
11 | P a g e
JORC Code
Table 1 Section 1 Sampling Techniques and Data
BEKISOPA PROJECT
Criteria
Sampling
techniques
Drilling
techniques
12 | P a g e
JORC Code explanation
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
Commentary
• Diamond core (HQ or NTW) is split in half using a core saw or splitter (if clayey or
rubbly). A consistent half of the core is broken with a hammer and bagged prior to
dispatch to the preparation laboratory in Antananarivo. Sample interval is
nominally 1m down hole but with samples terminated at lithological boundaries.
• All drilling is diamond core drilling using either NTW (64.2mm inner diameter) or
HQ (77.8mm inner diameter) coring equipment. The holes are generally collared
using HQ and changed to NTW between 3m and 25m downhole. Core is not
orientated. All drillholes are surveyed every 10m using a Reflex EZ-Gyro
gyroscopic multi-shot camera. No surveys to date have varied more than 5° from
the collar survey in either azimuth or declination.
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
13 | P a g e
JORC Code explanation
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Commentary
• Average core recovery is 97% but may be lower in the rubbly part of the
weathered zone. Several one metre intervals returned low recoveries due to
rubbly material. All other intervals gave good recovery, with close to 100% in
fresh rock.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• All core was fitted together so that a consistent half core could be collected,
marked up with a “top” line (line perpendicular to dip and strike, or main foliation),
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• During drilling, checks and verifications of the accurate measurement of
penetration depth of drill hole cores were made and observations and recording of
the colour of the water / mud rising from the drill hole were made.
• All drill core was logged quantitatively using industry standard practice on site in
enough detail to allow mineral resource estimates as required.
• Logging included: core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally magnetite or
hematite), mineralisation style, mineralisation %, structure, magnetic susceptibility
(see below), pXRF readings (see below), notes (longhand).
• All core was photographed both wet and dry and as both whole and half core.
• All core was geotechnically logged and RQD’s calculated for every sample
interval.
• All drill-holes were logged using a magnetic susceptibility meter to enable
accurate distinction of iron (magnetite) rich units and to potentially differentiate
between magnetite and hematite rich mineralisation.
• Density measurements were made using both the Archimedes method (mainly
fresh rock) and the Caliper Vernier (mainly regolith) methods.
Criteria
JORC Code explanation
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
14 | P a g e
Commentary
sample intervals decided and marked up and the core subsequently split in half
using a core saw, separating samples into the marked-up intervals. If the core
was clayey or rubbly, it was split in half using a hammer and chisel. The intervals
were nominally 1m, but smaller intervals were marked if a change in geology
occurred within the 1m interval.
• The half core sample intervals were put into polythene bags along with a paper
sample tag. This was then sealed using a cable tie and placed into a second
polythene bag with a second paper tag and this was sealed using staples.
• The samples were subsequently transferred at regular intervals to the sample
preparation facility in Antananarivo (OMNIS) where they will undergo the following
preparation:
o Sorting and weighing of samples
o Drying at 110-120°C until totally dry
o Weighing after drying
o Jaw crushing to 2mm
o Riffle split and keep half as a reference sample
o Collect a 100g sub-sample of 80% passing 2mm material and store
this
o Pulverise to minus 75 micrometres
o Clean ring mill using air and silica chips
o Riffle split and sub-sample 2 sets of 100g pulps
o Store reject pulp
o Conduct a pXRF reading on the minus 75 micrometre pulp
o Weigh each of the sub-samples (minus 2mm, 2 x minus 75
micrometres) and store in separate boxes for ready recovery as
needed
• No assaying has been undertaken as yet on the drillholes being reported.
Criteria
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
15 | P a g e
JORC Code explanation
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Commentary
• As assaying has not yet been undertaken, only qualitative descriptions and
magnetic susceptibility readings are reported.
•
•
•
All drill hole collars have been provisionally located using a hand-held GPS (+/-5m
accuracy). Final collars will be picked up at completion of the drilling program.
The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
Topographic control is country wide data only. An accurate topographic survey
will be undertaken prior to any resource estimation.
• Data spacing is planned to be at 200m x 50m drill spacing which is considered
reasonable for the style of mineralisation being intersected. In several areas with
significant surficial mineralisation, drill-hole density has been closed up to 100m x
50m.
• All samples will be assayed as individual, less than 1m long intervals. Composites
of selected intervals will be tested using wet and dry, low intensity magnetic
separation (LIMS).
• The ironstone unit has a strong north-south trend and drilling is generally oriented
to the east. The outcrops, trenches and magnetics all show a steep to shallow
westerly dip and hence the drill direction is considered to be optimal. The drilling
in the south was interpreted as being synclinal in nature with tonnage potential
limited to the keel of the syncline. However, it has been found that the structure is
an orocline and that mineralisation continues at depth in this area. Mineralisation
in the SW zone appears to be sheet-like at present but additional drilling is
required to confirm the true morphology in this location. A single hole oriented to
the west in the far south of the tenement suggests the sequence is dipping to the
Criteria
JORC Code explanation
Commentary
east here, suggesting an anticlinal structure in this area.
• No sample bias is evident.
Sample
security
• The measures taken to ensure sample security.
• Chain of Custody procedures are implemented to document the possession of the
samples from collection through to storage, customs, export, analysis, and
reporting of results. Chain of custody forms are a permanent records of sample
handling and off-site dispatch.
• The on-site Geologist is responsible for the care and security of the samples from
the sample collection to the export stage. Samples prepared during the day are
stored in the preparation facility in labelled sealed plastic bags.
• The Chain of Custody form contains the following information:
• Sample identification numbers;
• Type of sample;
• Date of sampling;
• List of analyses required;
• Customs approval;
• Waybill number;
• Name and signature of sampling personnel;
• Transfer of custody acknowledgement.
• Samples are delivered to the analytical laboratory by courier. A copy of the Chain
of Custody form is signed and dated and placed in a sealable plastic bag taped on
top of the lid of the sample box. Each sample batch is accompanied by a Chain of
Custody form.
• One box of samples was incorrectly sent to ALS Ireland and one to ALS Perth
rather than the other way around. The laboratory subsequently sent the one box
from Ireland to Perth and the box incorrectly sent to Perth was assayed in Perth.
No tampering of either of these boxes was observed.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• No audit has been conducted.
16 | P a g e
JORC Code
Table 1 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Mineral
tenement
and land
tenure
status
JORC Code explanation
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Commentary
• The Company completed the acquisition of the minority interest in Iron Ore Corporation of
Madagascar sarl held by Cline Mining Corporation on 5 August 2020.
• The Company holds through Iron Ore Corporation of Madagascar sarl, Universal Exploration
Madagascar sarl and a Farm-in Agreement 12 exploration permits in three geographically
distinct areas. All administration fees due and payable to the Bureau du Cadastre Minier de
Madagascar (BCMM) have been and accordingly, all tenements are in good standing with the
government.
• The tenements are set out in Table 3.1 below
Project ID
Tratramarina
Ambodilafa
Bekisopa
17 | P a g e
Tenement
Holders
Permi
t ID
Per
mit
Typ
e
Num
ber
of
Block
s
UEM
16635
PR
144
UEM
16637
PR
48
UEM
RAKOTOA
RISOA
RAKOTOA
RISOA
17245
PR
160
18379
PRE
16
18891
PRE
48
MRM
6595
PR
98
MRM
13011
PR
MRM
21910
IOCM
Grantin
g Date
Expiry
Date
Submi
ssion
Date
Actual Status
Last Payment of
Administration
Fees
23/09/20
05
23/09/20
05
10/11/20
05
11/01/20
06
18/11/20
05
22/09/2
015
23/09/2
015
09/11/2
015
11/01/2
014
17/11/2
013
04/09/2
015
04/09/2
015
04/09/2
015
27/03/2
012
27/03/2
012
under renewal process
2021
under renewal process
2021
under renewal process
under transformation to
PR
under transformation to
PR
2021
33
20/05/20
03
15/10/20
04
19/05/2
013
14/10/2
014
08/03/2
013
07/08/2
014
under renewal process
2021
2021
12/07/2
015
under renewal process
under substance
extension and renewal
process
PR
3
23/09/20
05
22/09/2
015
10430
PR
64
26532
PR
768
04/03/20
04
16/10/20
07
03/03/2
014
03/02/2
019
28/11/2
013
under renewal process
2021
relinquished
2018
2021
2021
2021
Criteria
JORC Code explanation
Commentary
35828
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration
by other parties.
Geology
• Deposit type, geological setting and style of
mineralisation.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
18 | P a g e
•
RAZAFIND
RAVOLA
PR
80
27211
PR
128
35827
PR
32
3757
PRE
16
16/10/20
07
16/10/20
07
23/01/20
07
26/03/20
01
03/02/2
019
23/01/2
017
23/01/2
017
25/11/2
019
20/01/2
017
20/01/2
017
relinquished
2018
under renewal process
2021
under renewal process
Transfer from IOCM
Gerant to AKO
2021
2021
• Exploration has been conducted by UNDP (1976 - 78) and BRGM (1958 - 62). Final reports on
both episodes of work are available and have been utilised in the recent IGR included in the Akora
prospectus. Airborne magnetics was flown for the government by Fugro and has since been
obtained, modelled and interpreted by Cline Mining and Akora.
• The tenure was acquired by AKO during 2014 and work since then has consisted of:
o Data compilation and interpretation;
o Confirmatory rock chip sampling (118 samples) and mapping;
o Re-interpretation of airborne geophysical data;
o Ground magnetic surveying (305 line kilometres);
o The 2020 drilling programme of 1095.5m diamond core drilling in 12 drill-holes.
o The current programme that to date includes 579.6m in 9 drillholes (BEKD13 to 21)
• The recent drilling has shown that the surface mineralisation continues at depth, with at most a
25% increase in grade due to weathering effects. However, it should be noted that some
downslope creep of scree from these units may exaggerate apparent width at surface.
• The mineralisation occurs as a series of magnetite bearing gneisses and calc-silicates that occur
as zones between 50m and 150m combined true width.
• The mineralisation occurs as layers of massive magnetite (sometimes altered to hematite)
between 1m and 7m true width plus a lower grade zone that consists of lenses, stringers,
boudins and blebs of magnetite aggregates that vary from 1cm to 10’s of cm wide within a calcsilicate/gneiss unit (informally termed “coarse disseminated” here). These units sometimes have
an outer halo of finer disseminated magnetite (informally termed “disseminated” here).
• This wide mineralisation halo provides a large tonnage potential over the 6-7km strike of mapped
mineralisation and associated magnetic anomaly within the Akora tenement.
• The bands and blebs of massive magnetite aggregates along with preliminary LIMS testwork
suggest that a good iron product may be obtained using a simple crush to -2mm followed by
magnetic separation.
• All drill information being reported as part of the current press release is presented in the table
below:
Criteria
JORC Code explanation
including a tabulation of the following
information for all Material drill holes:
o Easting and northing of the drill hole
collar;
o Elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar;
o Dip and azimuth of the hole;
o Down hole length and interception
depth; and
o Hole length.
• If the exclusion of this information is
justified on the basis that the informa
Share your feedback