2022 Annual Report
Released
Released
Announcement PDF
Annual
Report
2022
For the year ending 31 December 2022
AKORA Resources Limited
(ACN 139 847 555)
www.akoravy.com
Inside this
report
Chairman’s Letter
2
Review of Operations
4
Directors Report
14
Remuneration Report
22
Auditor’s Independence Declaration
27
Financial Statements
28
Consolidated Statement of Profit or Loss and
other Comprehensive Income
29
Consolidated Statement of Financial Position
30
Consolidated Statement of Changes in Equity
31
Consolidated Statement of Cash Flows
32
Directors’ Declaration
58
Independent Auditor’s Report
59
ASX Information
65
Corporate Directory
68
Akora Resources Annual Report 2022
1
Chairman’s
Letter
The Company released an Inferred Resource of
194.7 Mt including a DSO “cap” on 11 April 2022
and a Scoping Study on 14 November 2022 with
potential for initial DSO mining operation and
over time a premium grade iron concentrate
mining operation.
2
Akora Resources Annual Report 2022
Chairman's Letter
Dear Shareholder
2022 was an exceptional year for your company
in delivering the milestones set out in the 2020
Prospectus for the listing on the Australian Securities
Exchange.
Your Company:
• delivered the first Mineral Resource at the
Bekisopa project in April and
• completed a Scoping Study in November.
Both these important milestones were achieved
within 2 years from the date of listing, and would
be the envy of many listed small cap resource
companies.
It is disappointing that the achievement of these
important milestones has not been consistently
reflected in the share price. As you are aware
the Company completed a equity raising in June
2022 at 32 cents per share, a 28% premium to the
listing price, which at that time better reflected the
advancement of the Bekisopa project.
The second-half of 2022 was negatively impacted
by global concerns over the war in Ukraine, inflation
pressures and the potential impact these issues might
have on global economic growth . These factors
adversely affected the market such that equity prices
for many listed junior resource entities no longer
reflect the performance of the companies or the
quality of their projects.
The recently announced infill drilling assays (see
ASX Announcement, dated 22 March 2023) warrants
consideration for advancing an initial DSO project
at Bekisopa, and examining options to develop a
large iron concentrate project over the longer term.
In this regard, the board is also keenly aware of
the additional potential at nearby Bekisopa West
and Satrokala, plus the Company’s other projects,
Tratramarina and Ambodilafa.
Every mining project from frontier exploration through
exploration and evaluation to development and
operations is a journey which is suited to investors
who have this vision of the project value creation
chain. We thank our shareholders for choosing to join
us in this pursuit.
I wish to thank the executive directors, Paul Bibby and
John Madden, and our consultants, who succeeded
in delivering the initial Mineral Resource, developed
the various scenarios for the Scoping Study, and
continue to advance the Bekisopa Project.
Yours sincerely
MH Stirzaker
Non-executive Chairman
30 March 2023
Akora Resources Annual Report 2022
3
Review of Activities
Review of
Operations
4
Akora Resources Annual Report 2022
Review of Activities
The Company achieved a number of significant milestones during the
financial year, including delivery of a Mineral Resource (H&S Consultants),
completion of a Scoping Study (Wardell Armstrong International); infill
drilling at the Southern Zone to upgrade the Direct Ship Ore (DSO)
resource and reconnaissance geological activities that returned exciting
rock chip samples at the Satrokala prospect.
MINERAL RESOURCE
The Company delivered in the first-half of the financial year a maiden JORC Resource at Bekisopa which was virtually double
the volume forecast in the December 2020 prospectus. With mineralisation achieved in all but two drill holes during 2021, the
Company brought forward the proposed work programmes for 2022 to better manage exploration costs and, most importantly,
maximise the potential the JORC Resource. The Mineral Resource was achieved within 15 months from the date of listing on the
Australian Securities Exchange.
The Inferred Resource of 194.7 Mt for 75.4 Mt of iron concentrate at a grade of 67.6% Fe was achieved across three ore zones:
Table 1: Bekisopa Maiden JORC Inferred Resource
INFERRED RESOURCE
CONCENTRATE
DAVIS TUBE
LOCATION
TONNES
HEAD GRADE
TONNES
GRADE
RECOVERY
MT
% FE
MT
% FE
%
Southern
110.2
32.0
42
67.6
37.8
Central
41.2
30.0
15
67
36.3
Northern
43.3
33.3
19
68.2
43.3
Total (Inferred)
194.7
32.0
75.4
67.6
38.7
Three products may be produced from Bekisopa. By selectively targeting the high-grade outcropping and high-grade weathered
material using conventional shovel and truck operations, lump and fines products could be produced as DSO. DSO refers to the
fact that apart from simple mechanical processes such as crushing, screening, and blending, the iron ore is shipped in essentially
the same form as that extracted from the ground with potential significant capital and operating cost advantages.
Within the maiden JORC Resource, H&S Consultants identified 7.8 Mt of outcrop and weathered high-grade DSO. It is this DSO
tonnage that is the near-term focus of the Company in upcoming exploration and economic studies. In-fill drilling commencing
late-August 2022 is aimed at expanding the existing resource, and better delineating the extent and grade of the weathered
zone.
The board of directors believe there is potential above the 7.8 Mt of DSO defined by H&S. The present resource modelling
used typically large-scale bulk mining blocks of 5 metres by 15 metres by 25 metres, which is acceptable for mining of fresh iron
mineralisation. At Bekisopa, it is highly likely that mineralisation at surface will be extracted using a selective mining approach
based on smaller mining blocks of about 2 metres in height. This should minimise dilution and enable the Company to achieve
increased DSO tonnage and higher grades.
Although this DSO tonnage represents a small portion of the JORC Resource, it clearly the best and fastest strategy to cash flows.
Akora Resources Annual Report 2022
5
Review of Activities
Figure 1: Bekisopa PR 10430
The third product from Bekisopa will be a high-grade iron concentrate. (The board of directors have identified the potential for
three products from the iron mineralisation at the Bekisopa project – DSO from the outcrop and weathered zone, Fines and/or
high-grade iron concentrate from the Mineral Resource making the second and third products.)
The production of high-grade fines will require crushing fresh iron ore to a relatively coarse 75 microns to produce a premiumgrade 67% or better iron concentrate. This concentrate would be an optimal feedstock for the production of Direct Reduced Iron
(DRI) pellets. DRI is produced by the removal (reduction) of oxygen from iron ore using natural gas as the reducing agent instead
of coal. Increased use of DRI is one of the key decarbonisation strategies of the global steel industry.
Metallurgical tests suggest the Inferred Resource at Bekisopa could be upgraded to a high-grade iron concentrate with potential
to produce product at a grade of 67.6% Fe with low impurities.
The board of directors believe there is potential for a significantly larger Mineral Resource at Bekisopa. H&S Consultants (see ASX
Announcement, dated 11 April 2022) identified exploration potential comprising two components:
6
(i)
Exploration potential for 20-40 Mt @30-45% Davis Tube recovery (DTR) for a total of 8-16 Mt of concentrate grading 66-69%
Fe exists in the Northern and Central zones.
(ii)
The new Mineral Resource plus the above Exploration Targets represent approximately 3.3 kilometres of a 5-kilometre-long
zone of mineralisation and therefore, allows for an additional 2 km of exploration potential along strike between known
deposits. Two magnetite-bearing diamond drillholes located halfway between the Southern and Central deposits suggest a
further Exploration Target of 30-50 Mt @ 20-40% DTR for a total 10-20 Mt of concentrate grading 66-69% Fe.
Akora Resources Annual Report 2022
Review of Activities
DRILLING AND ASSAYS
the Company released to the ASX a number of
announcements that outlined detailed drilling and assaying
results across three mineralised zones.
High-grade ~64% Fe at surface and continuous iron
mineralisation downdip to plus 260 metres
Northern Zone
The Northern Zone covers some 1.5 kilometres from north to
south and is about 200 meters across strike. It extends to a
depth of 270 metres with true thicknesses of 50 to 106 metres.
Assays demonstrate significant readily upgradeable iron
mineralisation that continues more than 300 metres downdip
from surface.
Several of the drillholes intersected high-grade outcrops:
BEKD 01 From surface to 6.9 metres
64.7% Fe
BEKD 19 From surface to 4.6 metres
63.9% Fe
BEKD 24 From surface to 3.9 metres
63.7% Fe
These iron grades are DSO and therefore, providing the
Company with potential to produce product which will only
require mining, crushing and screening.
Drilling also intercepted substantial iron mineralisation at
depth:
BEKD 51 From 135 metres to 203 metres
30.5% Fe
BEKD 53 From 144.7 metres to 249.3 metres 31.4% Fe
The true thickness in these holes were 78 metres and 105.5
metres of continuous iron mineralisation.
Figure 3: Northern Zone cross Section 7,612,300N
covering BEKD 20, BEKD 52 and BEKD 53
High-grade ~64% Fe at surface and continuous iron
mineralisation downdip to plus 270 metres
Central Zone
The Central Zone covers approximately 1.8 kilometres from
north to south and is some 300 metres across strike. The
Central Zone hosts a relatively flat, westerly dipping ore
body suitable for a low strip ratio open-pit mining operation.
In addition to identifying mineralisation that is readily
upgradeable, geological mapping indicates that there is a
consistent flat lying, surficial zone, measuring 50 metres to
70 metres in width, where weathering has upgraded the
average grade of the primary mineralisation, with some areas
potentially DSO.
Drill holes completed in this mineralisation were BEKD 03 to
BEKD 08 and BEKD 37 to BEKD 42.
Figure 2: Northern Zone cross Section 7,612,100N covering
drill holes BEKD 01, BEKD 19, BEKD 50 and BEKD 51.
Figure 4: Central Zone cross section along latitude
7611000 incorporating Bekisopa drill holes.
BEKD 03, BEKD 41 and BEKD 42
Akora Resources Annual Report 2022
7
Review of Activities
Drill holes BEKD 05 and BEKD 06 extend the width of the
mineralised strike to ~200 metres. Drill holes BEKD 04
and BEKD 05 both ended in mineralisation at 100.4 metres
downhole.
Figure 5: Central Zone cross section along latitude
7610800 incorporating Bekisopa drill holes.
BEKD 04, BEKD 05 and BEKD 06 from the 2020 drilling
programme and drill holes. BEKD 39 and BEKD 40 from
the 2021 drilling campaign
The Company also achieved iron mineralisation at depth in
several drill holes in the Southern Zone:
BEKD 46 From 16.1 meters to 178.9 meters
35.6% Fe
BEKD 43 From 35.8 metres to 185.4 meters
37.6% Fe
BEKD 59 From 23.1 metres to 173.9 meters
33.2% Fe
Figure 6: Southern Zone cross Section 7,608,450N. Highgrade ~60% Fe and ~61% Fe at surface in BEKD 18 and
BEKD 55 and at depth a continuous 150.8 metres iron
intercept at 33.2% Fe in BEKD 59.
Southern Zone
The Southern Zone covers an area of approximately 1.5
kilometres from the north to south and approximately 700
metres across strike and, like the other Zones, has potential to
achieve a large, near surface high-grade region with DSO as
well as readily upgradeable mineralisation.
In total, the Company completed 37 drill holes in the Southern
Zone. Twelve of the drillholes intersected the mineralisation
zone where it outcrops, and these have returned high-grade
intercepts from 61% Fe to 68% Fe from surface up to 14
metres downhole. These iron grades are DSO equivalent and
therefore, provide the potential for the Company to produce a
product that will only require mining, crushing and screening.
Several of the drillholes intersected high-grade outcrops:
BEKD 13 From surface to 14.6 metres
64.9% Fe
BEKD 31 From surface to 8.12 metres
68.2% Fe
BEKD 44 From surface to 5.9 metres
63.9% Fe
At depth, several drill holes recorded substantial iron
mineralisation grading 63%+ Fe including:
8
BEKD 45 From 56.8 metres to 67.8 meters
64.0% Fe
BEKD 46 From 68.1 metres to 87.6 meters
63.3% Fe
BEKD 46 From 88.9 meters to 102.2 meters
64.4% Fe
BEKD 56 From 22.8 meters to 30.3 meters
64.9% Fe
Akora Resources Annual Report 2022
Figure 7: Southern Zone cross Section 7,608,150N
demonstrating high-grade intercepts at surface and at
depth.
In early September 2022, the Company commenced an in-fill
drilling programme at the Southern Zone which was completed
on 24 October 2022.
The location of the in-fill drill holes was determined with
reference to the DSO assays from the 2020-2021 drilling and
further targets the near-surface eastern and western areas
in the Southern Zone where previous drilling intercepted
high-grade iron mineralization, (see Figure 8). In-fill drilling
programme was conducted on a 50-metre by 50-metre
grid. Drill hole depth ranged from 5.6 metres to 29.6 metres,
averaging 13.6 metres.
Review of Activities
Figure 8: The in-fill drilling grid on the eastern and western areas of the Southern
Zone. The drilling comprises 85 drill holes for 1,165 meters. Three extra drill holes were
incorporated into the campaign, in all an extra 315 meters, a 37% increase, than planned
was drilled.
Generally, mineralized intercepts were thicker than anticipated, hence an additional 315 metres
or 37% more meters were drilled than planned. The first batch of assay pulps is being prepared
for dispatch to ALS Perth, and when completed these results should produce a better-defined
DSO Resource for production planning.
Following are examples of the 2022 in-fill drill core at surface with encouraging iron
mineralisation believed suitable for DSO lump and fines iron ore products, Figures 9 (a) to (d).
Figure 9: Drill core from the
in-fill drilling showing highgrade iron mineralisation
as determined by magnetic
susceptibility reading of
>1000, these drill intercepts
appear to be between ~10
metres to ~14 metres thick.
Akora Resources Annual Report 2022
9
Review of Activities
METALLURGICAL TESTWORK REPORTED DURING THE FIRST-HALF
As part of the identification of a JORC Mineral Resource, the Company completed both Davis Test Tube (DTT) and wet Low
Intensity Magnetic Separation (wLIMS) testwork.
(DTT is a laboratory instrument designed to separate magnetic ores into strongly magnetic and weakly magnetic fractions. It
has become a standard laboratory test used for the assessment of the upgradeability of magnetic ores by magnetic separation
techniques. In laboratory wLIMS tests, the iron ores are process wet, to suppress dust, then pass over a rotating magnetic drum
separating the magnetic iron from non-magnetic material.)
The goal from these metallurgical tests is to better understand the upgradability of the iron mineralisation for the development of
a larger mining operation based on producing an iron concentrate.
The DTT and wLIMS testwork trials were undertaken on continuous drill core composites and intervals from surface to varying
depths downhole for a number of drill holes. Overall, the outcomes were excellent across all the drill holes.
wLIMS and DTT for BEKD 01 testwork generated the following results:
BEKD 01
COMPOSITE
SAMPLE
INTERVAL
(M)
FE
%
SILICA
%
ALUMINA
%
FE
%
SILICA
%
ALUMINA
%
FE
%
SILICA
%
ALUMINA
%
0 – 8.0
60.6
6.6
2.8
67.6
1.5
1.4
69.9
0.7
0.8
2
8.0 – 13.54
49.6
15.1
2.9
63.6
4.3
2.0
69.6
0.8
0.7
3
13.54 – 20.27
45.1
16.7
4.4
63.3
4.0
2.1
69.6
0.7
0.8
4
20.27 – 26.54
42.5
17.1
4.4
60.5
5.3
2.5
69.4
0.8
0.7
5
26.54 – 32.30
38.9
18.9
3.5
63.4
4.0
1.6
70.1
0.4
0.6
6
32.30 – 37.75
31.4
24.8
5.6
59.5
6.8
2.4
70.1
0.5
0.8
7
37.75 – 43.54
47.5
12.8
2.4
63.0
4.1
1.3
69.9
0.4
0.5
45.1
16.0
3.7
63.0
4.3
1.9
69.8
0.6
0.7
1
Average
HEAD GRADE
WLIMS IRON FINES GRADE
DAVIS TUBE TEST GRADE
Table 2: wLIMS/DTT Results from BEKD 01 Composite Sample
Testwork on drill hole BEKD 01 clearly indicates that the iron mineralisation is readily upgradable using wLIMS magnetic
separation to an average of 63% Fe after crushing to <2 mm, and then to 69.9% Fe after DTT processing at a -75 µm grind. This
premium high-grade at 69.8% Fe contains very low impurity levels of 0.5% Silica, 0.7% Alumina, 0.003% Phosphorous and 0.06%
Sulphur. Bekisopa represents a potential long-term producer of very clean, premium grade iron concentrate suitable for DRI pellet
production.
Similar metallurgical testwork was undertaken on the Central Zone at BEKD 04. Table 3 indicates that the average head-grades
varied from a high of 60.1% Fe to a low of 24.2% Fe (the lowest interval grade being 9.48% Fe) and that all composites were
upgraded to better than benchmark grade iron levels. The average DTT result for drill hole BEKD 04, from surface to 38.1 metre
downhole, was 70.2% Fe.
BEKD 04
COMPOSITE
SAMPLE
INTERVAL
(M)
FE
%
SILICA
%
ALUMINA
%
FE
%
SILICA
%
ALUMINA
%
FE
%
SILICA
%
ALUMINA
%
0 - 5.5
60.1
7.9
4.1
69.7
0.8
1.2
70.1
0.15
0.54
2
5.5 - 11.1
43.9
17.3
2.9
69.6
1.2
0.4
70.0
0.30
0.24
3
11.1 - 19.4
37.4
27.5
3.1
69.2
1.7
0.4
69.6
0.20
0.20
4
19.4 - 25.7
26.4
31.5
2.9
63.7
5.8
0.3
71.1
0.34
0.01
5
25.7 - 31.3
25.5
22.2
2.3
61.9
4.3
0.2
70.8
0.18
0.01
6
31.3 - 38.1
24.2
32.3
3.5
62.2
5.4
1.0
69.8
0.69
0.45
35.1
23.1
3.1
66.1
3.2
0.6
70.2
0.31
0.24
1
Average
HEAD GRADE
WLIMS IRON FINES GRADE
Table 3: wLIMS/DTT Results from BEKD 04 Composite Sample
10
Akora Resources Annual Report 2022
DAVIS TUBE TEST GRADE
Review of Activities
The Company also conducted metallurgical testwork on drill holes BEKD 10 and BEKD 34, located in the Southern Zone.
Processing trial results for BEKD 10, on the eastern side of the Southern Zone, from surface to 37.2 metres downhole showed this
mineralisation readily upgraded at a 2 mm crush to 62.4% Fe and at a 75-micron sizing to an outstanding 69.3% Fe. The same
metallurgical testwork on BEKD 34, on the western side of the Southern Zone, delivered 66.0% Fe after a 2 mm crush and 69.5%
Fe at a 75-micron sizing, all with substantial reduction in impurities.
These processing trials show the consistency of upgradability across the expansive Southern Zone and largely replicate the
results achieved on the Northern and Central Zones and therefore, along the main 5-kilometre strike length.
BEKD 34
COMPOSITE
HEAD GRADE
SAMPLE
INTERVAL
(M)
FE
%
1
0 – 4.9
2
4.9 – 10.43
3
4
WLIMS IRON FINES GRADE
DAVIS TUBE TEST GRADE
SILICA
%
ALUMINA
%
FE
%
SILICA
%
ALUMINA
%
FE
%
SILICA
%
ALUMINA
%
59.4
7.2
2.7
69.0
0.6
0.9
68.9
1.2
1.0
62.1
4.7
1.6
68.1
1.0
0.9
69.4
0.6
0.7
10.43 – 14.8
41.1
18.2
1.8
64.3
3.3
0.6
69.7
0.9
0.2
14.8 – 18.7
51.0
8.6
1.5
65.0
2.5
0.7
70.4
0.4
0.3
5
18.7 – 23.0
54.1
4.9
1.1
66.2
1.6
0.7
69.5
0.4
0.5
6
23.0 – 29.36
59.2
3.5
0.9
66.0
1.5
0.7
70.0
0.4
0.4
7
45.6
6.9
1.3
63.3
2.5
0.8
68.8
0.5
0.4
Average
53.2
7.7
1.6
66.0
1.9
0.8
69.5
0.6
0.5
Table 4: wLIMS/DTT Results from BEKD 34 Composite Sample
These outstanding iron concentrate grades, achieved at a relatively coarse 75-micron sizing, highlight the potential for Bekisopa
to be able to deliver DRI pellet grade iron concentrates to meet the growing demand for decarbonisation in the iron and steel
industry. Premium grade iron feed, with very low impurity levels as seen from BEKD 10 and 34, Table 7, is what is forecast to be
required to produce DRI pellets from natural gas or green hydrogen iron making processes. Bekisopa, is well placed to provide
these growing markets that have an abundance of natural gas, for example the Middle East, or those locations that will be
producing green hydrogen.
DTT conducted on BEKD 10 and BEKD 34 shows very high iron grades, averaging 69.4% Fe, with low impurities, Table 5.
AVERAGE
HEAD GRADE
DAVIS TUBE TEST GRADE
%
% FE
% SILICA
% ALUMINA
% PHOSPHORUS
% SULPHUR
BEKD 10
0 to 37.2
metres
47.9
69.3
1.1
0.8
0.062
0.006*
BEKD 34
0 to 34.8
metres
53.2
69.5
0.6
0.5
0.016
0.004*
Table 5: BEKD 10 and BEKD 34 DTT achieves premium grade iron levels, average 69.4% Fe, and low impurity levels from
surface to ~37 metres downhole.
Note *: A few high S assays at depth is likely due to the presence of pyrite.
Akora Resources Annual Report 2022
11
Review of Activities
SCOPING STUDY
SATROKALA PROSPECT
The Company retained WAI to prepare the scoping study for
the advancement of the Bekisopa project as a low-cost, DSO
mining, crushing and screening operation utilising the Mineral
Resource prepared by H&S Consultants.
The Company completed its first regional reconnaissance
exploration programme and the first rock chip sampling from
the 100% owned Bekisopa Southwest tenements, called
Satrokala. Satrokala is approximately 40 kilometres southwest
of Bekisopa PR 10430. In total, 102 rock chip samples were
collected, and assayed, and demonstrated very encouraging
assay results.
Three project scenarios were developed by WAI based on the
194.7 Mt Mineral Resource for the Company:
Scenario 1
DSO mining and processing of known DSO mineralisation
within the Inferred Mineral Resource
Production profiles were developed for a early-startup
operation with production (both lump and fines iron ore
products) ranging from 0.5 to 2.0 million tonnes per annum
(mtpa).
This scenario is the starting phase for each of the other two
scenarios:
Scenario 2
DSO production, as described in Scenario 1, followed by the
mining and producing of a high-grade crushed 2 mm fines
product.
Scenario 3
The sample locations cover a strike length of approximately
ten kilometres with a potential width of one kilometre within
tenements 27211 and 35827. The first rock chip assay results
ranged in iron grade from 16.3% up to 68.0% Fe and averaged
58.8% Fe. Excluding iron assays less than 58% Fe, the average
iron grade increases to an excellent 64.5% Fe.
Of the 102 rock chip assays, 89 samples delivered iron grades
greater than 50%, and an average of 62.1% Fe, the benchmark
iron grade. The 66 highest-grading samples delivered iron
grades from 58% to 68% Fe, with an average iron grade of
64.5% Fe. These are encouraging first iron results that indicate,
subject to the completion of systematic and successful
exploration activities, should add tonnes to the existing
AKORA’s flagship Bekisopa project.
The Satrokala tenements include PR 27211 and PR 35827 with
Figure 11 showing the location of these tenements and the 102
rock chip sample locations.
DSO production, as described in Scenario 1, followed by
mining and producing a premium grade concentrate at 75
microns.
The Bekisopa DSO project is relatively uncomplicated in
process with a low strip ratio mining operation designed to
produce both lump and fines iron ore products at better than
benchmark grades.
WAI concluded that the Bekisopa project has significant
potential and each of the above scenarios is worthy of further
consideration through the feasibility phase.
Figure 11: AKORA’s 100% owned Bekisopa Southwest
tenements, in an area called Satrokala. On the two
tenements, 35827 and 27211, are the location of the 102
rock chip samples.
12
Akora Resources Annual Report 2022
Review of Activities
Figure 12 shows specific rock chips and the countryside where the rocks were located. This shows lump iron rocks at surface that
are potentially high-grade iron ore lump product in an undulating barren to grassland area.
Figure 12: Location of rock chip sample TA468, assay number V2138, average iron grade 64.63%.
The directors present their report, together with the financial statements of AKORA Resources Limited (formerly Indian Pacific
Resources Limited) (ACN 139 847 555) (hereafter referred to as the “Company”), for the financial year ended 31 December 2022.
Akora Resources Annual Report 2022
13
Directors Report
Directors
Report
14
Akora Resources Annual Report 2022
Directors Report
PRINCIPAL ACTIVITIES
ENVIRONMENTAL ISSUES
The principal activities of the Company during the financial
year were exploration for iron ore in Madagascar. There was
no significant change in the nature of these activities during
the year.
The Company’s projects are subject to the laws and
regulations regarding environmental matters in Madagascar.
Many of the activities and operations of the Company cannot
be carried out without prior approval from and compliance with
all relevant authorities. The company conducts its activities in
an environmentally responsible manner and in accordance
with all applicable laws. However, the company could be
subject to liability due to risks inherent to its activities, such as
accidental spills, leakages or other unforeseen circumstances.
OPERATING RESULTS, REVIEW OF
OPERATIONS FOR THE YEAR AND
SIGNIFICANT CHANGES IN STATE OF
AFFAIRS
The net loss after tax attributable to shareholders of AKORA
Resources Limited of $1,051,025 for the year ended 31
December 2022 (the net loss after tax for the previous
financial year was A$1,077,391).
DIVIDENDS
OVERVIEW
The Company expended $3,445,007 during the financial year
on exploration and evaluation of the Bekisopa project. The
expenditure represents more than 75.4% of total expenditure
for the year.
The board of directors accelerated 2022 expenditure during
the financial year to take advantage of economies of scale
following significant exploration success at Bekisopa PR 10430.
No dividends were declared and paid during the year.
EVENTS AFTER BALANCE DATE
On 23 March 2023, the Company released on the ASX
platform the results from its infill drilling programme conducted
at the Bekisopa project and specifically the Southern Zone.
The Company completed 86 drill holes as part of the infill
drilling programme with every drill hole intercepting iron
mineralisation. 72 drill holes intercepted high-grade ion
mineralisation within the weathered zone and at surface with
the final assays clearly indicating the intercepts have the
potential for DSO lump and fines products. The goal of the
infill drilling programme wasto increase both the size and the
confidence in the Mineral Resource.
The financial performance of the Company since its listing
on the ASX isa follows:
31 DECEMBER
2022
2021
2020
1,051,025
1,077,391
1,456,540
Earnings percent (cents)
(2.18)
(1.77)
(3.76)
Share price at balance
date (cents)
17
24
35
Net loss after tax
The highest intercepts are set out below:
DRILL HOLE
NUMBER
INTERCEPT FROM
SURFACE (M)
WEIGHTED
% IRON
BEKD090
9.80
66.27
BEKD092
11.20
66.05
BEKD132
11.59
66.00
BEKD091
9.72
65.25
BEKD081
9.10
65.10
Akora Resources Annual Report 2022
15
Directors Report
INFORMATION ON DIRECTORS
The following persons were the directors in office during the period 1 January 2022 to 31 December 2022 and since year-end
unless otherwise stated:
MH Stirzaker
PG Bibby
JM Madden
Independent Non-executive Chairman
Chief Executive Officer and
Managing Director
Executive Director and
Company Secretary
Qualifications: BCom, CA
Qualifications: Dip App Sc (Secondary
Metallurgy), B App Sc (Metallurgy)
Qualifications: BCom (Melb) FCPA FGIA
FTIA
Experience:
Experience:
Mr Bibby was appointed to the board of
directors on 9 July 2015 and appointed
CEO/Managing Director on 1 January
2020.
Mr Madden was appointed to the board
of directors on 6 October 2009 and is
the founder of the Company.
Experience:
Mr Stirzaker was appointed to the board
of directors on 22 August 2022.
Mr Stirzaker has over 30 years’
commercial experience, mainly in
mining finance and mining investment.
Mr Stirzaker began his career in Sydney
as a Chartered Accountant with KMPG
before moving into investment banking
with HSBC Group and then Kleinwort
Benson in London.
From 1993 to 2007, Mr Stirzaker was
part of the natural resource advisory
and investment firm, RFC Group, where
he became Joint Managing Director.
From 2010 until 2021, Mr Stirzaker was
a partner with the private equity mining
fund manager, Pacific Road Capital.
Interest in shares and options:
500,000 ordinary shares indirectly held
in the Company.
Directorships held in other listed
entities in last 3 years:
Base Resources Ltd since 19 November
2014 and Chairman from 26 November
2021; Firestone Diamonds plc since
22 July 2019 (until delisted on 20 March
2020); Prodigy Gold NL from
3 December 2018 to 1 December
2021; and Southern Palladium Ltd from
incorporation on 4 December 2020
and from 8 June 2022 on listing on
ASX and JSE.
Mr Bibby is a metallurgist with over 35
years’ experience in both mining and
metals industries. Mr Bibby worked
for 23 years with Rio Tinto Limited
(formerly CRA Limited) in various
operational, technological, and business
development roles.
With Rio Tinto, Mr Bibby held various
operational roles at Rio Tinto Aluminium
(formerly Comalco), Kaltim Prima Coal
and Rio Tinto Iron Ore (Hamersley Iron).
At Trio Tinto Iron Ore, Mr Bibby was
manager of metallurgy at both Dampier
and Paraburdoo.
Mr Bibby joined Zinifex Limited in
2004 as General Manager-Technology
and then played a leading role in
the merging of Umicore and Zinifex
smelting businesses to form Nyrstar
and became Chief Development Officer
based in London.
On returning to Australia, Mr Bibby
was appointed Managing Director of
OceanaGold Corporation and following
OceanaGold, Mr Bibby performed
various consulting roles.