Bekisopa Drilling Campaign Completed
Released
Released
Announcement PDF
ASX Release
17 November 2021
BEKISOPA DRILLING CAMPAIGN COMPLETED
SIGNIFICANT IRON MINERALISATION CONTINUES AT DEPTH
AKORA Resources (“AKORA” or “the Company”) (ASX Code: AKO) is pleased to report to
shareholders that the 2021 drilling campaign was completed on 13th November 2021. In total
5,110 metres of drilling have been completed since mid-June and a total of 1,027 meters in
the last six drill holes, confirming multiple and extensive iron mineralisation is present. In total
51 diamond drill holes have been completed over 2021.
Highlights:
51 drill holes for 5,110 metres drilled in the 2021 drilling campaign with 63 drill
holes for 6,200 metres completed over 2020 and 2021.
➢ 17 drill holes over 100m deep, downhole
➢ Last six drill holes*, BEKD58 to BEKD63 in the south, suggest significant
thicknesses of iron mineralisation in this area as these holes ended after
passing through iron mineralisation at good depths
BEKD61 ended at 204.33 metres
BEKD58 ended at 172.85 metres
BEKD59 ended at 186.34 metres
➢ Volume of data collected and to be validated along with continuing
Covid-impact on logistics from Madagascar (via Europe) to Australia will
result in a delay to release of JORC Resource
Webinar invitation
Paul Bibby will discuss drilling program results and outlook
Webinar Registration
When:
Thursday 18th November
Time:
12.30pm AEDT/9.30am WA
Register to join here:
https://us02web.zoom.us/webinar/register/WN_ptL0ZFaTS9GQqfPGqLkV8w
Note: * these drilling results are from the initial drilling logs and need to be confirmed by the geological logging.
Bekisopa 2021 Drilling Campaign Completed
Drilling at AKORA’s flagship Bekisopa prospect was completed on the 13th of November
almost five months after drilling started in June. The drilling program has been an outstanding
success, with assays received to date confirming excellent iron grades near surface and drill
logging plus magnetic susceptibility readings identifying good iron mineralisation at depth (see
ASX releases 20 July, 17 August, 14 September, 23 September, 19 October, 3 November and
9 November 2021).
The 2021 drilling campaign was expanded from the initial 4000m to around 5000m as the
drilling continued to intercept iron mineralisation at surface and at depth along the six-kilometre
strike length. The decision to extend the drilling was to maximise the benefit from the costs of
mobilising the camp, setting up for drilling, geological logging and associated facilities, and
increase the probability that the drilling along and across the six-kilometre strike length could
lead to a significant maiden JORC Resource estimation. The additional drilling and analytical
work have accelerated the proposed 2022 work programme.
The drilling campaign highlights have been many and completing the mobilisation and drilling
continuously over five months without a safety incident and only one day lost for mechanical
issues is an excellent outcome. The quality of the drilling with drill hole recoveries averaging
97% and the last 6 holes averaging 99% recovery, indicate good drilling practices and we
have been very pleased with the teams we work with in Madagascar.
The drilling team and equipment will be demobilised in the coming days. This will enable the
completion of the logging and DGPS pick-up of the drill holes. The extension of the drilling
programme and the number of deep drill holes intercepting iron mineralisation, has resulted
in a significant increase in related geological logging, magnetic susceptibility measurements
and drill core splitting to be completed at site before the samples can be transported to
Antananarivo for sample preparation. It is expected that the geological team will be at site
until around 25 November to complete the logging of the last drill holes, approximately 1,027
metres of drill core from the last six drill holes remaining to be processed. A significant
proportion of those metres being iron mineralisation observed in initial drilling reports. This
observed iron mineralisation will require confirmation through geological logging and magnetic
susceptibility measurements.
AKORA Resources Managing Director Paul Bibby commented on the Bekisopa Resource
drilling campaign:
“I have to say that in all my experience in iron ore exploration and development I have never
been more excited with a project as I have become with Bekisopa. The grades, the depth, the
extent, the quality of the iron mineralization and how readily upgradable the iron looks to be,
has all been even better than what I anticipated.
During one of the most trying periods in decades, we have completed an extensive and hugely
successful campaign of drilling discovery and now, with the amount and analysis of the data,
I’m confident that AKORA will deliver a good maiden JORC Resource. I must make mention
of the Madagascar teams we’ve been working with on site and commend them on their
professional attention and the excellent work carried out. I’m looking forward to delivering a
very successful year ahead to all AKORA shareholders in 2022.”
Conclusion
The 2021 drilling campaign has been completed successfully, with excellent drilling intercepts,
down to 250 metres downhole (approximately 200m below surface) and with downhole width
of up to 138 metres (see ASX Announcement 9 November 2021). There have been
outstanding very high-grade assay results already reported and significant intercepts, at
surface, of 8.2m at 68.2%Fe and 4.5m at 65.5%Fe which is potentially DSO quality.
Due to the extensive body of iron mineralisation being defined through the drilling campaign,
particularly in the past months of deep drilling, there is now a substantial backlog of geological
logging, magnetic susceptibility measurements, photographing of the drill core and drill core
splitting to be completed at the Bekisopa site.
Due to the volume of data collected during the drill campaign, combined with delays during
the height of the Covid pandemic affecting logistics from Madagascar into Europe and then to
Australia means that despite all efforts the Bekisopa JORC Resource is unlikely to be
completed by the end of this year. The board of directors has considered the current schedule
and taking into account the Christmas/New Year period, the Company is now expecting the
JORC Resource will be released during the first quarter of 2022.
Webinar
Paul Bibby will conduct a Webinar Presentation to outline the highlights of the Bekisopa drilling
campaign and the outlook for the Company.
Webinar Registration
When:
Thursday 18th November
Time:
12.30pm AEDT/9.30am WA
Register to join here:
https://us02web.zoom.us/webinar/register/WN_ptL0ZFaTS9GQqfPGqLkV8w
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Peter Taylor
Investor Relations
Phone +61(0) 412 036 231
Peter@nwrcommunications.com.au
About AKORA Resources
AKORA Resources (ASX: AKO) is an exploration company engaged in the exploration and
development of the Bekisopa Project, the Tratramarina Project and the Ambodilafa Project,
iron ore projects in Madagascar, in all totaling some 308 km2 of tenements across these three
prospective exploration areas. Bekisopa Iron Ore Project is a high-grade magnetite iron ore
project of >4km strike and is the key focus of current exploration drilling and resource
modelling.
Competent Person’s Statement
The information in this report that relates to Exploration Targets, Exploration Results, and related
scientific and technical information, is based on, and fairly represents information compiled by Mr
Antony Truelove. Mr Truelove is a consulting geologist to Akora Resources Limited (AKO). He is a
shareholder in Akora Resources Limited, holding 4,545 Shares he purchased in 2011, some 8 years
prior to being engaged as a consultant. Mr Truelove is a Member of the Australasian Institute of Mining
and Metallurgy (MAusIMM) and a Member of the Australian Institute of Geoscientists (MAIG). Mr
Truelove has sufficient experience which is relevant to the styles of mineralisation and types of deposits
under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the JORC Code. Mr Truelove consents to the inclusion in this report of the matters based
on his information in the form and context in which it appears including sampling, analytical and test
data underlying the results.
Competent Person’s Statement
The information in this report that relates to Mineral Processing and related scientific and technical
information, is based on, and fairly represents information compiled by Mr Paul Bibby. Mr Bibby is a
Metallurgist and Managing Directors of Akora Resources Limited (AKO), as such he is a shareholder in
Akora Resources Limited. Mr Bibby is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Bibby has sufficient experience which is relevant to the styles of mineralisation and its
processing under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the JORC Code. Mr Bibby consents to the inclusion in this report of the matters
based on his information in the form and context in which it appears including analytical, test data and
mineral processing results.
Authorisation
This announcement has been authorised by the AKORA Resources Board of Directors on
17 November 2021.
JORC Code
Table 1 Section 1 Sampling Techniques and Data
BEKISOPA PROJECT
Criteria
Sampling
techniques
Drilling
techniques
JORC Code explanation
• Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g., ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (e.g., core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g., core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit, or
other type, whether core is oriented and if so, by
what method, etc).
Commentary
• Diamond core (HQ or NTW) is split in half using a core saw or splitter (if clayey or
rubbly). A consistent half of the core is broken with a hammer and bagged prior to
dispatch to the preparation laboratory in Antananarivo. Sample interval is
nominally 1m down hole but with samples terminated at lithological boundaries.
• All drilling is diamond core drilling using either NTW (64.2mm inner diameter) or
HQ (77.8mm inner diameter) coring equipment. The holes are generally collared
using HQ and changed to NTW between 3m and 25m downhole. Core is not
orientated. All drillholes are surveyed every 10m using a Reflex EZ-Gyro
gyroscopic multi-shot camera. No surveys to date have varied more than 5° from
the collar survey in either azimuth or declination.
Criteria
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
JORC Code explanation
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Commentary
• Average core recovery is 97% but may be lower in the rubbly part of the
weathered zone. Several one metre intervals returned low recoveries due to
rubbly material. All other intervals gave good recovery, with close to 100% in
fresh rock.
• If core, whether cut or sawn and whether quarter,
half or all core taken.
• If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
• For all sample types, the nature, quality, and
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• All core was fitted together so that a consistent half core could be collected,
marked up with a “top” line (line perpendicular to dip and strike, or main foliation),
• A set of standard operating procedures for drilling and sampling were prepared by
the company and Vato Consulting, who supervised the programme, and these
were always adhered to.
• During drilling, checks and verifications of the accurate measurement of
penetration depth of drill hole cores were made and observations and recording of
the colour of the water / mud rising from the drill hole were made.
• All drill core was logged quantitatively using industry standard practice on site in
enough detail to allow mineral resource estimates as required.
• Logging included: core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally magnetite or
hematite), mineralisation style, mineralisation %, structure, magnetic susceptibility
(see below), pXRF readings (see below), notes (longhand).
• All core was photographed both wet and dry and as both whole and half core.
• All core was geotechnically logged and RQD’s calculated for every sample
interval.
• All drill-holes were logged using a magnetic susceptibility meter to enable
accurate distinction of iron (magnetite) rich units and to potentially differentiate
between magnetite and hematite rich mineralisation.
• Density measurements were made using both the Archimedes method (mainly
fresh rock) and the Caliper Vernier (mainly regolith) methods.
Criteria
JORC Code explanation
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Commentary
sample intervals decided and marked up and the core subsequently split in half
using a core saw, separating samples into the marked-up intervals. If the core
was clayey or rubbly, it was split in half using a hammer and chisel. The intervals
were nominally 1m, but smaller intervals were marked if a change in geology
occurred within the 1m interval.
• The half core sample intervals were put into polythene bags along with a paper
sample tag. This was then sealed using a cable tie and placed into a second
polythene bag with a second paper tag and this was sealed using staples.
• The samples were subsequently transferred at regular intervals to the sample
preparation facility in Antananarivo (OMNIS) where they will undergo the following
preparation:
o Sorting and weighing of samples
o Drying at 110-120°C until totally dry
o Weighing after drying
o Jaw crushing to 2mm
o Riffle split and keep half as a reference sample
o Collect a 100g sub-sample of 80% passing 2mm material and store
this
o Pulverise to minus 75 micrometres
o Clean ring mill using air and silica chips
o Riffle split and sub-sample 2 sets of 100g pulps
o Store reject pulp
o Conduct a pXRF reading on the minus 75 micrometre pulp
o Weigh each of the sub-samples (minus 2mm, 2 x minus 75
micrometres) and store in separate boxes for ready recovery as
needed
• All assays have been undertaken by ALS in Perth, Australia, using their standard
iron suite. QAQC includes standards, blanks, and duplicates. These are all within
tolerance limits.
Criteria
Verification
of sampling
and
assaying
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
JORC Code explanation
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing, and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
• If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Commentary
• As this is the first drilling into the project, no twinning is necessary. All data is
entered on site and checked by consultants Vato Consulting before being entered
into an Excel database and sent to Akora.
•
All drill hole collars have been provisionally located using a hand-held GPS (+/-5m
accuracy). Final collars will be picked up at completion of the drilling program.
• All 2020 drillholes have been surveyed using DGPS.
• The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
• Topographic control is country wide data only. An accurate topographic survey
will be undertaken prior to any resource estimation.
• Data spacing is planned to be at 200m x 50m drill spacing which is considered
reasonable for the style of mineralisation being intersected. In several areas with
significant surficial mineralisation, drill-hole density has been closed up to 100m x
50m.
• All samples are assayed as individual, less than 1m long intervals. Composites of
selected intervals will be tested using wet and dry, low intensity magnetic
separation (LIMS).
• The ironstone unit has a strong north-south trend and drilling is generally oriented
to the east. The outcrops, trenches and magnetics all show a steep to shallow
westerly dip and hence the drill direction is considered to be optimal. The drilling
in the south was interpreted as being synclinal in nature with tonnage potential
limited to the keel of the syncline. However, it has been found that the structure is
an orocline and that mineralisation continues at depth in this area. Mineralisation
in the SW zone appears to be sheet-like at present but additional drilling is
required to confirm the true morphology in this location. A single hole oriented to
Criteria
JORC Code explanation
Commentary
the west in the far south of the tenement suggests the sequence is dipping to the
east here, suggesting an anticlinal structure in this area.
• No sample bias is evident.
Sample
security
• The measures taken to ensure sample security.
• Chain of Custody procedures are implemented to document the possession of the
samples from collection through to storage, customs, export, analysis, and
reporting of results. Chain of custody forms are a permanent records of sample
handling and off-site dispatch.
• The on-site Geologist is responsible for the care and security of the samples from
the sample collection to the export stage. Samples prepared during the day are
stored in the preparation facility in labelled sealed plastic bags.
• The Chain of Custody form contains the following information:
• Sample identification numbers;
• Type of sample;
• Date of sampling;
• List of analyses required;
• Customs approval;
• Waybill number;
• Name and signature of sampling personnel;
• Transfer of custody acknowledgement.
• Samples are delivered to the analytical laboratory by courier. A copy of the Chain
of Custody form is signed and dated and placed in a sealable plastic bag taped on
top of the lid of the sample box. Each sample batch is accompanied by a Chain of
Custody form.
• One box of samples was incorrectly sent to ALS Ireland and one to ALS Perth
rather than the other way around. The laboratory subsequently sent the one box
from Ireland to Perth and the box incorrectly sent to Perth was assayed in Perth.
No tampering of either of these boxes was observed.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
• No audit has been conducted.
JORC Code
Table 1 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Mineral
tenement
and land
tenure
status
JORC Code explanation
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
Commentary
• The Company completed the acquisition of the minority interest in Iron Ore Corporation of
Madagascar sarl held by Cline Mining Corporation on 5 August 2020.
• The Company holds through Iron Ore Corporation of Madagascar sarl, Universal Exploration
Madagascar sarl and a Farm-in Agreement 12 exploration permits in three geographically
distinct areas. All administration fees due and payable to the Bureau du Cadastre Minier de
Madagascar (BCMM) have been and accordingly, all tenements are in good standing with the
government.
• The tenements are set out in Table 3.1 below
Project ID
Tratramarina
Ambodilafa
Bekisopa
Tenement
Holders
Permi
t ID
Per
mit
Typ
e
Num
ber
of
Block
s
UEM
16635
PR
144
UEM
16637
PR
48
UEM
RAKOTOA
RISOA
RAKOTOA
RISOA
17245
PR
160
18379
PRE
16
18891
PRE
48
MRM
6595
PR
98
MRM
13011
PR
MRM
21910
IOCM
Grantin
g Date
Expiry
Date
Submi
ssion
Date
Actual Status
Last Payment of
Administration
Fees
23/09/20
05
23/09/20
05
10/11/20
05
11/01/20
06
18/11/20
05
22/09/2
015
23/09/2
015
09/11/2
015
11/01/2
014
17/11/2
013
04/09/2
015
04/09/2
015
04/09/2
015
27/03/2
012
27/03/2
012
under renewal process
2021
under renewal process
2021
under renewal process
under transformation to
PR
under transformation to
PR
2021
33
20/05/20
03
15/10/20
04
19/05/2
013
14/10/2
014
08/03/2
013
07/08/2
014
under renewal process
2021
2021
12/07/2
015
under renewal process
under substance
extension and renewal
process
PR
3
23/09/20
05
22/09/2
015
10430
PR
64
26532
PR
768
04/03/20
04
16/10/20
07
03/03/2
014
03/02/2
019
28/11/2
013
under renewal process
2021
relinquished
2018
2021
2021
2021
Criteria
JORC Code explanation
Commentary
35828
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration
by other parties.
Geology
• Deposit type, geological setting, and style
of mineralisation.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
•
RAZAFIND
RAVOLA
PR
80
27211
PR
128
35827
PR
32
3757
PRE
16
16/10/20
07
16/10/20
07
23/01/20
07
26/03/20
01
03/02/2
019
23/01/2
017
23/01/2
017
25/11/2
019
20/01/2
017
20/01/2
017
relinquished
2018
under renewal process
2021
under renewal process
Transfer from IOCM
Gerant to AKO
2021
2021
• Exploration has been conducted by UNDP (1976 - 78) and BRGM (1958 - 62). Final reports on
both episodes of work are available and have been utilised in the recent IGR included in the Akora
prospectus. Airborne magnetics was flown for the government by Fugro and has since been
obtained, modelled, and interpreted by Cline Mining and Akora.
• The tenure was acquired by AKO during 2014 and work since then has consisted of:
o Data compilation and interpretation;
o Confirmatory rock chip sampling (118 samples) and mapping;
o Re-interpretation of airborne geophysical data;
o Ground magnetic surveying (305-line kilometres);
o The 2020 drilling programme of 1095.5m diamond core drilling in 12 drill-holes.
o The current programme that to date includes 5,110 in 51 drillholes (BEKD13 to 63)
• The recent drilling has shown that the surface mineralisation continues at depth, with at most a
25% increase in grade due to weathering effects. However, it should be noted that some
downslope creep of scree from these units may exaggerate apparent width at surface.
• The mineralisation occurs as a series of magnetite bearing gneisses and calc-silicates that occur
as zones between 50m and 150m combined true width.
• The mineralisation occurs as layers of massive magnetite (sometimes altered to hematite)
between 1m and 7m true width plus a lower grade zone that consists of lenses, stringers,
boudins and blebs of magnetite aggregates that vary from 1cm to 10’s of cm wide within a calcsilicate/gneiss unit (informally termed “coarse disseminated” here). These units sometimes have
an outer halo of finer disseminated magnetite (informally termed “disseminated” here).
• This wide mineralisation halo provides a large tonnage potential over the 6-7km strike of mapped
mineralisation and associated magnetic anomaly within the Akora tenement.
• The bands and blebs of massive magnetite aggregates along with preliminary LIMS testwork
suggest that a good iron product may be obtained using a simple crush to -2mm followed by
magnetic separation.
• All drill information being reported as part of the current press release is presented in the table
below:
Criteria
JORC Code explanation
including a tabulation of the following
information for all Material drill holes:
o Easting and northing of the drill hole
collar;
o Elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar;
o Dip and azimuth of the hole;
o Down hole length and interception
depth; and
o Hole length.
• If the exclusion of this information is
justified on the basis that the information is
not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Commentary
CollarID
BEKD01
BEKD02
BEKD03
BEKD04
BEKD05
BEKD06
BEKD07
BEKD08
BEKD09
BEKD10
BEKD11
BEKD12
BEKD13
BEKD14
BEKD15
BEKD16
BEKD17
BEKD18
BEKD19
BEKD20
BEKD21
BEKD22
BEKD23
BEKD24
BEKD25
BEKD26
BEKD27
BEKD28
Utm38sX
Utm38sY
Elev_m
Azm_deg Inc_deg Length_m
586079.1
7612150
881.57
0
-90
80.54
586159.7
7611699
878.75
90
-60
80.48
586348.6
7611000
872.47
90
-60
100.47
586448.8
7610800
869.83
90
-60
100.49
586368.9
7610799
862.45
90
-60
100.45
586549.3
7610801
871.29
90
-60
60.4
586722.9
7609301
842.3
90
-60
70.5
586822.7
7609300
853.71
90
-60
100.44
586749.3
7608150
862.81
90
-60
100.46
586798.6
7608150
865.33
90
-60
100.43
586848.8
7608150
868.22
90
-60
100.44
586899
7607600
868.86
90
-60
100.42
586903.6
7608150
877.32
90
-60
30.3
586648.6
7608151
858.32
90
-60
107.35
586899.3
7607999
875.91
90
-60
30.23
586798.4
7608000
873.45
90
-60
70.3
587099.9
7608299
893.48
90
-60
50.24
587108.1
7608450
890.82
90
-60
50.24
586099.1
7612099
882.88
90
-60
80.32
586000.7
7612298
854.23
90
-60
80.32
585902.7
7612500
850.93
90
-60
80.3
585700.2
7612700
879.09
90
-60
80.24
586148.7
7611900
889.56
90
-60
53.35
586097.8
7611899
879.24
90
-60
80.37
586178.2
7611701
880.68
90
-60
59.32
586198.3
7611701
882.07
90
-60
49.26
586219.5
7611701
883.35
90
-60
30.32
586350.2
7607799
852.28
90
-60
30.27
Criteria
JORC Code explanation
Commentary
BEKD29
BEKD30
BEKD31
BEKD32
BEKD33
BEKD34
BEKD35
BEKD36
BEKD37
BEKD38
BEKD39
BEKD40
BEKD41
BEKD42
BEKD43
BEKD43A
BEKD44
BEKD45
BEKD46
BEKD47
BEKD48
BEKD49
BEKD50
BEKD51
BEKD52
586297.2
586347.6
586299.4
586349.6
586299.3
586349
586298.7
587000.5
586599.8
586548.3
586498.2
586405.9
586398
586427.9
586549
586551
586700
586603
586597
586692
586801
586903
586003
585900
585903
7607800
7607900
7607900
7607999
7608000
7608100
7608100
7607600
7610600
7610600
7610798
7610801
7611001
7611000
7608151
7608151
7608001
7608002
7608300
7608301
7608300
7608297
7612100
7612101
7612299
851.5
853.18
853.07
849.42
851.44
843.08
844.15
874.57
873.35
872.09
871.69
866.33
876.79
878.77
860*
859*
879*
871*
852*
857*
862*
883*
865*
848*
861*
90
90
90
90
9