11 December 2024
ASX RELEASE
PFS Update
Test work confirms Bekisopa Direct Ship Iron Ore
Lump and Fines proportions.
Highlights
• 71% Iron Ore Fines and 29% Iron Ore Lump product proportions determined from Mineral
Processing trials.
• Lump product grade averaged 65% Iron, and
• Fines product grade averaged 61% Iron, from a 62% iron average feed grade.
AKORA Resources Ltd (ASX: AKO) (“AKORA” or “Company”) is pleased to provide a Pre-Feasibility
Study update on its Bekisopa Iron Ore Project in Madagacar.
As part of the mineral processing tests performed by Wardell Armstrong International (now a part of
the global SLR Consulting group) to confirm parameters for the Pre-Feasibility Study (PFS), crushing
and screening tests were performed on 12 representative feed grade samples from across the drilled
Bekisopa iron ore deposit.
The results showed that from an average 62% iron feed grade the Lump product average grade was
65% iron and was 29% of the product mass produced, while the Fines averaged 61% iron and was
71% of the product mass produced. These results are encouraging as it shows the high-grade potential
for the direct ship iron ore (DSO) from the near surface weathered zone mineralisation.
The earlier component of mineral processing test work, on these 12 composites, investigated rock
hardness and abrasion characteristics. This showed the Bond Crusher Work Index results ranged
from 3 to 4.3 kWh/t, which gives a crushability classification of very easy and is under Industry
averages. Bond Abrasion Index results ranged from 0.01 to 0.28 which fall in the range of nonabrasive to slightly abrasive. These results were reported in AKO’s ASX Announcement on 24
October 2024. These results indicate that less energy is required to break the rocks and should
result in lower wear on mining and processing equipment, reducing potential operating and
maintenance costs and reducing the crushing and screening equipment size.
The crushing / screening trials to define Lump and Fines splits continue to confirm positive mineral
processing outcomes for the Bekisopa PFS.
AKORA’s Managing Director, Paul Bibby said “The ongoing work streams for the PFS continue
to show encouraging results and build on the positive Scoping Study outcomes reported in
November 2023. The Lump and Fines split confirms that our stage 1 high-grade Bekisopa iron ore
project should be able to deliver two DSO products to blast furnace steel makers. The Lump iron
ore product is the preferred blast furnace feed material and these results indicate that the
Bekisopa product should achieve both a Lump and grade premium for this Lump product.”
Introduction:
The 12 crushing and screening test work samples to determine the iron ore product types and
grades were prepared from compositing numerous drill core sections (Appendix 2) from across
the Bekisopa resource area. The sample locations are listed in Table 1.
DSO metallurgical samples
Number
Weight kg
Prospect
MET SAMPLE #1
MET SAMPLE #2
MET SAMPLE #3
MET SAMPLE #4
60.43
58.80
71.51
58.08
Northern Zone
Northern Zone
Central Zone
Southern Zone (West)
MET SAMPLE #5
MET SAMPLE #6
54.32
58.00
Southern Zone (West)
Southern Zone (West)
MET SAMPLE #7
MET SAMPLE #8
55.53
55.34
Southern Zone (East)
Southern Zone (East)
MET SAMPLE #9
MET SAMPLE #10
54.11
56.35
Southern Zone (East)
Southern Zone (East)
MET SAMPLE #11
MET SAMPLE #12
53.10
54.34
Southern Zone (East)
Southern Zone (East)
689.91
Table 1: Bekisopa DSO Composite Sample Details and Locations.
The average head grade of the 12 composites is 62.3% iron with 5.1% silica and 2.9% alumina.
After crushing and screening, the proportion of Lump product (sizing >6.3mm and <31.5mm), was
28.5%, with an average grade of 65.2% iron with 2.5% silica and 1.6% alumina (Figure 1). This
should be considered a very clean high-grade Lump iron ore product (Figure 2). The Lump product
grades ranged from 60.2% to 68.5% iron which, during operations, could be blended to deliver an
average 65% iron grade Lump product.
The Fines proportion from the crushing and screening trials is 71.5% (sizing <6.3mm) (Figure 1),
at an average grade of 61.4% iron with 5.9% silica and 3.3% alumina, both within typical traded
specifications, refer to Figure 2 for the Fines iron grades. The Scoping Study had assumed Lump
product at 40% and Fines product at 60% mass with both at 62% iron grade.
There is, however, the potential to further improve the average Fines grade by passing the Fines
fraction through a magnetic separation stage. This will be examined for inclusion into the PFS.
Figure 1. Proportions of lump and fines iron ore post crushing and screening trials. Average Mass
Split of 28.5% Lump product and 71.5% Fines product.
2
(a)
(b)
Figure 2 (a) the Lump iron ore product grades post crushing and screen trials show an average
Lump grade of 65.2% iron. Figure 2 (b) the Fines iron ore product grades post crushing and
screening trials show an average Fines grade of 61.4% iron, both from a feed grade of 62.3% iron.
X-ray diffraction assessments were performed on the 12 composite samples to determine the
proportions of magnetite, hematite and goethite, the main forms of iron ore minerals at Bekisopa.
Samples 1 to 6 were predominately magnetite, which correlates well with the ground magnetic
readings and field observations. Samples 7 to 12, while averaging 58% magnetite, also contained
an average of 20% hematite and 19% goethite, which may explain why the ground magnetic
readings in the Southern Zone are variable across that area when drill result assays and field
observations indicate the presence of high grade iron mineralisation.
Financial Assessment:
The Scoping Study announcement of 14 November 2023 used a long-term Benchmark iron ore
price of US$100/t, a lump premium of US$12/t, without assigning premiums or penalties for product
iron grades. The grade premium or penalty for +/- 1% iron grade, against Benchmark grade of 62%
iron, range is typically from US$3 to 6/t while the typical lump premium is US$12/t. (reference Platts
IODEX 62% Fe (CFR China))
Considering the Bekisopa iron ore products contain 29% Lump at 65% iron and 71% Fines at 61%
iron, this product mix at typical market terms as above is expected to maintain scoping study
financial considerations.
Conclusions:
PFS crushing and screening trials demonstrate that the Bekisopa project iron ore product mix will
contain 29% Lump and 71% Fines product at grades of 65% iron for Lump product and 61% iron
for the Fines product. The higher grade Lump product should be a preferred blast furnace feed.
Next Steps:
•
Include the product mix into the PFS product quality and financials assessment.
•
Complete magnetic separation upgrade trials on the fines product materials to determine if
there is the potential to improve the Fines iron grade.
3
This announcement has been authorised by AKORA Resources Ltd’s Board of Directors.
For further information please contact:
Paul G Bibby
Managing Director
Phone +61(0) 419 449 833
www.akoravy.com
Gareth Quinn
Investor Relations
Phone +61(0) 417 711 108
gareth@republicpr.com.au
Competent Persons Statements
The information in this statement that relates to metallurgical test work is based on information compiled by
Mr James Turner – BSc (Hons), MSc, ACSM, MCSM, CEng, MIMMM, and is a full-time employee of Wardell
Armstrong International. Mr. Turner is a registered Chartered Engineer and Member of the Institute of
Materials, Minerals and Mining (MIMMM). Mr Turner has sufficient experience which is relevant to the style
of mineralisation and metallurgical test work under consideration and the activity being undertaken to qualify
as a Competent Person as defined in the Note for Mining Oil & Gas Companies, June 2009, of the London
Stock Exchange and the 2012 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’ (JORC Code). Mr. Turner consents to the inclusion of the information in this
release in the form and context in which it appears.
4
Iron ore for tomorrow’s steel-making
AKORA Resources Ltd (ASX: AKO) is an Australian resources company focused on the
development of four high-grade iron ore projects in Madagascar.
The Company’s flagship Bekisopa Iron Ore Project has a 194.7 million tonne (mt) Inferred JORC
Resource (ASX Announcement 11 April 2022) with very low impurities able to produce a premiumpriced +68% Fe concentrate. Direct Reduced Iron-Electric Arc Furnace (DRI-EAF) technology which
is used to make greener steel without coal and considerably less carbon emissions requires iron
ore grades of at least 67%.
To generate cash in the near-term, AKORA is advancing plans at Bekisopa to produce up to 2Mt
per annum over the first five years of a 60% Fe average grade direct shipping ore (DSO) (ASX
Announcement 14 November 2023) for shipping to Blast Furnace-Basic Oxygen Furnace (BF-BOF)
steelmakers.
The Company confirms that it is not aware of any new information or data that materially affects the above and that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed.
5
Appendix 1: JORC Summary
JORC Code, 2012 Edition - Table 1 - Bekisopa Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
•
•
•
•
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire assay’). In other cases, more
explanation may be required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types (eg submarine
nodules) may warrant disclosure of detailed information.
Commentary
•
•
•
•
•
•
Drilling
techniques
•
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
what method, etc).
•
Drill sample
recovery
•
Method of recording and assessing core and chip sample recoveries and results
assessed.
Measures taken to maximise sample recovery and ensure representative nature of
the samples.
Whether a relationship exists between sample recovery and grade and whether
•
•
•
•
•
Diamond drilling was used to obtain HQ size core, with the weathered (friable)
core split using a chisel/hammer and fresher (competent) core cut using a
diamond blade core saw.
Samples were taken along the depth intervals and lithological sub-division
mark-ups to gather representative samples.
Sampling consists of approx. 1m samples of ½ core with breaks at lithological
discontinuities - typical 1-7kg.
Samples were oven dried, manually crushed to -2mm, split twice through a
50/50 riffle splitter to obtain a representative sub-sample of approx. 100g,
and then pulverise that >85 % pass -75 μm.
The pulp samples were sent to an accredited laboratory (ALS) in Perth,
Australia for determination of total iron and a standard “iron suite” of
elements by XRF analyses using techniques ME-XRF21u for standard iron-ore
XRF analysis and method ME-GRA05 for LOI analysis.
QA/QC procedures applied with alternating standards and blanks inserted
every 20 samples, and four duplicates (field and lab) inserted every 100
samples.
Conventional wireline diamond drilling was used to obtain all drillcore and
drilling was undertaken with an EP200 man portable drilling rig. Nominal core
diameter is 63.5mm (HQ) in 0.5-1.5m runs. Drill holes are inclined at -90°
(vertical) and core is not orientated. A total of 61 diamond holes (BEKD223 to
BEKD283) and 508.01m drilled.
Core recovery is measured every run by geologists.
Core recoveries of 93% on average were achieved for sampled core.
No bias or relationship has been observed between recovery and grade.
Criteria
JORC Code explanation
Logging
•
•
•
sample bias may have occurred due to preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and geotechnically logged to
a level of detail to support appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel,
etc) photography.
The total length and percentage of the relevant intersections logged.
Commentary
•
•
•
•
•
•
•
•
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet
or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
A set of standard operating procedures for drilling and sampling were
prepared by the company and Vato Consulting, who is supervising the
program, and these are always adhered to.
All drill core is logged quantitatively using industry standard practice on site in
enough detail to allow mineral resource estimates as required.
Logging included: core recovery %, primary lithology, secondary lithology,
weathering, colour, grain size, texture, mineralisation type (generally
magnetite or hematite), mineralisation style, mineralisation %, structure,
magnetic susceptibility (see below), notes (longhand).
All core is photographed both wet and dry and as both whole and half core.
All core is geotechnically logged and RQD’s calculated for every core run.
All drill holes are logged using a ZH-SM30 magnetic susceptibility meter to
enable accurate distinction of iron (magnetite) rich units and to potentially
differentiate between magnetite and hematite rich mineralisation. Readings
recorded in 25cm intervals.
Density measurements are made using both the Archimedes method (mainly
fresh competent rock) and the Caliper Vernier (mainly weathered friable rock)
methods.
All drill holes logged in their entirety.
•
For metallurgical test work a total of 77 diamond drillholes were selected for
12 DSO composite samples based on sufficient core material and
representative grades available. For the selected drillholes the core samples in
storage were extracted and sampled again. The weathered (friable) core
material was split ½ using a chisel/hammer and fresher (competent) core
material was cut ½ using a diamond blade core saw. Samples were taken along
the depth intervals and lithological/sampled sub-division mark-ups per
drillhole and “domain” to gather the composite samples. The “domains” were
selected to be reflective and similar to the future mining production zones.
See attached Table summarising the DSO composite sample details.
•
Metallurgical samples were sent to ALS (Spain) for independent analysis by
XRF.
No additional quality control samples were included. ALS conduct their own
•
7
Criteria
JORC Code explanation
•
Verification of
sampling and
assaying
•
•
•
•
Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of
bias) and precision have been established.
The verification of significant intersections by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Commentary
internal quality control procedures to ensure acceptable levels of accuracy.
•
•
•
•
•
Location of data
points
•
•
•
Data spacing
and distribution
•
•
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
•
•
•
•
Orientation of
data in relation
to geological
structure
•
•
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this should
be assessed and reported if material.
•
•
All work was completed by Vato Consulting personnel and all mineralised
intervals were checked by Vato Consulting’s Principal Geologist.
Two twin holes have been completed, namely BEKD279 (twin hole of
BEKD100) and BEKD283 (twin hole of BEKD121). Some variation in the
lithologies exist, and the distribution of grades generally correlates well.
All data was recorded on paper logs and after captured using Seequent
MXDeposit database software.
No adjustment to assay data has been made.
Final collar locations have been completed at the end of the drilling program
by using differential GPS (dGPS) (with an accuracy to cm).
The grid system used is UTM, WGS84, Zone 38 Southern Hemisphere
An accurate topographic survey was completed in 2021 by FUTURMAP, a local
surveying consultant. The survey was conducted using PHANTOM 4 Pro type
drones, and a pair of LEICA System 1200 dual frequency GPS. An accuracy of
10mm horizontal and 20mm vertical is quoted.
Data spacing nominally at 50m x 50m for infill drillhole collars within the
mineralisation zones with downhole sample spacing averaging 0.83m, under
geological control. The high-grade iron mineralisation (56-67%Fe) suitable for
Direct Shipping Ore (DSO) within the regolith (weathered/oxidized material) as
identified by previous drilling in 2020/2021/2022/2023 are covered by the
infill drilling program.
The data spacing and distribution is considered appropriate to establish
geological and grade continuity for the style of mineralisation being
intersected and the classification of Mineral Resources.
No samples were composited except for the metallurgical test work .
The ironstone unit has a strong north-south trend with a steep to shallow
westerly dip. The ironstone unit has a conspicuous regolith zone with
completely to highly weathered material up to 27m deep. The regolith hosts
iron mineralisation with enrich DSO parts.
Vertical drilling is undertaken to intercept mineralisation and test the
mineralisation in the regolith (weathered zone) and enrich DSO parts.
8
Criteria
Sample security
JORC Code explanation
•
Commentary
The measures taken to ensure sample security.
•
No sample known bias present.
•
Chain of Custody procedures are implemented to document the possession of
the samples from collection through to storage, customs, export, analysis, and
reporting of results. Chain of custody forms are a permanent records of
sample handling and off-site dispatch.
The on-site Geologist is responsible for the care and security of the samples
from the sample collection to the export stage. Samples prepared during the
day are stored in the preparation facility in labelled sealed plastic bags.
The metallurgical test work laboratory confirmed and labelled samples as
soon as they were received from the independent courier, following their
internal sampling protocol and operating procedures. Samples were
confirmed with the Company once logged into the laboratory system. .
No audit has been conducted.
•
•
Audits or reviews
•
•
The results of any audits or reviews of sampling techniques and data.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status
•
•
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Commentary
•
•
•
The Company completed the acquisition of the minority interest in Iron Ore
Corporation of Madagascar sarl held by Cline Mining Corporation on 5 August 2020.
The Company holds through Iron Ore Corporation of Madagascar sarl, Universal
Exploration Madagascar sarl and a Farm-in Agreement 12 exploration permits in three
geographically distinct areas. All administration fees due and payable to the Bureau du
Cadastre Minier de Madagascar (BCMM) have been and accordingly, all tenements are
in good standing with the government.
The tenements are set out in the below
9
Criteria
JORC Code explanation
Commentary
Exploration done
by other parties
•
Acknowledgment and appraisal of exploration by other parties.
•
Geology
•
Deposit type, geological setting and style of mineralisation.
•
•
•
•
Drill hole
Information
•
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for
all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
•
Exploration has been conducted by UNDP (1976 - 78) and BRGM (1958 - 62). Final
reports on both episodes of work are available and have been utilised in the recent IGR
included in the Akora prospectus. Airborne magnetics was flown for the government
by Fugro and has since been obtained, modelled and interpreted by Cline Mining and
Akora.
Iron mineralisation at Bekisopa is believed to be of metasomatic origin and
preferentially hosted by calc-silicate rocks within a high-grade metamorphic sequence.
The mineralisation occurs as a series of magnetite bearing gneisses and calc-silicates
that occur as zones between 50m and 150m combined true width.
The mineralisation occurs as layers of massive magnetite (sometimes altered to
hematite) between 1m and 7m true width plus a lower grade zone that consists of
lenses, stringers, boudins and blebs of magnetite aggregates that vary from 1cm to 10’s
of cm wide within a calc-silicate/gneiss unit (informally termed “coarse disseminated”
here). These units sometimes have an outer halo of finer disseminated magnetite
(informally termed “disseminated” here).
This wide mineralisation halo provides a large tonnage potential over the 6-7km strike
of mapped mineralisation and associated magnetic anomaly within the Akora
tenement.
All relevant drillhole information related to the 2020/2021/2022/2023/2024 drilling
programs have been previously reported to the ASX. No material changes have
occurred to this information since it was originally reported.
•
10
Criteria
JORC Code explanation
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths and
intercept lengths
•
Diagrams
•
•
•
Balanced
reporting
•
Other
substantive
exploration data
•
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high-grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (eg ‘down hole length, true width not
known’).
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar locations
and appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
contaminating substances.
Commentary
•
•
None used. All assays reported as received.
Not relevant – exploration results are not being reported; a Mineral Resource has been
defined.
•
Not relevant – exploration results are not being reported; a Mineral Resource has been
defined.
•
Not relevant – exploration results are not being reported; a Mineral Resource has been
defined.
•
All relevant results of the test work presented are being reported in this release.
•
In June 2024 Akora completed 400 meters of geotechnical drilling at Bekisopa in the
northern, central and southern resource areas. The 8 by 50 meters holes are designed
to inform the PFS on rock mechanics and rock strength to support mining method
development.
Bekisopa Hydrogeological drilling was completed in August 2024 with two 150 meter
deep bore holes and two adjacent 70 meter deep observation wells to test for the
presence on subsurface water and test water recharge characteristics.
•
•
Further work
•
•
The nature and scale of planned further work (eg tests for lateral extensions
or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
•
Complete the Pre-Feasibility Study by Wardell Armstrong International.
11
Appendix 2:
Table summarizing Bekisopa DSO composite sample details:
DSO MET SAMPLE #1
Drillhole_ID
From_m
To_m
Gross_weight
Total_kg
BEKD001
0.00
6.90
6.23
BEKD019
0.00
4.59
9.19
BEKD023
0.00
2.23
4.01
BEKD024
0.00
3.90
9.67
BEKD149
0.00
6.00
9.08
BEKD151
0.00
2.97
2.55
BEKD156
0.00
7.40
11.59
BEKD159
0.00
4.58
8.10
60.43
DSO MET SAMPLE #2
Drillhole_ID
From_m
To_m
Gross_weight
Total_kg
BEKD025
7.51
13.00
12.76
BEKD152
10.32
15.65
9.60
BEKD153
9.72
11.38
3.04
BEKD154
7.80
11.49
6.55
BEKD161
11.88
15.72
6.53
BEKD212
5.62
8.75
5.09
BEKD213
9.20
17.36
15.24
58.80
DSO MET SAMPLE #3
Drillhole_ID
From_m
To_m
Gross_weight
Total_kg
BEKD004
BEKD039
BEKD040
BEKD182
0.00
0.00
0.00
0.00
4.67
5.76
1.80
2.32
11.19
9.24
3.15
3.57
BEKD184
BEKD185
BEKD187
BEKD188
BEKD189
BEKD196
BEKD199
BEKD200
0.00
0.00
2.94
0.00
0.00
0.00
0.00
0.00
2.27
4.72
6.55
1.70
2.20
3.96
4.30
2.58
3.54
8.02
7.06
1.56
3.50
5.06
5.02
2.54
BEKD203
BEKD205
0.00
0.00
2.37
3.64
3.03
5.02
71.51
DSO MET SAMPLE #4
Drillhole_ID
From_m
To_m
Gross_weight
Total_kg
BEKD029
0.00
6.24
14.24
BEKD120
0.00
2.98
5.29
BEKD121
0.00
5.67
10.24
BEKD122
0.00
5.31
10.35
BEKD123
0.00
4.63
8.27
BEKD146
0.00
4.42
9.70
58.08
DSO MET SAMPLE #5
Drillhole_ID
From_m
To_m
Gross_weight
Total_kg
BEKD031
4.41
8.19
7.05
BEKD124
3.71
9.60
13.68
BEKD131
3.06
10.05
15.05
BEKD132
4.82
12.59
15.40
BEKD133
6.41
8.80
3.15
54.32
DSO MET SAMPLE #6
Drillhole_ID
From_m
To_m
Gross_weight
Total_kg
BEKD032
0.00
5.41
10.28
BEKD033
0.00
4.50
9.23
BEKD034
0.00
4.90
8.25
BEKD13